Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.

Slides:



Advertisements
Similar presentations
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Advertisements

Overview of Capacity Building Committee Activities GEO Capacity Building Committee Meeting Brussels – 14 September 2006 Errol Levy DG Research – European.
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
1 Guy Duchossois, Work Plan Manager Report on 2006 Work Plan.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
UIC Draft Report to C4: Issues and Recommendations 25 September, 2008 The UIC Co-Chairs Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Remote Sensing at the service of Natural Disasters Warning: the Contribution of the Supersites Concept Professor Stuart Marsh Co-Chair GEO Institutions.
GEOSS Data Sharing Principles Alan Edwards European Commission Report to Capacity Building Committee May 22, 2008.
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
EGIDA Stakeholder Network and Advisory Board and Their Relevance for EGIDA and GEO Stefano Nativi 1 st Joint Workshop of the EGIDA Stakeholder Network.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
The IGWCO Transition into GEO August 2007 IGWCO Secretariat 7bis, avenue de la paix CH-1211 Geneva 2.
Promoting Awareness & Benefits of GEO EGIDA – WP3.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
The role of the GEO Geohazards Community of Practice for the Supersites Initiative The role of the GEO Geohazards Community of Practice for the Supersites.
The Contribution to GGOS from Asian Region Jong Uk Park & Young-Hong Shin Space Geodesy Division, Korea Astronomy and Space Science Institute, Daejeon,
The Global Geodetic Observing System: Meeting the Requirements of a Global Society on a Changing Planet in 2020 Hans-Peter Plag, Reiner Rummel, Dork Sahagian,
CEOS-CGMS Working Group on Climate John Bates, NOAA SIT-30 Agenda Item #11 Climate Monitoring, Research, and Services 30 th CEOS SIT Meeting CNES Headquarters,
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
CEOS Three-Year Work Plans and Kerry Ann Sawyer CEOS Executive Officer (NOAA) CEOS Plenary, Agenda Item 6 Tromsø, Norway October.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
The Group on Earth Observations (GEO): An Introduction.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Status of tasks AG-06-04, AR-06-09, CL-06-02, DA , DA Ivan Petiteville, CEOS Meeting #
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
GEO Geohazard Supersites Current Status and key challenges EGU 2013 Vienna Supersites Splinter Meeting.
CEOS EO Handbook & MIM Database Pascal Lecomte, ESA SIT Workshop Agenda Item #18 CEOS SIT Technical Workshop EUMETSAT, Darmstadt, Germany 17 th – 18 th.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Science and Technology Committee GGOS, December 2006.
AR WMO Information System (WIS) UPDATE REPORT TO ADC FEB.2008.
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
GEOSS User Needs and System Performance Utility (UNSPU)‏: First Experiences and Status Hans-Peter Plag, Nevada Bureau of Mines and Geology and Seismological.
GGOS Presentation to the CEOS Strategic Implementation Team 28th Meeting March 14, 2013 Hampton, VA, USA Proposed: CEOS Participation in the Decade Long.
CEOS Participation in GEO Work Plan Management Structure Agenda 5 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12.
Capacity Building Committee Architecture and Data Committee Meeting Seattle – July 2006.
Task AR-07-03: Global Geodetic Reference Frames “Ensure the availability of accurate, consistent, homogeneous, long- term stable, global geodetic reference.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
The CEOS Carbon Task Force Report SIT th – 28 th March 2012, La Jolla Takashi Moriyama (JAXA) & Diane Wickland (NASA) Carbon Task Force Co-Chairs.
Mapping (EGIDA/GEOSS) Stakeholders and STC Road Map Hans-Peter Plag Michael Nyenhuis.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
WA-06-05:  Title: Initiate the creation of a coordination mechanism within GEO for global in-situ water observations, including ocean observations, and.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
A GEO Label: Scope of Review Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
A GEO Label: Scope of Review Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
A GEO Label: Status, Issues, Next Steps Hans-Peter Plag IEEE University of Nevada, Reno, Nevada, USA;
The GEO User Requirements Approach to Achieving Societal Benefits Gary J. Foley, USA Ellsworth LeDrew, IEEE Thierry Ranchin, France Francesco Pignatelli,
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
An orientation about the activities of ST related to “GEO label” and Data Citation Standard by Bente Lilja Bye and Hans-Peter Plag on behalf of GEO.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-6 prepared by Hans-Peter Plag (IAG/GGOS)‏ Nevada Bureau of Mines and Geology and Seismological.
The ADC, the CBC and the UIC Where Should These Committees Be Interacting? Gary J. Foley, USEPA Co-Chair User Interface Committee July 20, 2006.
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
The GEO-Label: a Service for Data Users and a Tool for Facilitating Societal Benefits of Earth Observations Hans-Peter Plag University of Nevada, Reno,
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
GEOSS Data Sharing Principles
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
CEOS Work Plan Steven Hosford WGCV-43/WGISS-45 10th April 2018
Enabling Climate Services – The Group on Earth Observations (GEO) Barbara J. Ryan Director, GEO Secretariat GFCS Dialogue Geneva, Switzerland 01 July.
CEOS Work planning Steven Hosford, ESA/CNES, CEO
CEOS Virtual Constellations Process Paper
CEOS Work Plan Progress Report & Update
CEOS Work Planning Steven Hosford, ESA/CNES, CEOS Executive Officer
CEOS Work Plan Progress Report
Presentation transcript:

Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological Laboratory University of Nevada, Reno, Nevada, USA

Recalling: Task AR-07-03: Global Geodetic Reference Frames “Ensure the availability of accurate, consistent, homogeneous, long- term stable, global geodetic reference frames as a mandatory framework and the metrological basis for Earth observation.” Goals: User requirement coordination: Establish a comprehensive GEOSS database of user requirements concerning georeferencing and geodetic reference frames by identifying, describing and establishing links to relevant user communities in the nine societal benefit areas and conducting appropriate surveys. Georeferencing: Ensure the availability of appropriate global geodetic reference frames for GEOSS. Task proposed by International Association of Geodesy (IAG)/Global Geodetic Observing System (GGOS)

Task Progress and Status: Task Sheet Updated on May 10, 2007: Work description unchanged POC: IAG/GGOS (Hans-Peter Plag) Lead organization: IAG/GGOS Current contributions: - Germany - CEOS - IAG/GGOS - Korea (new member) - Italy (new member) - U,K. (expected to become member) Additional contributions: - Through GGOS 2020: more than 40 Experts (including IGOS-P, GLOSS, GOOS, GCOS) Deliverables in 2007: GGOS 2020 Reports GGOS 2007 Workshop

Task AR is on the list of Early Achievements to be included in the Report to the EOS in November 2007 (see one-page Early Achievement report)

GGOS 2020: The Global Geodetic Observing System: Meeting the Requirements of a Global Society on a Changing Planet in 2020 Output: Two documents: - Strategy document: short document for politicians, decision makers, funding agencies - Reference document: long, comprehensive document with all the user requirements and details of GGOS in 2020 mainly for those actually doing the work Status: Version 0.17 of the Reference Document released on May 10 th for internal review in IAG and Task Team Schedule: Needs to be discussed in the ADC! GG S 2020

Goal: Prepare GGOS 2020 documents for endorsement by the GEO Plenary in November 2007 Proposed Schedule: - Internal (Task and IAG) hearing deadline June 20, Final drafts available July 1, July 1 - July 20: Hearing in the GEO ADC (by ), with the goal to get the okay from ADC for external hearing phase (this is required by the GEO Secretariat in order for them to distribute the document for hearing); - July 20 - August 25: External hearing phase; - August 25 - August 31: Final editing; - September 12-13: Formal endorsement of documents by the ADC during the ADC meeting in Washington, DC; - September 14-25: Potential edits requested by the ADC; - September 25: Final documents available for GEO Plenary. GG S 2020

After GGOS 2020:

GG S 2020 After GGOS 2020: Workshop is part of the International Geohazards Week Workshop is outreach activity to space agencies and geohazards community Workshop is a GEO/GGOS workshop Registration and abstract submission open (see

GG S 2020 Actions for the ADC Discuss proposed schedule for the GGOS 2020 documents: Goal is to have the documents ready for consideration by the GEO Plenary in November 2007procedure for endorsing the GGOS 2020 documents Pending Action from ADC-3: How to describe/store/catalogue the User requirements (User needs utility)? Development since ADC-3: Discussion is in progress in UIC and the U.S. GEO UIC group Proposal to be submitted for consideration by ADC-5