P.Freijedo Date: 13.03.2015. Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Material samples provided by Niovawe: N22: Niobium.

Slides:



Advertisements
Similar presentations
THE HARDNESS ANALYSIS OF THE IF SHEET STEEL AFTER A PLASTIC DEFORMATION Mihaliková Mária – Ambriško Ľubomír – Pešek Ladislav Mihaliková Mária – Ambriško.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Lecture # 2 Allowable Stress Objective:
Comments to Manufacturing QA documentation
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Requirements for Manufacturing Readiness: (Beamtube Assembly only)
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION ILC08/ NAKAI HIrotaka KEK Material Property Study for High Pressure Code in KEK NAKAI Hirotaka (KEK)
Specification of niobium sheets 031/05/2010 O. Capatina G. Arnau Izquierdo W. Weingarten S. Atieh.
Documentation review: Beam tube assembly Comments given by CERN to the technical file submitted by Niowave prior to release for fabrication 16/10/20141.
C. Parente (HL-LHC Technical Quality Officer) Date:
Status of Activities at CERN
1 Full document available on EDMS Metallurgical qualification of AISI 316L TIG welded tubes Summery - Richard French.
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
Double click here to add event title Double click here to add event date Double click here to add event time Double click here to add event location.
S. Atieh EN-MME Manufacturing R&D for SPL β =1 cavities at CERN on behalf of the SPL cavities mechanical design and manufacturing team.
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
[Presentation Title] – Edit this footer by clicking on “View” tab,  “Slide Master” button  this slide’s layout [Date] Changing... Leading... Learning...
IT4009 Low carbon steel MSCTM, August 27, 2015 LMF + Marco Buzio, Alexandre Gerardin, Susana Izquierdo, Alessandro Parrella, Stefano Sgobba, Ezio Todesco.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
Documentation on present system and piping layout P. Tropea Tracker Upgrade Engineering and Cooling 12 November 2008.
TPSG4 Run 3 Konstantinos Karagiannis, on behalf of the TCD Team – January 20 th 2016.
Exercises in Hydraulic Bulge Testing H.S. Kim H. Lim Mike Sumption Ted Collings The Ohio State University Dept of Materials Science and Engineering Center.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Add your name here. Add the date here. Write the title of your persuasive speech here. It should have something to do with your topic, but it should not.
Engineering Design of Raon SC Cavities Myung Ook Hyun SCL Team Myung Ook Hyun SCL Team.
The reading is 7.38 mm. The reading is 7.72 mm.
P.Freijedo Date: Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CERN – Zanon discussions
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Preliminary analysis for the dressed LHC RF cavity (2) April 28th 2016 – EDMS L. Dassa, L. Mettler.
Crab Cavity HOM Coupler Specification Drawings & Tolerances
Question 1 A plat that is 250 mm wide and 25 mm thick is to be reduced in a single pass in a two‑high rolling mill to a thickness of 20 mm. The roll has.
Click here for the answer. Click here for the answer.
Date of download: 12/22/2017 Copyright © ASME. All rights reserved.
Click here for the answer. Click here for the answer.
Analysis of niobium material
Click here for the answer. Click here for the answer.
Surface morphology of p-GaAs
RM 2 7 +RM 2 4 RM 7 3 +RM 1 6 RM 5 2 +RM 2 4 RM 1 3 +RM5 2.
Title Arial – 30pt font Subtitle Arial Italic – 28pt font
Click here to add your title
Faculty of Humanities Insert title here.
Fatigue to Failure: FEA Predictions of Limit Conditions for Axial Fatigue Loading of Generic Coronary Stent Designs Part 2: Geometry 1 with EP correction.
STEP ONE. STEP ONE. STEP ONE. STEP ONE. STEP ONE. 02
회사 소개.
YOUR text YOUR text YOUR text YOUR text
CLICK TO ADD TITLE IN HERE
Faculty of Humanities Insert title here.
Refresh: Click Here.
2019/5/9 POWER YOUR POINT Add your text in here.
CLICK TO START.
C.2.10 Sample Questions.
Anil Mane, Qing Peng, Jeffrey Elam Argonne National Laboratory
Faculty of Humanities Insert title here.
C.2.8 Sample Questions.
CLICK TO START.
C.2.8 Sample Questions.
Dinosaur Research Report
Faculty of Humanities Insert title here.
单击此处添加文字标题 单击此处添加副标题.
Call Now : Click : -
Call Now : Click : -
Call Now : Click : -
Sample Proofs 1. S>-M A 2. -S>-M A -M GOAL.
Click to edit subtitle Click to edit title.
Click here to add your title
Presentation transcript:

P.Freijedo Date:

Click here to add footer 2 C. Parente (HL-LHC Technical Quality Officer) Material samples provided by Niovawe: N22: Niobium Thickness 4mm to cavity: Results of tensile tests in rolling and transverse direction: Rm= /- 2.9MPa / /- 1.3 Mpa Rp0.2= 79.4+/- 3.9MPa / /- 2.6 Mpa A(%)=62.4+/- 4.0% / /- 2.5% N23: Niobium-Titanium Thickness 25mm to beam tube: Results of tensile tests in rolling and transverse direction: Rm= /- 29.5MPa / / Mpa Rp0.2= /- 30.4MPa / / Mpa A(%)=17.0+/- 0.8% / /- 3.2% H8: Niobium Rod Thickness 16mm to beam tube: Results of tensile tests are NOT satisfactory: Rm= /- 2.4MPa Rp0.2= /- 4.3 MPa A(%) = 3% +/- 2.5% CONCLUSION: The Rod material is not annealed Test Reports here:

Click here to add footer 3 C. Parente (HL-LHC Technical Quality Officer) Beam tube for Crab Cavity Beam tube provided by Niovawe

Click here to add footer 4 C. Parente (HL-LHC Technical Quality Officer) The following tests have been performed to beam tube: -Ultrasonic test by Immersion: The results are satisfactory -Leak Test before and after thermal shocks in liquid nitrogen (five times): The results are satisfactory The following tests are on-going: -Control dimensional -Metallographic test Beam tube for Crab Cavity