M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware and Analysis Status Brief overview of muon arm Physics goals-->implied performance requirements Status.

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

J/  measurement with the PHENIX muon arms in d-Au interactions at √ s NN = 200 GeV David Silvermyr, LANL APS April Meeting Philadelphia, April 5-8, 2003.
Commissioning the PHENIX RPC Forward Trigger Upgrade Michael Daugherity Abilene Christian University for the PHENIX Collaboration.
Heavy flavor production in sqrt(s NN )=200 GeV d+Au Collisions at PHENIX DNP 2013 Matthew Wysocki, Oak Ridge National Lab Newport News, Virginia, Oct 25,
Quarkonia Production in p+p, d+Au and A+A from PHENIX Melynda Brooks Los Alamos National Laboratory For the PHENIX Collaboration Melynda Brooks, LANL,
Muon Tracker Overview The PHENIX Muon Arms detect vector mesons decaying into muon pairs, allow the study of the Drell-Yan process, and provide muon detection.
South Arm FEE Performance Prior to Au run, all FEMs installed and working. Currently, 157 of 168 FEMs read out useful data. = 93.5% operational FEM losses:
In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to efficiently identify photons and electrons.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
Performance of the PHENIX Muon Tracking System in Run-2 Ming X. Liu Los Alamos National Lab (for the PHENIX Collaboration) –Detector Commissioning –Detector.
LBNE R&D Briefing May 12, 2014 LBNE R&D Briefing May 12, 2014 LArIAT and LBNE Jim Stewart LArIAT EPAG Chair BNL LBNE LARIAT-EPAG J. Stewart BNL T. Junk.
LANL work on Au+Au data MVD past, present, future J/    +  - Open charm Forward/backward hadrons Future interests.
Zhengyun YOU, FVTX Review Nov FVTX Software and Simulation Zhengyun You Los Alamos National Laboratory.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
M. Brooks, LANL 1 Physics and Simulation Status and To-Dos Physics Section could probably use a top-down re-write. Most of the info is probably there but.
CBM Collaboration Meeting 1 Simulation Status V. Friese.
RHIC/HENP Physics Program at LANL Parton structure, modification in nuclei, spin-dependence and the Quark Gluon Plasma(QGP): Flavor asymmetry of the nucleon.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
Nov2,2001High P T Workshop, BNL Julia Velkovska High pt Hadrons from  sNN = 130 GeV Au-Au collisions measured in PHENIX Julia Velkovska (BNL) for PHENIX.
J/  measurement in d-Au interactions at s NN = 200 GeV David Silvermyr, LANL Physics Motivation - J/  production, gluon shadowing. Run-3 d-Au (2003)
Andrew Glenn 4/21/02 Commissioning and Performance of the. Muon Identifier Andrew Glenn (University of Tennessee), for the PHENIX collaboration April APS.
Non-identified Two Particle Correlations from Run I Understanding drift chamber tracking – Tracker and candidatory – Two particle efficiencies/ghosts A.
U N C L A S S I F I E D 7 Feb 2005 Los Alamos RHIC Program David M. Lee Heavy Ion and Medium Energy 7 February 2005.
1 Behaviour of the Silicon Strip Detector modules for the Alice experiment: simulation and test with minimum ionizing particles Federica Benedosso Utrecht,
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
MuID Software Status/Future Plan Yajun Mao (RIKEN/CIAE) PHENIX Muon Collaboration Meeting, BNL, Dec. 16, 2000.
M. Brooks, 17-Jul-03 PHENIX Review July 17, 2003 p-p Physics from Muon Arm—J/  Melynda Brooks RHIC and the PHENIX Detector Physics Goals of the PHENIX.
PHENIX Run8 Summary d+Au was fantastic! - x30 over Run3 baseline for future A+A new level of precision on intrinsic Cold Nuclear Matter physics now p+p.
Bernhard Schmidt DESY - HH PRC open session, October 30, 2002 HERA-B.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Measurement of J/  -> e + e - and  C -> J/  +   in dAu collisions at PHENIX/RHIC A. Lebedev, ISU 1 Fall 2003 DNP Meeting Alexandre Lebedev, Iowa State.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Performance of the PHENIX Muon Identifier Introduction Calibration with cosmic rays Performance in Au+Au collisions Summary Hiroki Sato, Kyoto University.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Muon detection in NA60  Experiment setup and operation principle  Coping with background R.Shahoyan, IST (Lisbon)
PERFORMANCE OF THE PHENIX SOUTH MUON ARM Kenneth F. Read Oak Ridge National Lab & University of Tennessee for the PHENIX Collaboration Quark Matter 2002.
1 FVTX Simulation and Analysis Software Zhengyun You Los Alamos National Laboratory Nov
PHENIX STATUS W.A. Zajc Columbia University for the PHENIX Collaboration.
PHENIX Timetable FY 2002 FY 2003 Prepare S  S  with Au-Au beams May 2001 March 2002 Jan 2001 June 2002 Sept st  physics (J/  suppression &
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
1 NCC Task Force Richard Seto NCC Task Force Meeting Jan 8, 2007 BNL.
P+p J/  results from PHENIX Run-2 Hiroki Sato, Kyoto University for the PHENIX collaboration RBRC Workshop “ Current and Future Directions at RHIC ” BNL,
Forward Trigger Upgrade and AuAu Pattern Recognition V. Cianciolo, D. Silvermyr Forward Upgrade Meeting August 18-19, 2004.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
Performance and Early Results from the Muon Tracking System of Rusty Towell of Abilene Christian University for the PHENIX collaboration First Joint Meeting.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Search for a New State of Matter A state of matter not seen since the first few microseconds after the Big Bang is the object of study of P-25 physicists.
Reduction of Background in Observation of W Decay Using the Forward Vertex (FVTX) detector at PHENIX Abraham Meles New Mexico State University APS April.
Search for a Standard Model Higgs Boson in the Diphoton Final State at the CDF Detector Karen Bland [ ] Department of Physics,
M. Brooks, 28-Mar-02 Heavy/Light meeting 1 Muon Analysis Work Getting Code ready for first data pass - DONE Get ready for second pass on DSTs - muon identification.
Status of the STAR tracking upgrade Gerrit van Nieuwenhuizen STAR Collaboration Meeting BNL, February 24, 2005.
Muon Arm Physics Program Past, Present + Future Patrick L. McGaughey Los Alamos National Laboratory Santa Fe June 17, 2003.
Jamaica 11 Jan.8, 2009 Muon Trigger Upgrade at PHENIX RIKEN/RBRC Itaru Nakagawa RIKEN/RBRC Itaru Nakagawa.
MICE Tracker Software A. Dobbs CM32 9 th Feb 2012.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
PHENIX J/  Measurements at  s = 200A GeV Wei Xie UC. RiverSide For PHENIX Collaboration.
David M. Lee Los Alamos National Laboratory DOE Review of the Heavy Ion Program Agenda Introduction – Joel Moss 1. David M. Lee – KB02 program.
MAUS Status A. Dobbs CM43 29 th October Contents MAUS Overview Infrastructure Geometry and CDB Detector Updates CKOV EMR KL TOF Tracker Global Tracking.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Particle detection and reconstruction at the LHC (IV)
Status of the TOF Detector
Tatia Engelmore, Columbia University
Data Analysis in Particle Physics
Quarkonium production in ALICE
Heavy Ion Physics in RUN14-16
Susan Burke, University of Arizona
Presentation transcript:

M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware and Analysis Status Brief overview of muon arm Physics goals-->implied performance requirements Status of system and hardware performance Analysis plans Status of software and analysis

M. Brooks, 29-Jan-02 P-25 Review PHENIX Experiment MVD - multiplicity and vertex Beam-Beam - trigger, time Central Arms: |y| <.35 (±20 o ),  = 180 o high occupancy excellent p resolution PID covering wide p range and particle types Detect e, , , K Muon Arms: 1.2 < |y| < 2.4,  = 360 o lower particle multiplicity higher geom. acceptance Detect single and di- muons complimentary to Central arm measurements Goals: Search for multiple signatures of the QGP Measure spin contributions from gluons and anti-quarks, through multiple channels Study p-nucleus interactions

M. Brooks, 29-Jan-02 P-25 Review Physics Goals of Muon Subsystem Contribute to systematic study of expected QGP signatures: Debye screening --> varying suppression of vector mesons (J/ ,  ’,  ) Strangeness production --> enhancement of  other? Charm production -->cross section measurement, understanding required for background subtraction (from single  s or e-  coincidence) p-Nucleus experiments: study of nuclear effects (shadowing, energy loss, etc.) p-p: spin structure of the nucleon

M. Brooks, 29-Jan-02 P-25 Review PHENIX Muon System Overview LANL responsible for “South” muon tracker system (mechanics, electronics, oversight); North mechanics and help with installation Muon Tracker specifications 3 stations of cathode-strip chambers 6,6,4 readout planes per station 100  m resolution per plane various stereo angles Noise  2 adc counts on strips Good track finding in Central Au-Au events

M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware Status South arm installation “complete” early 2001 with electronics fully functional and a few HV channels not working No data until summer 2001 Lost access to inside of magnet in spring Lost 8/168 FEMs entirely, few more with data problems==> much larger fraction of dimuon acceptances loss (~40%). But stable since spring of 2001 High humidity of summer uncovered HV sensitivity to humidity. Many channels disabled. Also found: various mapping problems, some channels which don’t work even with low humidity SHUTDOWN PLAN: Fix electronics (pull off station 1) fortify chambers against humidity Add shielding to station 2 Change station 1 HV distribution

M. Brooks, 29-Jan-02 P-25 Review South Arm: Hardware Workers People available for south installation: Full-time at BNL 3 post-docs (Rusty, Ming, Dave B.), one experienced grad student (Andrew), 3 or 4 additional students, one dedicated tech Significant fraction at BNL: Melynda, Dick, Dave, Walt, Mike, Peter 2 from UNM (Nicki and Doug) 1 from NMSU (Steve) 2 from RIKEN (Jiro and Yuki) Available for North: 2 fewer post-docs (none with FEE experience) no experienced grad students similar number of other students and techs Significant fraction: 2 fewer staff from LANL. Same fraction from rest of staff? 1 from UNM not available until summer Added: French team, others? TO DO: North installation + south repair + finish North chamber bulding

M. Brooks, 29-Jan-02 P-25 Review South Arm: Analysis and Performance Status Physics from Year-1: Low luminosity, smaller integrated run time, plus detector inefficiencies left us with rather small data set for analysis (few hundred J/psis in both Au-Au and p-p runs; probably similar numbers of single muons at high p T ) Analysis of Year-1 data: What performance is required to extract physics? Data extraction working in PHENIX environment - DONE Reasonable electronics noise levels - DONE Calibrations working, at required precision - pretty much DONE Hit clusters found in Au-Au as well as p-p environment - DONE? Hit position extraction from clusters working - DONE to first order Track finding working well - code in place. Undoubtedly some tuning required Track reconstruction works well - seems to work reasonably well with Monte Carlo Alignment of tracker and tracker to other systems completed - in progress Muon Identification: finds roads in identifier, matches well with tracker system, separates pions from muons

M. Brooks, 29-Jan-02 P-25 Review Analysis and Performance Status--LANL Contributions Software: LANL almost solely responsible for MuTr software development to this point; expect to need to continue to play large role in maintenance and development of data analysis algorithms (Melynda, Mike, Ming, Pat, ?) Columbia and UNM recently started effort to re-write software “framework”, but will keep the same analysis algorithms that are currently in use French contributing to replacement of one of the track-fitting methods as well as general infrastructure maintainence (tutorials, writing of data-summary-tape, writing of micro-DST, etc.) RIKEN, Columbia working on understanding alignment of tracker system ORNL and associated institutions responsible for Muon Identification software

M. Brooks, 29-Jan-02 P-25 Review South Arm Performance Status--Noise and Calibration Station 2 ~ Station 3 ~ Station 1 ~ RMS noise Noise specs close to design, but not quite what is desired for long-term physics (  ) Calibration stability o.k.

M. Brooks, 29-Jan-02 P-25 Review South Arm Performance Status--Chamber Resolution Chamber resolution not quite up-to-spec for real data--probably easily explained Resolution good enough for year-1 analysis and probably even year-2

M. Brooks, 29-Jan-02 P-25 Review South Arm Performance Status--Other analysis software Alignment of tracker system still being worked on--required for track finding and reconstruction Monte Carlo studies indicate track finding and fitting working reasonably well though certainly some tuning is required Muon identifier suffered somewhat from higher occupancies than expected--partially corrected during run by shielding, will shield more next run. Needs some more work reducing number of tracks found in MuID system  /  separation needs some more attention to reduce background rates

M. Brooks, 29-Jan-02 P-25 Review South Arm: Analysis and Performance Status Plans for data reconstruction: First pass starting soon, to get data in time for Quark-Matter, July 2002 Expect second-pass to fix alignment, etc. Physics Working Groups forming task forces now Software working groups separate from PWG: trying to resolve now Analysis of Year-1 data: No students, but expressed interest to Heavy-Flavor group in j/psi and single-muon physics. Potential analysis contributors: Melynda, Dave, Mike, Ming, Pat, Joel, new post-doc (April), In addition, interest expressed by: ORNL/UT - 2 students, 1-2 post-docs 2+ staff, long-standing role in muon identification (Au-Au physics primarily) RIKEN - 1 student (spin physics), several staff NMSU - 1 student, 1+ staff (j/psi polarization) Columbia - 1 student, 1 post-doc, 1+ staff (single muons from Au-Au, J/psi) French - focus on year-2 data but want to be involved with year-1 analysis

M. Brooks, 29-Jan-02 P-25 Review Overall Schedule Analysis of Year-1 data Continued development of software and analysis tools for Year-2 data North arm assembly (pre-installation-chambers, electronics, etc.) Repair of South arm Installation of North arm chambers, electronics, plumbing, racks, alignment system, gas system, integration Shutdown begins now JanFebMarAprMayJunJulstaff Year-1 analysis? North Chambers6 N. FEE Assembly2+ South Repairs4-5 Chamber install,etc.~6 FEE Install~6 Next run: October 2002 (or later)