J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects.

Slides:



Advertisements
Similar presentations
IDM2004 G. Gerbier LSM - Fréjus underground sites status and projects Gilles Gerbier CEA/Saclay - LSM.
Advertisements

Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
11/05/06GDR-Neutrino à Orsay (LAL)1 GDR-Neutrino (10-11 mai 2006) L. Mosca (CEA-Saclay) The MEMPHYS project (Laboratory excavation) MEgaton Mass PHYSics.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
 RNB 6The beta-beam study group The Beta-beam Mats Lindroos on behalf of the The beta-beam study group.
Michel Spiro Particle Physics at the Megawatt proton source. CERN 27 May 2004 Long-range programme in neutrino physics: superbeam, β beam, neutrino factory.
Alain Blondel CHIPP Neutrino meeting NEUCHATEL June 2004.
Thomas Nilsson and Mats Lindroos on behalf of the
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
How Will We See Leptonic CP Violation? D. Casper University of California, Irvine.
Alain Blondel Detectors UNO (400kton Water Cherenkov) Liquid Ar TPC (~100kton)
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
NEUTRINO PROPERTIES J.Bouchez CEA-Saclay Eurisol town meeting Orsay, 13/5/2003.
Alain Blondel Neutrino Factory scenarios I will endeavour to address some principle design issues related to the physics use of high intensity muon beams.
The meeting in Paris: The agenda has been built and optimized.
Moriond meeting Accelerator based Neutrino beams Mats Lindroos.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.
NuFact'06, Aug. 2006A. Fabich, CERNRadioactive Ion Beams, 1 Radioactive Ion Beams A. Fabich, CERN on behalf of the Beta-beam Study Group
1 Further Demands on beam Intense, Intense, Intense, ….Intense, Intense, Intense, …. –Very far detector, extremely small cross section, search small osci.
BETA-BEAMSBETA-BEAMS Piero Zucchelli On leave of absence from: High Energy Physics and INFN - Sezione di Ferrara M. Mezzetto D. Casper M. Lindroos A. Blondel.
Forewords: A - newborn (few weeks) - immature - crawling - trivial new But new concept to produce neutrino beams First Public Presentation Therefore: Your.
Beta-beam study group Letter of Intent beta-beam design study Mats Lindroos On behalf of the Beta-beam working group.
A neutrino program based on the machine upgrades of the LHC Pasquale Migliozzi INFN – Napoli A. Donini, E. Fernandez Martinez, P.M., S. Rigolin, L. Scotto.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
-NUCLEUS INTERACTIONS OPEN QUESTIONS and FUTURE PROJECTS Cristina VOLPE Institut de Physique Nucléaire Orsay, France.
Road Map of Future Neutrino Physics A personal view Ken Peach Round Table discussion at the 6 th NuFACT Workshop Osaka, Japan 26 th July – 1 st August.
M. LindroosNUFACT06 School A low energy accumulation ring for the beta-beam Ansgar Simonson, Anders Kaellberg, Mats Lindroos.
05/02/08 EUROnu, Elena Wildner, CERN, 05/02/ EURO Beta Beams Kick-off meeting  Elena Wildner, CERN.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Highlights of Tuesday’s session Machine aspects Copyright © Dale Carnegie & Associates, Inc.
Neutrino Physics Opportunities for Fermilab Steering Group 6/12/07 Andy Lankford UC Irvine.
A new underground laboratory at Frejus Jacques Bouchez CEA-SACLAY NNN05-Aussois April 7, 2005 Historical overview Latest developments Outlook.
Pre-  Factory Possibilities Leslie Camilleri CERN, PH Scoping Study Meeting Imperial College May 6, 2005.
Super Beams, Beta Beams and Neutrino Factories (a dangerous trip to Terra Incognita) J.J. Gómez-Cadenas IFIC/U. Valencia Original results presented in.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
NUFACT’06 Summary of working group 1 Neutrino Oscillations Experiments Mark Messier Indiana University August 30, 2006.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
SPL, Beta beams and the Neutrino Factory. Leslie Camilleri NuSAG 20th May 2006.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
J. Bouchez CEA/DAPNIA NuFact 03 June 5,2003 BETA BEAMS : design update and physics reach Physics motivation Recent progress on design Expected performances.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
BETA-BEAMS 363 days after Piero Zucchelli - CERN M. Mezzetto D. Casper M. Lindroos U. Koester S. Hancock B. Autin M. Benedikt H. Haseroth M. Grieser A.
Energy Dependence and Physics Reach in regard to Beta/EC Beams J. Bernabeu U. Valencia and IFIC B. Pontecorvo School September 2007.
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Jacques Bouchez Radioactive Beams for Nuclear and Neutrino Physics Les Arcs Mars 2003.
Elena Wildner, CERN Beta Beams GDR Neutrino 20 juin 2012 to 21 juin 2012 at APC, Paris.
PPAP Review 09 Imperial College/RAL Dave Wark Future Neutrino Oscillation Experiments Dave Wark Imperial/RAL PPAP Birmingham July 15 th, 2009.
EUROnu Review: 14 th April 2011 EUROnu Introduction and Objectives Neutrino oscillations: much interest since 1 st paper in extension required to.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
Beta beams Jacques Bouchez CEA Salay/ APC Paris Basics of beta beams The baseline CERN scenario Higher energy beta beams Other ideas Conclusions POFPA.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
IPHC-IN2P3/CNRS Strasbourg
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Status of the beta-beam study
Superbeams with SPL at CERN
Status of the BETA-BEAM Task within the EURISOL Design Study
A High Intensity Neutrino Oscillation Facility in Europe
Institut de Physique Nucléaire Orsay, France
The SPL-based Proton Driver at CERN
Presentation transcript:

J. Bouchez CEA/DAPNIA CHIPP Neuchâtel June 21, 2004 A NEW UNDERGROUND LABORATORY AT FREJUS Motivations and prospects

EDELWEISS II Set up Paraffin Ge Lead He NEMO 3 PRESENT EXPERIMENTS

How to overcome superbeam limitations ? Main problem : SPL protons produce less negative pions, so less antineutrinos antineutrino cross-section ~ 5 times smaller than neutrinos So 10 SPL years have to be shared as ~ 2 neutrino + 8 antineutrino years The solution : Produce a e beam to study e    oscillation and run it SIMULTANEOUSLY with   beam from SPL Compare   e and e    (T asymetry, equivalent to CP asymetry) THIS WAS THE INITIAL MOTIVATION FOR A BETA BEAM

BETA BEAMS Concept proposed by Piero Zucchelli Produce radioactive ions (ISOL technique) Accelerate them in the CERN accelerator complex up to  of order 100 Store ions in a storage ring with long straight sections aimed at a far detector Advantages strongly focussed neutrino beam due to small Q value of beta decays (quality factor  /Q) very pure flavour composition (   contamination ~ ) perfectly known energy spectrum Baseline scenario studied at CERN (Mats Lindroos and collaborators) Possible synergy between beta beams and EURISOL (Moriond workshop) Updated study of expected performances (Mauro Mezzetto)

Intensities (original design) Stage 6 He 18 Ne (single target) From ECR source: 2.0x10 13 ions per second0.8x10 11 ions per second Storage ring: 1.0x10 12 ions per bunch4.1x10 10 ions per bunch Fast cycling synch: 1.0x10 12 ion per bunch4.1x10 10 ion per bunch PS after acceleration: 1.0x10 13 ions per batch5.2x10 11 ions per batch SPS after acceleration: 0.9x10 13 ions per batch4.9x10 11 ions per batch Decay ring: 2.0x10 14 ions in four 10 ns long bunch 9.1x10 12 ions in four 10 ns long bunch Only  -decay losses accounted for, add efficiency losses (50%)

baseline scenario updated for new conditions: simultaneous running of He 6 and Ne 18 new values of gamma factors 3 Eurisol targets for Ne 18 antineutrino flux from He 6 ( γ=60) /second neutrino flux from Ne 18 ( γ=100) /second

How to improve the fluxes ? R&D on ISOL targets Increase ion collection time (factor 1.5 to 2) Flat bottom in the SPS (factor 1.5) Faster PS (factor 2 or more due to less transmission losses) Improvement factors of 5 or more seem realistic For the sensitivity studies, improvement factors of 2.8 for He 6 and 6.3 for Ne 18 have been chosen. These numbers will be refined (among others) in the new version of the baseline scenario within 1 year antineutrino flux from He 6 ( γ=60) /second neutrino flux from Ne 18 ( γ=100) /second

Performances of super + beta beams Working hypotheses (Mauro Mezzetto): Announced intensities for e and anti  e (with 3 ISOL targets for Neon ) UNO-like detector installed at a new Frejus underground laboratory 10 years running of both SPL and beta beam : - 2 years of  - 8 years of anti  - 10 years of e - 10 years of anti e Since 18 Ne and 6 He ions do not have the same rigidity, the anti e energy will be 1.67 times the e energy THIS NEEDS TUNING TO FIND THE BEST COMPROMISE

Lorentz boost optimization : Preferred values between  = 55 and 75

Rates for 4400 kT.years cc evts (no osc, nocuts) oscillated at Chooz limit total oscillated (δ=90 0,  =3 0 ) δ term beam background detector background beta beam superbeam He 6 Ne 18 ν μ anti ν γ=60 γ=100 2 y 8 y

 13 sensitivity (δ=0) after 5 years (Minos 2 years) 90%CL

   and  measurements using superbeam and betabeam SPL: 2 years in  + 8 years in anti  BETABEAM: 10 years of 6 He AND 18 Ne (Mauro Mezzetto)

90%CL sensitivity after 5 years (Superbeams νμ only)

99%CL sensitivity to maximal CP violation after 10 years (SPL-SB 2 years + 8 years)

3 σ discovery potential after 10 years

Conclusions Frejus (or TGV) tunnels offer an excellent quality underground site for megaton physics It is a the right distance from CERN to receive neutrino super and/or betabeams The Cerenkov technique is adequate given the low energy of the beams It offers the best sensitivity on  13 and δ compared to similar projects (HyperK, BNL/FNAL) France (IN2P3/CEA) and Italy (INFN) have agreed to join efforts for the promotion of this project There is a successful coordination between nuclear physicists pushing EURISOL and neutrino physicists (common TDS) The first experiment able to detect CP violation could be installed in Europe before 2020, and it would also address the fundamental question of proton stability with some chance of discovery.

Short term: present the project to the SPSC at Villars prestudy results for the cavity write a white paper continue simulations and optimizations

THE END (but to be continued) My warmest thanks to the all the people who have worked hard on this project Special thanks to Mats Lindroos Mauro Mezzetto

Design Study EURISOL Beta-beam Coordination Beta-beam parameter group Above 100 MeV/u Targets 60 GHz ECR Low energy beta-beam And many more… USERS Frejus Gran Sasso High Gamma Astro-Physics Nuclear Physics ( , intensity and duty factor) OTHER LABS TRIUMF FFAG Tracking Collimators US study Neutrino Factory DS Conceptual Design # with price ### M€

scenario 1 (refurbished SPS) He6 350 Ne scenario 2 (LHC)

scenario 1

scenario kt detector at 730 km (off peak)

: to be studied : Is it possible to reach equilibrium at higher gamma ? Need sizeable increase in accelerating power Size of the decay ring cost Which schedule? scenario 1: 2 year stop of SPS, after several years of LHC scenario 2: After LHC programm I consider this project as a potential 2 nd generation beta-beam, not a competitor to the standard beta-beam