International Satellite Communications System (ISCS) Re-competition September 2002.

Slides:



Advertisements
Similar presentations
Information Technology and Communication Services 2013.
Advertisements

International Satellite Communication System – ISCS Systems Transition and STAR 4 Workstation Replacements IMPLEMENTATION - COORDINATION MEETING ON THE.
Evolution of NGN and NGA scenario in Nepal Nepal Telecommunications Authority.
NSF ANNUAL REVIEW June 2010 Ocean Observatories Initiative Terrestrial CyberPoPs and Network.
Tier I Working Group 4 th Quarter FY 2011 November 18, 2011.
ISABP-X, Arraial do Cabo, 23 – 27 August 2004 Argos: Where we are – Where we’re going by Debbie Shaw Service Argos, Inc.
NOAA WEATHER WIRE SERVICE Operations
1 International Satellite Communications System (ISCS) April 2, 2011 Robert Gillespie Program Manager for the ISCS National Oceanic and Atmospheric Administration.
INTERNATIONAL SATELLITE COMMUNICATIONS SYSTEM (ISCS) SUCESSOR TCP/IP SYSTEM Background - Status – Backup RA IV/WG-PIW-04/Doc. 5.2(1) ISCS Status (13.X.2004)
INTERNATIONAL SATELLITE COMMUNICATIONS SUCCESSOR SYSTEM (ISCS)
Broadband Satellite Terminal (BST)
NCEP Production Suite Review NWS Integrated Dissemination Program
Simon Stewart Satellite Gateway Technician IP Convergence: The Future of Satellite Communications.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
DCMA Wide Area Workflow Presented By: Carol Albany, DCMA e-Business October, 2005.
GOES Direct Services. Topics  Direct Broadcast Services  GOES Data Collection Services  Search and Rescue.
Update On The NEXRAD Agency Plans For Near Real-Time WSR-88D Base Data Collection And Distribution Tim Crum, Ph.D. Radar Operations Center (ROC) NWS Focal.
NOAA WEATHER WIRE SERVICE Operations
Outline 1. Introduction 2. Ground Satellite receivers operated by RA- V member countries 3. Common Major applications of satellite data in RA-V 4. Important.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
Presented to: NWS Partners August 5, 2013 Jim McNitt Project Manager Office of Science and Technology National Weather Service National Oceanic and Atmospheric.
FCC Satellite Forum March 21, 2005 Mobile Broadband Solutions Robert Hanson Vice President - Regulatory Affairs.
NOAA’s NWS Telecommunication Gateway RTH Washington
Don McDaniel, DIS Network Services Division Administrator Next Generation State Network.
TECHNOLOGY AND THE BOND PROGRAM TECHNOLOGY PLAN
ITSS Roundup 11 September 2008 Groupware Project Mark Norman.
By : Brittany, Colleen, Jackie, and Laura
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Identifying Application Impacts on Network Design Designing and Supporting Computer.
ERCOT PMO Update Robert Connell Director Program Management Fourth Quarter Results (Through 12/31/04) January 11, 2005.
AWIPS-II Data Delivery Project Overview December 2013.
The University of Texas at San Antonio The Office of Information Technology Network Upgrade Overview.
MAIL IRREGULARITY REPORTING MTAC Meeting February 5, 2004.
2015 Bonanza Creek LTER Information Management Jason Downing 21 February 2015.
Follow us on: TAMU Jobs Online System Upgrade Presented to HR Liaison Network Fall Meeting 2012 October 31, 2012.
LATIN AMERICA Country Profile Project. Country Profile POLITICAL FEATURES: population, major cities, type & structure of government, national leader(s)
Accessing and Utilizing AMDAR Data for NWP Applications David R. Helms Office of Science and Technology NOAA National Weather Service AMDAR Regional Workshop.
NOAA Satellite Proving Ground/User Readiness Meeting
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicITE I Chapter 6 1 Identifying Application Impacts on Network Design Designing and Supporting.
1 Service-wide VRS Deployment Briefing Video Relay Service Agency-Wide Shared Services Special Projects Office NTEU Re-Briefing August, 2010 *Updates and.
1 Standard Float Cycle  Drifting Depth: 1000 m  Profiling Depth: 2000 m  10 Days Cycles.
1 Next Generation Manitoba Provincial Data Network Scope Background Architecture Satellite Network.
Running more bandwidth for less dollars State of Arkansas Network Upgrades.
Paul Seymour NOAA/NESDIS/OSPO GEONETCast Americas Program Manager.
General Services Administration GSA SmartPay® 2 Background & Recompetition Overview David J. Shea Director, GSA SmartPay® SGTP 2006 Education Conference.
1 Trinidad and Tobago Network Meeting Status of Compliance and Impcom Results Status of Compliance and Impcom Results Data Reporting Data Reporting Establishment.
Modernization of the Harris County Flood Control District Flood Warning System Telemetry Network National Flood Warning Workshop Houston, Texas February,
Months of the year. jANUARY New year’s day fEBRUARY Valentine’s day.
National Centers for Environmental Prediction: COPC Data Distribution Systems – IDP & NWSTG Michelle Mainelli Deputy Director, NCEP Central Operations.
Kelsey and Sadie 9A. The First Subway Subway was established in 1965 by Fred De Luca and Peter Buck.
NSF ANNUAL REVIEW June 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Terrestrial CyberPoPs Implementation Matthew Arrott, Mark James, Brian.
Azerspace-1 Satellite Azercosmos OJSC guide
NOAA Satellite Direct Readout Conference Welcome! – to the 2011 NOAA Direct Readout Conference! Kathleen Kelly Director, Office of Satellite Products and.
NOAA NWS Telecoms Report & WMO CBS Issues APSDEU-10 BoM - Melbourne, AU Feb 2010 Fred Branski, Intl Requirements and Data Liaison Office of the Chief Information.
DHHS COE Meeting Agenda May 19, 2011 Welcome Introductions Contract Compliance Reporting Questions and Answers DHHS Open Windows Update.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
AVIATION WEATHER Presented by: John Staples, Director of Flight Service Program Operations October 13, 2004.
Village of Woodridge, IL ERP System and Implementation Services Vendor Pre-Bid Meeting August 28, 2013.
CGMSSEC/EUMETSAT, v1, 8 May 2014 Coordination Group for Meteorological Satellites - CGMS EUMETSAT and regional- based requirements for data access Slide:
Requirements for IP Based UMTS A Consensus View from the Industry
Data Center Stabilization
Navigating Domestic & International Markets
Main Street Improvements
International Satellite Communications System (ISCS)
San Diego County & Imperial County
Capabilities of TIS-B for Supporting ASAS
GISC Washington status Kari Sheets Agenda item
ICAO Programme Elements on Aviation Safety
Licensing Overview May 2019.
Statewide Migration to an Emergency Services IP Network
Background - Status – Backup
Presentation transcript:

International Satellite Communications System (ISCS) Re-competition September 2002

2 ISCS Re-competition Network Features Network Changes/Improvements Broadcast Bandwidth Changes Site Equipment Replacements Workstations Schedule Network Diagrams End User Site Listing

3 Network Features C-band satellites with full coverages in AOR and POR –Compatible with site-owned VSAT equipment –Full coverage to all existing users –Expandable to future sites –Options to upgrade receive sites to 2-way 24/7 operation for real-time collection and broadcast of weather products GRIB, BUFR, T4-FAX, and text products

4 Network Changes/Improvements IP capability added to existing X.25 –NWSTG broadcast will be XoI Interfaces changed at NWSTG and Sites –Site FRAD replaced with interface box –Sites will have both X.25 and IP capabilities –X.25 phased out when all workstations are replaced ( 1 st quarter CY 2004 is target ) –Socket streaming output and FTP input added to NWSTG

5 Broadcast Bandwidth Changes 64 Kbps baseline bandwidth for AOR & POR –Separate IP Sockets for AOR & POR provide opportunity for different data content Increased data rates available as options –Selectable at 25%; 50%; 75% or 100% increase Capable of bursting during high data volumes

6 Site Equipment Replacements Technology Substitution provisions –Option to replace VSATs or interface equipment –Permits performance improvements or upgrades –Replacement of aging equipment –Funded by sources yet to be determined

7 Workstations Workstations are not included in procurement NWS International Activities responsible for workstation activities

8 Schedule RFP release February 1, 2002 Contract Award originally scheduled for October 1, 2002 will probably slip until November Complete deployment August 1, 2003

9

10

11

12

13 AOR Receive Sites (WAFS) RA-III ArgentinaBoliviaBrazil (2 sites) ChileEcuadorParaguay Peru (2 sites)SurinamUruguay Venezuela RA-IV AnguillaBermudaCanada Cuba – AeroportDominicaMexico –Aeroport MontserratSt. KittsSt. Vincent TortolaU.S. - Silver SpringU.S. – Kansas City U.S. – Camp Springs RA-VI AzoresUnited Kingdom

14 AOR 2-Way Sites (RMTN) RA-I Niger RA-III ColumbiaFrench GuianaGuyana RA-IV AntiguaArubaBahama Barbados (2 sites)BelizeCayman Islands Costa RicaCuba (Met Service)Curacao Dominican RepublicEl SalvadorGrenada GuadeloupeGuatemalaHaiti HondurasJamaicaMartinique Mexico (Met Srvc)NicaraguaPanama Saint LuciaSint MaartenTrinidad & Tobago U.S. Silver SpringU.S. San Juan, PRU.S. Coral Gables

15 POR Receive Sites (WAFS) RA-II China Peoples RepJapan Korea Korea Peoples RepChina - TaiwanViet Nam RA-III Easter Island RA-V American SamoaAustraliaBrunei Caroline IslandCook IslandEast Timor FijiFrench PolynesiaIndonesia Johnston IslandKiribatiMariana Island Marshall IslandsNauruNew Caledonia New Zealand (2 sits)Niue Isl. (Korea)Papua New Guineea PhilippinesSamoaSolomon Islands TongaVanuatuWallis Island U.S. - Honolulu