Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: 2018-2020 Launch Options Favouring Data.

Slides:



Advertisements
Similar presentations
The ballistic support of the “SPECTR-RG” spacecraft flight to the L2 point of the Sun-Earth system I.S. Ilin, G.S. Zaslavskiy, S.M. Lavrenov, V.V. Sazonov,
Advertisements

Astronomical Events 2004 SHAHRIN HAJI AHMAD
Example of reoffending measure with a rolling 12 month cohort.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
An insertion burn at local noon has the advantage that the spacecraft is kicked into a 11 resonant orbit, with an inexpensive recovery manoeuvre, if the.
1 Interstellar Heliopause Probe M. Leipold, Kayser-Threde GmbHISSS 2010, New York, July 19 – 22, 2010 Interstellar Heliopause Probe (IHP) System Design.
1 Winter Launch Block Modeling and Results MMS Flight Dynamics Team MIWG 8 Feb. 20, 2014.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
Prepared by: MORE Team MORE Relativity Meeting February 16-17, 2009 Rome Simulation of the solar conjunction experiment with BepiColombo.
HOW TO MAKE A CLIMATE GRAPH CLIMATE GRAPHING ASSIGNMENT PT.2.
Lunar CRater Observation and Sensing Satellite Project LCROSS Site Selection Workshop Oct , 2006 NASA/ARC, Mountain View, California LCROSS Orbital.
June 2014 Performance Report RM Education Stoke BSF and Stoke CIS.
Mark Beckman - Flight DynamicsMB-1 Lunar Flight Dynamics Mark Beckman July 12, 2012.
WOTD:Solstice: when the tilt of the Earth's axis is pointing toward or away from the Sun Equinox: When the earth is not tilted toward or away from the.
Seasons What do your students think causes the seasons? By the Lunar and Planetary Institute For use in teacher workshops.
Venus Observations HST Program Objectives v Explain Venus observing strategy. v Review areas of special concern with Venus observations and explain.
Look Through the PowerPoint Slides and Answer the Questions on Outcome Related Activity #3 April 3 rd, 2014.
rd Global Trajectory Optimisation Competition Workshop Aula Magna del Lingotto, Turin (Italy), June 27, 2008 © 2008 DEIMOS Space, S.L. –
TUCKER FOOTBALL 2012 recruiting ACADEMICS. INTRODUCTION.
TUCKER FOOTBALL 2014 recruiting ACADEMICS. INTRODUCTION.
Propagation Trends Dayton 2014 Solar Maximum! But the slow decline to solar minimum in 2020 is likely to begin later this year.
FAST LOW THRUST TRAJECTORIES FOR THE EXPLORATION OF THE SOLAR SYSTEM
Date processing and conversion Please use speaker notes for additional information!
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
Public Health Lessons from HACCP-Based Inspection Models Project Presentation by Loren D. Lange August 7, 2007 United States Department of Agriculture.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
LISA News from ESA O. Jennrich LISA Project Scientist.
Van Allen Extended Mission Orbit Analysis 9/2014 SWG T. Sotirelis, F. Siddique JHU/APL.
S. Frey, UCB, THEMIS 1 25th ISSFD, Munich, Germany, Oct.19-23, 2015 ARTEMIS THEMIS ARTEMIS The Revised Concept of the THEMIS and MMS Coordination Sabine.
Introduction GOES-R ABI will be the first GOES imaging instrument providing observations in both the visible and the near infrared spectral bands. Therefore.
Mission Development: Putting It All Together ASEN 6008 Interplanetary Mission Design.
THM-MMS coordination 1 Summary of options from Feb 25, 2014 telecon ARTEMIS THEMIS ARTEMIS THEMIS THM-MMS coordination options: summary of Feb 25, 2014.
Cassini Tour Selection Dr. Kevin R. Grazier IS/SPE With Significant Viewgraph Assistance By: Linda Spilker Cassini Deputy Project Scientist July 26, 2005.
W.O.T.D: Eclipse: The partial or complete obscuring of one celestial body by another; to darken LT: I can explain what causes tides. I can explain the.
15 th CAA Cross-Calibration Workshop, 17th – 19th April 2012, UCL, London PEACE OPS TEAM Presented by Natasha Doss UCL Department of Space and Climate.
14 th CAA Cross-Calibration Workshop, 5th – 7th October 2011, York, UK PEACE OPS TEAM Presented by Natasha Doss UCL Department of Space and Climate Physics.
1 Target Introduction Chris Densham STFC/RAL Mu2e Target, Remote Handling, and Heat & Radiation Shield Review Nov
Lunar CRater Observation and Sensing Satellite Project LCROSS Astronomer Workshop Feb. 29, 2008 NASA/ARC, Mountain View, California Mission Design & Observation.
Guidance on the new Pathway IT System for Candidates
New Horizons launches Neptune orbit crossing
Jan 2016 Solar Lunar Data.
Pre-landing Orbiter Observations
Timeline Roadmap Template
Guidance on the new Pathway IT System for Mentors
PART I Give yourself MORE CASH! PART 1 CASH Bonus Incentive JUNE 1-30 Consultants Managers and above PART 1.
Updates to the Pathway to Chartership Online System
Guidance on the new Pathway IT System for Mentors
Baltimore.
Analyzing patterns in the phenomena
Updates to the Pathway to Chartership Online System
13-block rotation schedule
COLLEGE ADMISSION TESTING…
Dynamics and Control Attitude dynamics Communications Pointing
2018/2019 School Calendar July August September October November
Due Dates subject to change. Watch for dashboard updates.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Guidance on the new Pathway IT System for Mentors
Exit Capacity Substitution and Revision
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Broward Quality Performance Review
A Climate Study of Daily Temperature Change From the Previous Day
Agricultural Marketing
The Transformation of A Small Company Into A Golden Legend
February 2007 Note: Source:.
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Titan Flyby Altitude – Tour Updates Upcoming Observations in 2006
PLAYMATES LEARNING CENTER CALENDAR
TEL031 ODL Analytics Main Activities
2015 January February March April May June July August September
Presentation transcript:

Issue/Revision: 1.0 Reference: Status: For information Only ESA UNCLASSIFIED - For Official Use Solar Orbiter: Launch Options Favouring Data Return J.M. Sánchez Pérez, ESA-ESOC, HSO-GFA ESTEC

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 2 ESA UNCLASSIFIED - For Official Use Introduction 1.Period from September 2018 to December 2020 has been analysed in order to identify launch options for Solar Orbiter considering the maximisation of the data return as a major figure of merit 2.Task is now complete A number of possible candidates were analysed A set of trajectories has been identified from October 2018 until June 2020 offering better data return than the current CReMA baseline Potential downlink improvement from 15% to about 100% possible Some launch options provide as well an earlier start of science

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 3 ESA UNCLASSIFIED - For Official Use On the data return – Downlink index

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 4 ESA UNCLASSIFIED - For Official Use On the data return – Downlink index 2018 October CReMA “Bad” 4:3 Science orbit DL index = /AU October A1 “Good” 4:3 Science orbit DL index = /AU 2 Downlink driven by phasing of the Earth-Sun-Venus GAM geometry ESV angle = 69° ESV angle = -21°

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 5 ESA UNCLASSIFIED - For Official Use Comprehensive launch options search (1) 1.Assumptions and constraints: Trajectory problem tackled from launch to final 3:2 science orbit E(E)VEV, E(E)VVEV and E(E)VEEV transfer options Launch from Oct 2018 to Dec 2020 with Earth escape V ∞ <= 5.6 km/s Up to 3 full revolutions in each transfer leg, 5 during Venus resonances 0.27 AU <= Distance to Sun <= 1.57 AU Final science orbit in 3:2 resonance with solar inclination deg Total mission duration <= 10.7 years Average data return during science phase >= 2.0 Tbit/year Avoid critical superior conjunctions at GAMs (14 out of the last 20 days before a GAM with SES < 3 deg) Safe mode blackout periods <= 85 days 2.Over 400 solutions have been found and were further analysed Many solutions still non compliant with spacecraft constraints (eclipse duration, Max Sun distance, Safe mode blackout) and/or operational constraints (solar conjunction at GAM)

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 6 ESA UNCLASSIFIED - For Official Use Comprehensive launch options search (2) Cruise duration: from launch until last GAM before perihelion < 0.35 AU

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 7 ESA UNCLASSIFIED - For Official Use Comprehensive launch options search (3) Solutions cluster around same arrival dates Venus can be reached only at given solar longitudes No good solutions from Jul 2020 to Dec 2020! Empty

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 8 ESA UNCLASSIFIED - For Official Use Comprehensive launch options search (4) More strict Sun distance constraint and cruise duration 2 solution clusters: Oct 2018 and Jan-Jun 2020 Only 2 not promising solutions left in 2019

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 9 ESA UNCLASSIFIED - For Official Use Comprehensive launch options search (5) Longer mission not necessarily higher data return Earth-Venus phasing is critical Short cruise achieved with low or high max. Sun range only Empty

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 10 ESA UNCLASSIFIED - For Official Use Trajectories identified 1.Late October CReMA: issue with poor downlink 2018 October A1* & D: similar cruise as CReMA and different science phase improving downlink. D has the best downlink 2018 October E: different cruise (EVVEV) & early science start, good DL 2018 November*: fast EVEV cruise, average downlink / 2020 February Options A* and C: short EVEV cruise, average downlink Option B: very short EVVEV cruise, excellent downlink, marginal LW April: longer cruise, average downlink / 2020 June Option A*: short EVEV cruise, average DL, maximum Sun range ~1.5 AU Option B: similar to A, but compliant with Rsun <= 1.48 AU * Trajetories proposed by Dr. Langevin

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 11 ESA UNCLASSIFIED - For Official Use Downlink Classification DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 12 ESA UNCLASSIFIED - For Official Use Downlink – “Best case” DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA st 5:4 core science orbit DL index = 2.43 AU -2 2 nd 4:3 science orbit DL index = 1.89 AU -2

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 13 ESA UNCLASSIFIED - For Official Use 5:4 orbit 4:3 orbit Downlink – “Best case” 1 st 5:4 core science orbit DL index = 2.43 AU -2 2 nd 4:3 science orbit DL index = 1.89 AU

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 14 ESA UNCLASSIFIED - For Official Use Downlink – Excellent science orbits DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 15 ESA UNCLASSIFIED - For Official Use Perihelion Radius (AU)Solar inclination (deg) Evolution of parameters – Late Nov starts science almost as fast as 2018 Oct E and much higher inclination during NMP. However: < 0.3 AU only at EMP, limited final inclination and average downlink Trajectories with better downlink have delayed raise of the inclination

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 16 ESA UNCLASSIFIED - For Official Use Evolution of parameters &2020 Perihelion Radius (AU)Solar inclination (deg) Also fast mission with excellent downlink 2020 Feb B lags behind in inclination 2020 Feb A and Jun A start science later at higher inclinations always > 20 deg with average downlink, better than 2018 Oct CReMA, but worse than 2017 Jan or Jul Other options are intermediate in terms of evolution of orbit parameters

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 17 ESA UNCLASSIFIED - For Official Use Trajectories identified 1.Late October CReMA: issue with poor downlink 2018 October A1 & D: similar cruise as CReMA and different science phase improving downlink. D has the best downlink 2018 October E: different cruise (EVVEV) & early science start, good DL 2018 November: fast EVEV cruise, average downlink / 2020 February Options A and C: short EVEV cruise, average downlink Option B: very short EVVEV cruise, excellent downlink, marginal LW April: longer cruise, average downlink and science / 2020 June Option A: short EVEV cruise, average DL, maximum Sun distance ~1.5 AU Option B: similar to A, but compliant with Rsun <= 1.48 AU Most promising for late 2018

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 18 ESA UNCLASSIFIED - For Official Use 2018 Oct Option D Science phase: 5:4-4:3-3:2-3:2 (inbound) Cruise: 3.1 years 1 perihelion at 0.31 AU in E2-V2 leg 9.4 years to i s >30° Core science orbit: 5:4 reached after 3.8 years Inclination is low 12.7°, then raises fast Superb data return – DL index 2.43 AU -2 Excellent data return – DL index 1.89 AU -2 Maximum Sun range: AU Launch window 30 days both Atlas V & A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 19 ESA UNCLASSIFIED - For Official Use 2018 Oct Option E Very fast cruise: 2.3 years – Type EVVEV 2 perihelions at AU in E1-V3 leg 7.5 years to i s >30°, max. i s after 9.3 years Core science orbit: 4:3 reached after 3.15 years Inclination is low 13.1°, then raises fast Superb data return – DL index 2.09 AU -2 Very good data return – DL index 1.55 AU -2 Max. Sun range: AU – No hibernation Launch window 30 days Atlas V, 20 d A5ECA Science phase: 4:3-3:2-3:2-5:3-3:2 (outbound)

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 20 ESA UNCLASSIFIED - For Official Use 2018 Oct E vs Oct D Perihelion Radius (AU)Solar inclination (deg) Evolution of parameters 2018 Oct. D vs. E 2018 Oct E starts science earlier, goes faster <0.3 AU 2018 Oct E has more science orbits even if last 3:2 is ommited: 20 or 17 vs. 16 Inclination steps are similar, but 2018 Oct E is earlier 2018 Oct D has better downlink and more stable perihelion radius

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 21 ESA UNCLASSIFIED - For Official Use Summary – Science Performance Case CReMA Limits 2018 Oct CReMA 2018 Oct A Oct D 2018 Oct E 2018 Nov 2019 April 2020 Feb A 2020 Feb B 2020 Feb C 2020 Jun A 2020 Jun B +1 year if launched in 2019 Total Duration (y) 8.87 – Cruise duration (y) 2.94 – st perih. < 0.3 AU (y) 3.50 – Time to is 30 deg (y) Time to max. solar i (y) 7.86 – NMP+EMP duration (y)

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 22 ESA UNCLASSIFIED - For Official Use Summary – Science Performance Case CReMA Limits 2018 Oct CReMA 2018 Oct A Oct D 2018 Oct E 2018 Nov 2019 April 2020 Feb A 2020 Feb B 2020 Feb C 2020 Jun A 2020 Jun B Min Sun distance (AU) ≥ # Perih < 0.3 AU 7 – Time spent < 0.3 AU (d) 46.5 – # Below 0.4 AU 12 – Time spent < 0.4 AU (d) – Max. solar i (deg) (31.3) (30.2) Max. angular rate (deg/d) 7.76 – |Heliolatitude|>25 deg (8) (3)6(3) 8 9 Heliolatitude>+25 deg (d) (137) (90) Heliolatitude<-25 deg (d) (187) (57) |Heliolat.|>25 deg (d) (323) (147)

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 23 ESA UNCLASSIFIED - For Official Use Summary - Constraints Case CReMA Limits 2018 Oct CReMA 2018 Oct A Oct D 2018 Oct E 2018 Nov 2019 April 2020 Feb A 2020 Feb B 2020 Feb C 2020 Jun A 2020 Jun B LW Atlas V 411 (d) LW Ariane 5 ECA (d) (only 2019) ~26 (only 2019) 30 (only 2019) 30 Max Sun distance (AU) – SM Blackouts*: longest (d) ≤ Conjunctions*: longest (d) ≤ Longest eclipse - LW (min) ≤ Longest occultation (min) ≤ SES angle at Venus (deg) Feb B marginal launch window with Atlas V Nov and 2020 June A marginally above max. Sun distance constraint All other constraints are respected, including OPS constraint to avoid Solar superior conjunction at Venus GAM

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 24 ESA UNCLASSIFIED - For Official Use Conclusions 3 launch options allow fast start of science and excellent downlink improving performance of current CReMA’s best (2017 July) Generally very high downlink leads to lower inclinations at start of NMP and a delay in the inclination raise Selection process for new baseline in late 2018 – Most promising: October D favouring downlink October E favouring fast start of and more science Additional trajectories compliant with all mission constraints provide better downlink than CReMA 2018 Oct and give flexibility to launch in different periods from 2019 Feb to 2020 June Backup launch options are ensured until 2020 June allowing to accommodate different launch delays Selection not considered critical at this point

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 25 ESA UNCLASSIFIED - For Official Use SPARE SLIDES

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 26 ESA UNCLASSIFIED - For Official Use 2018 Oct CReMA Science phase: 1:1-1:1-4:3-3:2-3:2 (inbound) Cruise: 3.2 years 1 perihelion at AU in E2-V2 leg 8.2 years to i s >30° Core science orbit: 4:3 reached after 5.1 years Inclination 21.7° Poor data return – DL index 0.73 AU -2 Overall poor data return – DL index 1.09 AU -2 Maximum Sun range: AU Launch window 30 days both Atlas V & A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 27 ESA UNCLASSIFIED - For Official Use 2018 Oct Option A1 Science phase: 1:1-4:3-4:3-3:2-5:3 (inbound) Cruise: 3.1 years 1 perihelion at 0.31 AU in E2-V2 leg 8.1 years to i s >30° Core science orbit: 4:3 reached after 4.4 years Inclination is lower 16.9° Good data return – DL index 1.60 AU -2 Good overall data return – DL index 1.42 AU -2 Poor data return during EMP Maximum Sun range: AU Launch window 30 days both Atlas V & A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 28 ESA UNCLASSIFIED - For Official Use 2018 November Science phase: 4:3-3:2-5:3-5:3* (inbound) Very fast cruise: 2.7 years 7.7 years to i s >30° However, not possible to reach i s >31° Core science orbit: 4:3 reached after 2.7 years Inclination is 19.1° Average data return – DL index 0.90 AU -2 Average data return – DL index 1.26 AU -2 Max. Sun range: AU – Above constraint Launch window 30 days both Atlas V & A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 29 ESA UNCLASSIFIED - For Official Use 2019 April Science phase: 4:3-3:2-3:2-5:3 (outbound) Cruise is long: 3.9 years 7.0 years to i s >30° Core science orbit: 4:3 reached after 3.9 years Inclination is 16.0° Poor data return – DL index 0.72 AU -2 Average total data return – DL index 1.28 AU -2 Max. Sun range: 1.13 AU – No hibernation Launch window 30 days Atlas V & 24 d A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 30 ESA UNCLASSIFIED - For Official Use 2019/2020 February A Science phase: 4:3-3:2-5:3-5:3* (outbound) Cruise: 3.1 years (4.1 years in 2019) 6.2 years to i s >30° (7.2 years in 2019) Core science orbit: 4:3 reached after 3.1 years (4.1 years) Inclination is high 21.9° Poor data return – DL index 0.81 AU -2 Average total data return – DL index 1.23 AU -2 Max. Sun range: 1.11 AU – No hibernation Launch window: 2019 Atlas V & A5ECA both 30 days 2020 Atlas V 29 days

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 31 ESA UNCLASSIFIED - For Official Use 2019/2020 June A Science phase: 4:3-3:2-5:3-5:3* (inbound) Cruise: 2.7 years (3. 7 years in 2019) 5.8 years to i s >30° (6.8 years in 2019) 7.6 years to i s >32° (6.8 years in 2019) Core science orbit: 4:3 reached after 2.7 years (3.7 years) Inclination is 20.3° Average data return – DL index 0.92 AU -2 Average total data return – DL index 1.26 AU -2 Max. Sun range: AU – Above constraint Launch window Atlas V & A5ECA both 30 days

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 32 ESA UNCLASSIFIED - For Official Use 2019/2020 June B Science phase: 4:3-3:2-3:2-3:2-3:2 (inbound) Cruise: 2.7 years (3. 7 years in 2019) 7.0 years to i s >30° (8.0 years in 2019) 8.2 years to i s >31.5° (9.2 years in 2019) Core science orbit: 4:3 reached after 2.7 years (3.7 years) Inclination is only 12.1° Poor data return – DL index 0.84 AU -2 Average total data return – DL index 1.24 AU -2 Max. Sun range: AU Launch window Atlas V & A5ECA both 30 days

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 33 ESA UNCLASSIFIED - For Official Use 2019/2020 February B Science phase: 5:4-4:3-3:2-5:3 (inbound) Very fast cruise: 1.8 years – Type EVVEV (2.8 years in 2019) 1 perihelion at AU in E1-V3 leg 8.1 years to i s >30° (9.1 years in 2019) 9.3 years for i s >33° (not in 2019) Core science orbit: 5:4 reached after 2.6 years (3.6 years) Inclination is very low 8.7° Superb data return – DL index 2.42 AU -2 Excellent total data return – DL index 1.72 AU -2 Max. Sun range: 1.02 AU – No hibernation Launch window marginal: only 17 days 2020 Atlas V only, 2019 Atlas V & A5ECA

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 34 ESA UNCLASSIFIED - For Official Use 2019/2020 February C Variant of Feb A with 5:4 instead 1:1-4:3 Science phase: 5:4-4:3-3:2-5:3 (outbound) Cruise: 2.5 years (3.5 years in 2019) 8.0 years to i s >30° (9.0 years in 2019) Core science orbit: 5:4 reached after 2.5 years (3.5 years) Inclination is low 13.9° Average data return – DL index 0.98 AU -2 Average total data return – DL index 1.35 AU -2 Max. Sun range: 1.11 AU – No hibernation Launch window: 2019 Atlas V & A5ECA both 30 days 2020 Atlas V 29 days

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 35 ESA UNCLASSIFIED - For Official Use Data Return – Good NMP case, but … DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA st 4:3 core science orbit DL index = 1.60 AU -2 2 nd 4:3 science orbit DL index = 1.91 AU -2

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 36 ESA UNCLASSIFIED - For Official Use Data Return – … bad EMP DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA st 3:2 science orbit DL index = 0.92 AU -2 2 nd 3:2 science orbit DL index = 1.08 AU -2

J.M. Sánchez Pérez | ESOC | 18/06/2015 | Slide 37 ESA UNCLASSIFIED - For Official Use Data Return – Good EMP DL index (AU -2 ) Core 4:3 or 5:4 orbit NMPEMP Total science 2018 Oct D Feb B Oct E Jul Oct A Jan Feb C April Nov Jun A Jun B Feb A Oct CReMA :2 science orbit DL index = 1.79 AU -2 5:3 science orbit DL index = 1.05 AU -2 Additional 3:2 science orbit DL index = 1.56 AU -2