Group 2 - Project Update April 1, 2004 Tyler Helble.

Slides:



Advertisements
Similar presentations
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 9 Vinh Nguyen April 14, 2005.
Advertisements

ECE 135 – The Three Presentation 10 Bryan Chavez with Pat Cleary & Kevin Parker April 14 th, 2005 April 14 th, 2005.
Presenter: Kenny Haulk
Optical Link Budget ECE 4006 Gb Ethernet Optoelectronic Links.
Gigabit Ethernet EE 164 Group 2 – Presentation 7 Ungtae Lee April 8th 2004.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Rahmin Sarabi Adam Durity.
A PCB has 2 signal layers, a split power layer and one ground layer. It also has two solder mask and two silkscreen layers. Is the board classified as:
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1 Presentation 5 – Yashar Pirzadeh.
ECE 135 – The Three Presentation 8 Pat Cleary with Kevin Parker & Bryan Chavez March 24 th, 2005 March 24 th, 2005.
Project GabE ECE 135 – Spring 2005 Final Presentation Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
ECE 135. Opto-Electronics Design Project Spring 2006.
Presenter: Curtis Grens. 2 This Week’s Highlights The optical link budget completed and reviewed Financial budget in place Initial VCSELs and PDs ordered.
ECE4006 – Final Presentation Group 6, Spring 2003 Gigabit Ethernet Vikas Parekh.
Optical Gigabit Ethernet Group 4 Presentation 3 February 10, 2005 David Larado.
Optical Gigabit Ethernet Group F.O.R.E. Final Presentation Chris Abbott, Ronen Adato, David Larado 4/21/2005.
ECE 135 Final Presentation The Three … aka Pat Cleary with Kevin Parker & Bryan Chavez April 21 st, 2005 April 21 st, 2005.
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 2 Andrew Meyerson February 3, 2005.
Presenter: Nassisa-Geda Techane. 2 Highlights of the Last Two Weeks Midterm paper done! More tests to be performed on the board –Awaiting calibrated optical.
Gigabit Ethernet PMD ECE135 Group 2 – Presentation 4 Clifton Kerr February 17, 2005.
ECE 4006B Fall, 2002, Group 3, Man Le Progress Report Period (November 15-21, 2002) Finished alignment tolerance testing with Rx board (S7911 and PDT-
Intel/Agilent OE Group Karen Cano Scott Henderson Di Qian.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
ECE 4006B Fall, 2002, Group 3, Shahriar Khushrushahi Progress Report Period (September 5 – September 12, 2002) Cleared loose ends with respect to PDs and.
Project GabE ECE 135 – Spring 2005 Omar Al-Jadda Patrick Crosby Adam Durity Rahmin Sarabi.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Gigabit Ethernet EE 164 Group 2 – Presentation 3 Ungtae Lee February 19 th /13.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board continued  Order components for.
Gigabit Ethernet TxRx ECE Group 2 – Presentation 4 Andrew Tupper February 26, 2004.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Group 2 - Project Update Feb Tyler Helble.
Gigabit Ethernet PMD Opto-Link Inc. – Presentation 6 Bryan Justice March 10, 2005.
Optical Gigabit Ethernet Group 4 February 3, 2005 Ronen Adato.
Presenter: Allen Duncan April 10, Highlights of the Last Week Tested Receiver without optical link Used Al shield to determine EMI presence Conducted.
Project GabE ECE 135 – Spring 2005 Patrick Crosby Adam Durity Rahmin Sarabi Omar Al-Jadda.
ECE Group 2 – Presentation 8
ECE 135 – BtrLaytDanNvr Presentation 7
Optical Gigabit Ethernet
ECE4006 Group 6 – Presentation 5
ECE4006 Group 6 – Presentation 9
Jinesh Karia Rakesh Soni James Cummings Elisa Hurwitz Bishan Patel
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group6 – Presentation 6
Gigabit Ethernet Design ECE 4006C – Spring 2003
Capstone Design Update
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #11
Melanie Garrick Barry Mullins Nihar Patel Jason Young
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Presenter: Allen Duncan
ECE 4006-C Presentation the almost Last (10th)
Gigabit Ethernet Design ECE 4006C – Spring 2003
GIGABIT ETHERNET DESIGN ECE Spring 2004 Group 1
Gigabit Ethernet Design ECE 4006C – Spring 2003
ECE 4006 Group 6 – Presentation 8
Project GabE ECE 135 – Spring 2005
Optical Gigabit Ethernet
ECE135 Group 2 – Presentation 3
Capstone Design Update
Optical Gigabit Ethernet
PLANNED WORK for week #10 (week of Oct. 28 – Nov. 3) PROGRESS
Progress Report (October 2 - 9, 2002)
GROUP 1 FINAL PRESENTATION
Project GabE ECE 135 – Spring 2005 Presentation 10
Task List Group management plan Background studies
Gigabit Ethernet Design ECE – Spring 2004
Group 5 – ECE 4006: Week 6 Nihar Patel 7/17/2019.
Project GabE ECE 135 – Spring 2005 Week 9
ECE 4006-B GIGABIT ETHERNET GROUP #7 Update Presentation #10
Capstone Design Update Week 9 ECE 4006 – Group 1
Presentation transcript:

Group 2 - Project Update April 1, 2004 Tyler Helble

Progress Report Finalized TX/RX Board Design Ordered TX/RX Boards from Express PCB Ordered Passives, VCSEL, and PD Soldered components Tested TX/RX Aggressive and Non- Aggressive Revised Gantt Chart Published Midterm Report

TX/RX Board Design

Aggressive Design Standard Design

PCB Board – Solder Side

PCB Board – Ground Plane

PCB Board – VCSEL, PD, Passives PD Hamamatsu S5973 VCSEL Lasermate Hamamatsu S5973

PCB Board – Soldered Components PD VCSEL

TX/RX Test Results Initial Tests Revealed no power to TX chips. Board was getting hot. Found solder link between power and ground, etched it out. Retested and obtained decent eye results using the probe. (VCSEL not attached yet)

TX/RX Test Results – using probe

TX/RX Test Results Received visible eye on Agilent osciliscope.

TX/RX Test Results RX board powered up, chips receiving power Aligned fiber using XYZ stage in lab No signal from the SMA connector Tried to detect signal with probe, no luck

TX/RX Test Results Using the XYZ Stage to align The fiber and PD

Future Plans Solder VCSEL and test today Test PD separately to double check pins/light detection Pray