CEA DSM Irfu SIS 9th stabilization meeting Status of pole tips measurement.

Slides:



Advertisements
Similar presentations
EPOCH 1000 Series Procedure Conventional Angle Beam Calibration
Advertisements

Auto slide change for this page, WAIT…..
One Arm Cavity M0 L1 L2 TM M0 L1 L2 TRIPLE QUAD 16m R = 20m, T=1% R = ∞, T=1%  Optimally coupled cavity (no mode matched light reflected back)  Finesse.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Laser Doppler Vibrometer (LDV)
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
EPOCH 1000 Series Procedure Phase Array Straight Beam Calibration
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
Development of a mover having one nanometer precision and 4mm moving range Y. Morita, S. Yamashita ICEPP, University of Tokyo Y. Higashi, M. Masuzawa,
LumiCal Alignment System Status report Leszek Zawiejski, Tomasz Wojtoń, Arkadiusz Moszczyński Institute of Nuclear Physics PAN, Cracow 25th FCAL Collaboration.
1 Advanced Sensors Lecture 6 Sensors Technology AUE 2008 Bo Rohde Pedersen.
NorCal Tech 2005 Technical Conference
Typical Steps of field Balancing Illustration with model 907
Introduction to Waves Auto slide change for this page, WAIT…..
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
Waves in our world Part 1- Longitudinal and Transverse Waves and communication.
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
Parameters, pulse parameters, attenuation, and resolution.
FIBER OPTIC STRAIN SENSORS Beril Bicer University of Illinois at Urbana-Champaign.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Techniques to approach the requirements of CLIC stability K. Artoos, O. Capatina (speaker), M. Guinchard, C. Hauviller, F. Lackner, H. Schmickler, D. Schulte.
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
Fiber-Optic Accelerometer Using Wavefront-Splitting Interferometry Hsien-Chi Yeh & Shulian Zhang July 14, 2006.
Thermal noise issues Chinyere Ifeoma Nwabugwu Louisiana State University August 05, 2005 Eric Black, Akira Villar, Kenneth G. Libbrecht, Kate Dooley, Royal.
Confidential / Property of Danfoss Drives A/S DD-SMT/DEJ 1 Drives Division VLT ® AutomationDrive FC302 PM Motors Configuration procedure By:
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg XFEL beam dynamics meeting, February 25 st 2008.
Multimodal sensors & digital interfaces. Credits The original Multimodal Project developed by and credit for: Zhigang Zhu and Weihong Li (Integration.
LBT Progress Report, Feb Marco Xompero 1/14 P45 Test Results and beyond… Marco Xompero Daniela Zanotti Armando Riccardi.
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
D. Missiaen Summaries of the discussion. 2 H. Mainaud Durand The iris diaphragm laser alignment system for Spring 8 storage ring magnets Align multipoes.
Fig. 3 Wind measurements experimental setup Lidar (light detection and ranging) operates using the same concept of microwave RADAR, but it employs a lot.
LASER SCANNERS Imaging system provides a user with a dense set of three- dimensional vectors to unknown points relative to the scanner location Unprecedented.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
WEATHER SIGNALS Chapter 4 (Focus is on weather signals or echoes from radar resolution volumes filled with countless discrete scatterers---rain, insects,
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
CEA DSM Dapnia DIRAC-Phase-1 Annual Report meeting Status of the R3B-GLAD Magnet DIRAC-Phase-1 Annual Report Meeting 26 September 2006 Bernard Gastineau.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
Ground Motion spectra status A.Jeremie on behalf of the DESY EUROTeV group which ceased to exist mid-2008 : R.Amirikas, A.Bertolini and W.Bialowons (et.
STABILISATION AND PRECISION POINTING QUADRUPOLE MAGNETS IN THE COMPACT LINEAR COLLIDER S. Janssens, P. Fernandez Carmona, K. Artoos, C. Collette, M. Guinchard.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
The Nature of Light  Light is the only form of energy that can travel like a wave through empty space and some materials.  It behaves like a special.
Target Engagement Graham Flint - General Atomics Tom Lehecka - Penn State Electro-Optics Center Bertie Robson - NRL HAPL Project Review Oak Ridge National.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Electron beams in order to sense nm-size mechanical vibrations? CERN: Marek Gasior: BBQ electronics (Andrea Boccardi: VME electronics) Juergen Pfingstner:
FP7: EuCARD after a year of preparation… A.Jeremie.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
ESS wire scanner Benjamin Cheymol
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
UPM, DIAC. Open Course. March FIBER 2.1 Nature of Light 2.2 Refractive Index 2.3 Fiber Structure 2.4 Waves 2.5 Rays.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
EXAMPLE: Graph 1 shows the variation with time t of the displacement d of a traveling wave. Graph 2 shows the variation with distance x along the same.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Nano stabilisation studies for CLIC
David Urner Oxford University/JAI
Summary FD Support System
10th stabilization meeting
Status of Vibration Measurement Work at BNL
4th stabilization meeting
Status of the TESLA Magnet Package and Vibrations at TTF
Dual Nature of Light Then there was light!.
(Based on medium) 2. Mechanical Waves
Final Review part Two.
Presentation transcript:

CEA DSM Irfu SIS 9th stabilization meeting Status of pole tips measurement

CEA DSM Irfu Status Choice of the measurement device –Requirements –Tests results –Chosen sensor configuration Pole tips measurement on CERN mock-up (dec. 2010) –Measurement configuration –Solutions to be studied Preliminary tests at Saclay –Glue tests –Reflecting surface –Mechanical support –Measurement intent on IPHI mockup Planning 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)2

CEA DSM Irfu 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)3 Choice of the measurement device : requirements –Requirements : –Characteristics to be described Amplitude accuracy1nm and < Amplitude resolution0.1 nm and < Frequency range1 to 100 Hz Measurement frequency>400 Hz Maximum velocity1 m.s -1 Ability to cross a 60mm long hole in the yokeMax 6mm diameter Interferometer’s typeMichelson, Fabry-Pérot, Doppler… Acquisition systemAnalog/digit - I/O Other parameters acquisition requirementTemp, press, hygrometry, etc… Reflecting surfaceλ/? Reflection necessary for optimal measurement Measurement distance range0 to …? m Other requirementsProtection, vacuum conditions, influence of magnetic fields, etc…

CEA DSM Irfu 09/03/2010-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)4 Choice of the measurement device : tested sensors Instrument Characteristics RENISHAWATTOCUBESIOSPOLYTEC FIBER VIBROMETER INTERFEROMETER TYPE MichelsonFabry PérotMichelsonDoppler Differential modeYesNo Yes Distance measurement range 0 to 0.6m0 to >1m according to the sensor According to the sensor According to the focusing lens range Special requirement Protection from turbulences To be determined Cost (k€)70 to to to 60 ValidationNo YesNo

CEA DSM Irfu 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)5 Choice of the measurement device : POLYTEC fiber vibrometer tests results 100 Hz BadGood ampl 230nm ampl 16nm ampl 3.2nm ampl 190nm ampl 18nm ampl 1.9nm Capacitive senson Geophone Vibrometer 10 Hz Tests results on CERN bench (graphics by M. Guinchard) Impossibility to have a measurement result at 1 Hz : sensor rejected

CEA DSM Irfu Choice of the measurement device : chosen sensor configuration Available configurations 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)6 Commercial config. Reflector typeMax. speed Resolution (nm) Range measurement (mm) Connected sensors per acquisition unit Price (k€) Triple axis SP- TR λ/10 mirror to 1 according to working distance 0 à Adjustable focus LSV All type of reflecting surface à Mono-axis SPS All type of reflecting surface λ/10 mirror for max. resolution à 70, Chosen configuration (02/08/2010 meeting CR-MF/ a) : 3 axis working on differential mode or independently Angle measurement available ±0.3 mrad Beams distances 13mm I/O analogical or digital-32bit mode (atmosphere correction factor included on digital mode only)

CEA DSM Irfu 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)7 Pole tip measurement on CERN mockup : measurement configuration measurement on yoke 3- measurement on pole 2- measurement on pole (2-3) horizontal wave propagation on pole tip (1-2) and (1-3) vibration measurement between yoke and pole tip Measurement conditionsPurposeResults No controlled vibrationSee cultural noise influence on pole tips FFT spectrum Calibrated vibration on yokeSee propagation on yoke and poles FFT spectra and propagation diagrams Calibration vibration on girderSee girder’s influence on transmitting vibrations FFT spectra and propagation diagrams 3 measurement positions

CEA DSM Irfu Pole tips measurement on CERN mockup : solutions to be studied All tests can be performed before on a similar device at Saclay 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)8 Supporting sensor Drilling hole (angle and diameter) Reflecting surface (glued or polished?) Girder and actuators for controlled movements

CEA DSM Irfu Preliminary tests at Saclay : glue tests and reflecting surface choice Purpose : –Verify that no damping due to the glue alter the displacement measurement –Choose the glue type (wax, araldite, other?) –Time effects on glue –Test : 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)9 Signal comparison OK : mirror glued NO: surface to be polished

CEA DSM Irfu Preliminary tests at Saclay : mechanical support design Mechanical problemOption chosen for Saclay test Vibrometer supportGlued or tightened on the yoke or independent Reflecting surface mountingMirror glued on an invar made wedge Hole drilled in yokeØ3mm wished, test on a vibrometer next Thursday 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)10

CEA DSM Irfu Preliminary tests at Saclay : measurement intent IPHI mockup 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)11 Reflecting surface and glue tests Vibration transmission tests Sensor mechanical interface Hole diameter test

CEA DSM Irfu 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)12 Planning TaskJFMAMaJuJAoSONDJFM Sensor bought and delivered Reflector and sensor tests Mechanical interface design Measurements on IPHI mockup Design and fabrication of mechanical interface for CERN mockup 1 point measurement on CERN mockup N points measurement on CERN mockup

CEA DSM Irfu Next steps Hole diameter test on Thursday Sensor device order march-april Sensor delivery 12 weeks after (?) Mirrors and wedges bought in march 25/09/2008-MichelFontaine- CLIC Stabilisation ("pied de page" et "date" -> onglet menu Affichage/En-tête)13