Tools of quality.

Slides:



Advertisements
Similar presentations
Quality control tools
Advertisements

Statistical Control Charts
Chapter 6 - Statistical Process Control
Control Charts for Variables
Statistical Process Control
7 QC Tools: The Lean Six Sigma Pocket Toolbook
1 Managing Quality Quality defined Total cost of quality Strategic Quality –Total quality management (TQM) –Continuous improvement tools Quality assurance.
Chapter 9A Process Capability and Statistical Quality Control
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
ENGM 620: Quality Management Session 8 – 23 October 2012 Control Charts, Part I –Variables.
6-1 Is Process Stable ? The Quality Improvement Model Use SPC to Maintain Current Process Collect & Interpret Data Select Measures Define Process Is Process.
Quality management: SPC II
Slide 1 Choosing the Appropriate Control Chart Attribute (counts)Variable (measurable) Defect Defective (MJ II, p. 37) The Lean Six Sigma Pocket Toolbook,
Chapter 6 - Part 1 Introduction to SPC.
Process Improvement and Process Capability © Christian Terwiesch 2003.
Agenda Review homework Lecture/discussion Week 10 assignment
Chapter 10 Quality Control McGraw-Hill/Irwin
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Statistical Process Control (SPC)
Chapter 10 Quality Control McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Defects Defectives.
Methods and Philosophy of Statistical Process Control
X-bar and R Control Charts
1 Our Process ElevationArm Tower FrontBack. 2 Operational Definition Need two things: –a method of measurement or test –a set of criteria for judgment.
Statistical Process Control
Chapter 9 Quality Management – Focus on 6 Sigma
Statistical Applications in Quality and Productivity Management Sections 1 – 8. Skip 5.
Process Capability Process capability For Variables
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Developed by Jim Grayson, Ph.D Flowchart [p ] Check Sheet [p ] Histogram [p ] Pareto [p ] Cause-and-Effect [p ]
Overview of Total Quality Tools
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
Statistical Process Control
Process Capability and Statistical Process Control.
Chapter 13 Statistical Quality Control Method
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Measure : SPC Dedy Sugiarto.
Statistical Quality Control
1 Six Sigma Green Belt Introduction to Control Charts Sigma Quality Management.
Statistical Process Control. A process can be described as a transformation of set of inputs into desired outputs. Inputs PROCESSOutputs What is a process?
1 Slides used in class may be different from slides in student pack Technical Note 8 Process Capability and Statistical Quality Control  Process Variation.
Statistical Process Control Production and Process Management.
1 SMU EMIS 7364 NTU TO-570-N Control Charts Basic Concepts and Mathematical Basis Updated: 3/2/04 Statistical Quality Control Dr. Jerrell T. Stracener,
Quality Control  Statistical Process Control (SPC)
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
In the name of Allah,the Most Beneficient, Presented by Nudrat Rehman Roll#
Quality Control Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
VARIABLE CONTROL CHART : Mean and Dispersion  - Chart  R - Chart  S - Chart.
1 Chapter 14 StatisticalProcessControl The Management & Control of Quality, 7e.
Tech 31: Unit 3 Control Charts for Variables
PROCESS CAPABILTY AND CONTROL CHARTS
Process Capability and Capability Index
Statistical Process Control
Statistical Process Control (SPC)
Optimizing and controlling process through statistical process control
Agenda Review homework Lecture/discussion Week 10 assignment
Statistical Process Control
Process Capability.
IENG 484 Quality Engineering LAB 3 Statistical Quality Control (SPSS)
Presentation transcript:

Tools of quality

Quality Lecture: Tools of Quality 2/4/2013 Process Analysis

7 QC Tools: The Lean Six Sigma Pocket Toolbook Quality Lecture: Tools of Quality 2/4/2013 7 QC Tools: The Lean Six Sigma Pocket Toolbook Flowchart [p. 116] Check Sheet [p. 95] Histogram [p. 129] Pareto [p. 178] Cause-and-Effect [p. 49] Scatter [p. 228] Control Chart [p. 75] Developed by Jim Grayson, Ph.D. Process Variability Concepts

Pareto Diagram Developed by Jim Grayson, Ph.D.

Quality Lecture: Tools of Quality 2/4/2013 Cause and Effect Diagram Developed by Jim Grayson, Ph.D. Process Variability Concepts

“Failure to understand variation is the central problem of management Developed by Jim Grayson, Ph.D.

Stable vs. Unstable process Stable process: a process in which variation in outcomes arises only from common causes. Unstable process: a process in which variation is a result of both common and special causes. Developed by Jim Grayson, Ph.D. source: Moen, Nolan and Provost, Improving Quality Through Planned Experimentation

Red Bead experiment Developed by Jim Grayson, Ph.D.

Red Bead Experiment What are the lessons learned? 1. 2. 3. 4. Developed by Jim Grayson, Ph.D.

Statistical Process Control: Control Charts Parameter Track process parameter over time - mean - percentage defects Distinguish between - common cause variation (within control limits) - assignable cause variation (outside control limits) Measure process performance: how much common cause variation is in the process while the process is “in control”? Upper Control Limit (UCL) Center Line Lower Control Limit (LCL) Time Developed by Jim Grayson, Ph.D.

Choosing the Appropriate Control Chart (MJ II, p. 37) Attribute (counts) Variable (measurable) The Lean Six Sigma Pocket Toolbook, p. 123 Six Sigma Mem Jogger p. 76 Defect Defective

Quality Lecture: Tools of Quality 2/4/2013 Different types of control charts Attribute (or count) data Situation Chart Control Limits Number of defects, accidents or flaws # of accidents/week # of breakdowns/week # of flaws on a product C U Six Sigma Memory Jogger, p. 78. source: Brian Joiner, Fourth Generation Management, p. 266-267. Tool: Control Chart

Quality Lecture: Tools of Quality 2/4/2013 Different types of control charts Attribute (or classification) data Situation Chart Control Limits Fraction of defectives fraction of orders not processed perfectly on first trial (first pass yield) fraction of requests not processed within 15 minutes p np Six Sigma Memory Jogger, p. 78. source: Brian Joiner, Fourth Generation Management, p. 266-267. Tool: Control Chart

Quality Lecture: Tools of Quality 2/4/2013 Different types of control charts Variables (or measurement ) data Situation Chart Control Limits Variables data, sets of measurements X-”BAR” CHART Xbar and R Charts R CHART See MJ II p. 42 for constants A2, D3 and D4. Six Sigma Memory Jogger, p. 79. source: Brian Joiner, Fourth Generation Management, p. 266-267. Tool: Control Chart

Different types of control charts Variables (or measurement ) data Situation Chart Control Limits Variables data, sets of measurements X-”BAR” CHART Xbar and R Charts R CHART See MJ II p. 42 for constants A2, D3 and D4. Six Sigma Memory Jogger, p. 79. source: Brian Joiner, Fourth Generation Management, p. 266-267.

Parameters for Creating X-bar Charts Six Sigma Memory Jogger, p. 81 MSWD p. 204.

What are the control limits for this process? Exercise An automatic filling machine is used to fill 16 ounce cans of a certain product. Samples of size 5 are taken from the assembly line each hour and measured. The results of the first 25 subgroups are that X-double bar = 16.113 and R-bar = 0.330. What are the control limits for this process? Source: Shirland, Statistical Quality Control, problem 5.2. Developed by Jim Grayson, Ph.D.

Given these charts, how do we know if the process is “in control”? Developed by Jim Grayson, Ph.D.

Conceptual view of SPC Developed by Jim Grayson, Ph.D. source: Donald Wheeler, Understanding Statistical Process Control

Process Stability vs. Process Capability Wheeler, Understanding Statistical Process Control Developed by Jim Grayson, Ph.D.

Quality Lecture: Tools of Quality 2/4/2013 Advantages of Statistical Control 1. Can predict its behavior. 2. Process has an identity. 3. Operates with less variability. 4. A process having special causes is unstable. 5. Tells workers when adjustments should not be made. 6. Provides direction for reducing variation. 7. Plotting of data allows identifying trends over time. 8. Identifies process conditions that can result in an acceptable product. Developed by Jim Grayson, Ph.D. source: Juran and Gryna, Quality Planning and Analysis, p. 380-381.

Identifying Special Causes of Variation source: Brian Joiner, Fourth Generation Management, pp. 260. Six Sigma Memory Jogger, p. 84-85. Developed by Jim Grayson, Ph.D.

Strategies for Reducing Special Causes of Variation Get timely data so special causes are signaled quickly. Put in place an immediate remedy to contain any damage. Search for the cause -- see what was different. Develop a longer term remedy. Developed by Jim Grayson, Ph.D. source: Brian Joiner, Fourth Generation Management, pp. 138-139.

“In a common cause situation, there is no such thing as THE cause.” Brian Joiner Developed by Jim Grayson, Ph.D.

Improving a Stable Process Stratify -- sort into groups or categories; look for patterns. (e.g., type of job, day of week, time, weather, region, employee, product, etc.) Experiment -- make planned changes and learn from the effects. (e.g., need to be able to assess and learn from the results -- use PDCA .) Disaggregate -- divide the process into component pieces and manage the pieces. (e.g., making the elements of a process visible through measurements and data.) Developed by Jim Grayson, Ph.D. source: Brian Joiner, Fourth Generation Management, pp. 140-146.

Quality Lecture: Tools of Quality 2/4/2013 A Conversation with Joseph Juran “Take this example: In finance we set a budget. The actual expenditure, month by month, varies - we bought enough stationery for three months, and that’s going to be a miniblip in the figures. Now, the statistician goes a step further and says, ‘How do you know whether it’s a miniblip or there’s a real change here?’ The statistician says, ‘I’ll draw you a pair of lines here. These lines are such that 95% of the time, you’re going to get variation between them.’ Now suppose something happens that’s clearly outside the lines. The odds are something’s amok. Ordinarily this is the result of something local, because the system is such that it operates in control. So supervision converges on the scene to restore the status quo. Notice the distinction between what’s chronic [common cause] and what’s sporadic [special cause]. Sporadic events we handle by the control mechanism. Ordinarily sporadic problems are delegable because the origin and remedy are local. Changing something chronic requires creativity, because the purpose is to get rid of the status quo - to get rid of waste. Dealing with chronic requires structured change, which has to originate pretty much at the top.” Source: A Conversation with Joseph Juran, Thomas Stewart, Fortune, January 11, 1999, p. 168-170. Developed by Jim Grayson, Ph.D. Process Variability Concepts

Statistical Process Control Capability Analysis Conformance Analysis Eliminate Assignable Cause Investigate for Assignable Cause Capability analysis What is the currently "inherent" capability of my process when it is "in control"? Conformance analysis SPC charts identify when control has likely been lost and assignable cause variation has occurred Investigate for assignable cause Find “Root Cause(s)” of Potential Loss of Statistical Control Eliminate or replicate assignable cause Need Corrective Action To Move Forward

What are the control limits for this process? Exercise An automatic filling machine is used to fill 16 ounce cans of a certain product. Samples of size 5 are taken from the assembly line each hour and measured. The results of the first 25 subgroups are that X-double bar = 16.113 and R-bar = 0.330. What are the control limits for this process? Source: Shirland, Statistical Quality Control, problem 5.2. If the specification limits are USL = 16.539 and LSL = 15.829 is the process capable? Developed by Jim Grayson, Ph.D.

Quality Lecture: Tools of Quality 2/4/2013 Process capability EXCEL: =NORMDIST(x, mean, std dev,1) to calculate percent non-conforming material. Process Analysis

The Statistical Meaning of Six Sigma Quality Lecture: Tools of Quality The Statistical Meaning of Six Sigma 2/4/2013 Process capability measure Lower Specification Limit (LSL) Upper Specification Limit (USL) Process A (with st. dev sA) x Cp P{defect} ppm 1 0.33 0.317 317,000 2 0.67 0.0455 45,500 3 1.00 0.0027 2,700 4 1.33 0.0001 63 5 1.67 0.0000006 0,6 6 2.00 2x10-9 0,00 X-3sA X-2sA X-1sA X X+1sA X+2s X+3sA 3 Process B (with st. dev sB) X-6sB X X+6sB Estimate standard deviation: Look at standard deviation relative to specification limits Don’t confuse control limits with specification limits: a process can be out of control, yet be incapable s ˆ = R / d 2 Process Analysis