MKD Reliability run Viliam Senaj TCM meeting 18/11/2014.

Slides:



Advertisements
Similar presentations
Electromagnetic shower in the AHCAL selection criteria data / MonteCarlo comparison of: handling linearity shower shapes CALICE collaboration meeting may.
Advertisements

SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
M. Palm, CERN1 Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA.
Analysis Meeting – April 17 '07 Status and plan update for single hadron scale check with minimum bias events N. Davidson.
LHC Beam Dumping system
TS2-SPS & TS1-LHC. TS2-SPS (On Monday 15th of June for 24hrs) SPS – HW: Replacement of HV Switch PFN 7 MKP (Impact 65420) SW: « Smooth » upgrade in accordance.
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
FHCT SEB cross-section measurements at H4IRRAD and with cosmic rays and its influence to LHC abort system reliability Viliam Senaj RadWG meeting 04/10/2011.
MKD stack upgrade MKD generator meeting Viliam Senaj 23/06/2015.
LBDS commissioning – MKD tests Viliam Senaj, 11/12/2013.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Proposed LHC beam dumping kicker generator modifications for LS2 TE-TM Meeting Viliam Senaj 07/07/2015.
MPPC R&D status Kobe Univ. CALICE collaboration meeting Yuji SUDO Univ. of Tsukuba ~ contents ~ Introduction Linearity curve Recovery time.
6.11 Vocabulary Electromagnet: type of magnet in which the magnetic field is produced by a flow of electric current Core: metal (iron) center of an electromagnet.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
CHAPTER 11 Op-Amp Applications. Objectives Describe and Analyze: Audio mixers Integrators Differentiators Peak detectors Comparators Other applications.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
LHC Beam Dumping System Status and Readiness for LHC Run II Evian Workshop 2-4 June 2014 Nicolas Magnin – TE/ABT/EC On behalf of TE/ABT team. Thanks to.
LIBD on LBDSmeeting Viliam Senaj 04/02/2014. MKB test MKB vacuum level satisfactory for beginning of HV test: – B1: between 3.1x10 -7 and 5.7x10 -7 (new.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LBDS Power Triggering Etienne CARLIER & Jean-Louis BRETIN AB/BT/EC.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LBDS KICKERS MPP workshop - Annecy Nicolas Magnin TE-ABT-EC.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Update on Material Studies - Progress on Linearity using calib-hits (very brief) - Revisiting the material problem: - a number of alternative scenarios.
COGGING MEETING Cogging Semi-Fine Adjust without collisions? Fine Adjust When? Cogging Meeting – Sophie BARON.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
KIRCHHOFF’S CIRCUIT LAWS Voltage Rule Current Rule.
MKD dust related actions Viliam Senaj Technical Coordination Meeting 27/01/2015.
Jean-Paul BURNET, AB/PO ATC-ABOC days, 22 January 2007 PS Main Power System: What has been done from June 2006? What will be the situation in 2007? PS.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
J. Pedersen, ST/EL Consolidation of the CERN technical infrastructure and civil engineering. J. Pedersen ST 6 th ST workshop, Thoiry, 1 – 3 April 2003.
1 ABTEF - 16/05/2014 Maintenance of safety-critical systems : LBDS - MKD / MKB on LHC.
YETS LHC 2015/16 - ABT Group TCM Francesco castronuovo.
Survey of R04 Data quality check of R04 Conclusion Checks of the R04 Data Quality outline Jin Yi May 25, 2004BES Annual Meeting JieXiu, Shanxi.
NEXT EXCELLENCE IN SOLID STATE PULSED POWER BY SCANDINOVA SYSTEMS AB Klas Elmquist.
YETS status report TCM Francesco castronuovo.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
YETS status report TCM Francesco castronuovo.
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
LBDS MKD tracking related problems. Outline tracking problems: Exchange of MKD compensation/principal PS Same BETS limit for all generators.
FHCT SEB cross-section measurements at H4IRRAD and consequences for MKD reliability Viliam Senaj LIBD meeting 24/01/2012.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
LBDS YETS activity report Viliam Senaj MKD meeting, 19/01/2016.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
The LEP Superconducting RF system has reached its maximum configuration of 288 four-cell cavities powered by 36 klystrons in In 2000, this system,
Proposition of MKD & MKBH modification with the goal to reduce maximum voltage (and risk of erratic) Viliam Senaj, 05/05/2017.
Fast High Current Thyristor SEB test
LHC Beam Dumping System Reliability Run Summary
MKD/MKB Review Meeting Scope and Definition
Viliam Senaj MKD meeting 23/05/2017
Overview of LBDS related tasks
Upcoming longitudinal MDs
BC2 Commissioning Parameters
High gradients in TESLA nine-cell cavities
Read Delay Simulations
مديريت موثر جلسات Running a Meeting that Works
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Probing deeper into matter …
PSB magnetic cycle 160 MeV to 2 GeV with 2.5E13 protons per ring
LHC FMCM Project 1.

Status of the retriggering boxes and measurements
Presentation transcript:

MKD Reliability run Viliam Senaj TCM meeting 18/11/2014

Tests performed on generators Since 01/10: – LBDS1: 11 ES up to 7.1 TeV (55 pulses at each energy) + ~ TeV + ~ TeV GeV – LBDS2: 14 ES up to 7.1 TeV (70 pulses) + ~ TeV – No real reliability run because of too high temperature at UA63/67 (VAC group maintenance) – Modification performed: Compensation voltage setting at low energies (up to 800 GeV) to make R_end curve more flat Increase of bias voltage to 280 V (from 270 V) in order to reduce R_1 at low energies (>7.5%)

Problems observed B2: 24 V PS inside PTU B2: 150 V PS inside PTU Compensation PS 4 kV PS inside PTU

Still to be done New ES; generating new settings, tracking limits… Reliability run…