July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

ILC Damping Ring R&D Using CESR Mark Palmer Cornell Laboratory for Accelerator-Based Science and Education.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
CesrTA Electron Cloud R&D Overview Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Emittance Measurement Needs for CesrTF M. Palmer Cornell University Laboratory for Elementary-Particle Physics.
CesrTA EC Build-Up and Mitigation Program - Introduction Mark Palmer June 25, 2009.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
October 13,2010 WG Meeting Cornell U. Recommendation for Electron Cloud Mitigations in the ILC Damping Ring ILC DR Working Group October 13, 2010 Cornell.
Electron Cloud Mitigation Studies at CesrTA Joseph Calvey 10/1/2009.
ILC DR Workshop - KEK December, A new resonance in wiggler simulations: Christine Celata Use POSINST code.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
GDE, 26 Oct 2007, FNAL Global Design Effort 1 Damping Rings Area System Summary Andy Wolski.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
CesrTA Vacuum System Conversion and Operational Experiences Yulin Li for the CesrTA Team Cornell Laboratory for Accelerator-based ScienceS and Education.
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
01/08/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
ILC Damping Ring Test Facilities Status Report Mark Palmer Cornell University May 9, 2009 ILC PAC Review, Vancouver.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Electron Cloud in the International Linear Collider ILC Mauro Pivi work performed while at SLAC and the ILC Damping Ring Working Group High.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Mark Palmer for the CESRTA Collaboration
Electron Cloud and Ion Experimental Program
Electron Cloud R&D at Cornell ILCDR08--7/8/08
CesrTA Status Report Mark Palmer July 8, 2009.
Oversea collaborators
CesrTA Status and Planning
RECENT DEVELOPMENTS IN MODELING
Why Study Electron Clouds? Methods and Tools to Study Electron Clouds
J.A.Crittenden, Y.Li, X.Liu, M.A.Palmer, J.P.Sikora (Cornell)
Recent Electron Cloud Studies at CESR and Future Plans
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
CTA 09 - Introduction David Rubin Cornell Laboratory for
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Proposal for a CESR Damping Ring Test Facility
Presentation transcript:

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and 4 (1) PeriodDateDurationTasks and Milestones Down 14/1/0815 days1) Install instrumented copper wiggler chambers a.One with diagnostics (control) b.One with diagnostics and TiN coating* CesrTA Run 16/3/0828 days1) Beam tests of wiggler chambers at GeV 2) Low emittance operation and alignment studies in CESR-c configuration Down 27/1/0892 days1) Reconfigure CESR for low emittance a.Wiggler moves (from arcs to L0) b.Vertical separator removal (L3) 2) Instrumented vacuum chambers (RFAs) a.Wiggler chambers with additional EC mitigation techniques* (L0 installation) and adjacent drift chambers b.Dipole and drift chambers in arcs (regions where wigglers removed). At least one dipole control and one coated chamber (likely NEG)* c.Drift chambers in L3 3) Optics line for X-ray beam size monitor (positrons) 4) Deploy upgraded BPM system around ~25% of ring (half of vertical quadrupole locations) 5) Upgraded leveling and adjustment system on quadrupole stands

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 2 Answer to Questions 1 and 4 (2) PeriodNominal Start Date Nominal Duration Tasks and Milestones CesrTA Run 211/18/0842 days1) Tests of EC growth in vacuum chambers at GeV. Characterize growth as a function of bunch spacing, intensity, train configuration, emittance. 2) Continue beam-based and instrumental alignment program to achieve ultra low emittance 3) Experiments at low emittance to explore instability thresholds and emittance dilution due to the ECI and FII 4) Begin commissioning of positron X-ray BSM Down 31/6/0943 days1) Install photon stop for 5 GeV wiggler operation in L0 2) Complete a large fraction of alignment/survey upgrade 3) Install 2 additional instrumented dipole chambers with EC mitigation* 4) Install 3 instrumented quad chambers (L3) with EC mitigation* 5) Install upgraded BPM readout at remainder of vertically focusing quadrupole locations 6) Install solenoid windings in drift regions * Mitigation techniques planning still underway with ILC DR group

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 3 Answer to Questions 1 and 4 (3) PeriodNominal Date Nominal Duration Tasks and Milestones CesrTA Run 34/7/0942 days1) Complete commissioning of positron X-ray BSM 2) EC growth measurements in chambers in 2-5 GeV range 3) Continued work to achieve ultra low emittance 4) Instability and emittance dilution experiments Down 47/7/0949 days1) Install optics line for electron X-ray beam size monitor 2) Complete longitudinal feedback upgrade 3) Installation of additional vacuum chambers with EC diagnostics and mitigation as determined by results of CesrTA runs 1-3 CesrTA Run 48/25/0942 days1) Complete evaluation of electron cloud growth in wiggler, dipole and quadrupole chambers. Compare with simulation and prepare evaluations for ILC EDR 2) Continue program to achieve ultra low emittance 3) Detailed experiments at the lowest achieved emittance to characterize EC and FII instability thresholds and emittance dilution

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 4 Answer to Questions 1 and 4 (4) PeriodNominal Date Nominal Duration Tasks and Milestones CesrTA Run 511/24/0949 days1) Continue program to achieve ultra low emittance 2) Experiments to characterize instability thresholds and emittance dilution and prepare evaluations for the ILC EDR 3) Start commissioning of electron x-ray beam size monitor Down 51/18/1051 days1) Install BPM upgrade at all horizontally focusing quads 2) Install additional vacuum chambers with EC diagnostics and mitigation as determined by results of CesrTA and other ILC experimental programs CesrTA Run 65/4/1042 days1) Complete program to achieve ultra low emittance 2) Characterize electron and positron instability thresholds and emittance-diluting effects in the 5-10 pm vertical emittance regime for electrons and positrons Down 66/15/1015 days1) Install wiggler with ILC prototype vacuum chamber CesrTA Run 78/17/1042 days1) Experimental studies at ultra low emittance (ECI, FII, IBS,…) 2) Test ILC prototype wiggler vacuum chamber (2-5 GeV)

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 5 Answer to Questions 1 and 4 (5) PeriodNominal Date Nominal Duration Tasks and Milestones Down 79/28/1015 daysFlexible down for hardware work CesrTA Run 811/30/1049 daysContinue studies begun in Run 7 Down 81/18/1149 days1) CesrTA available for installation and testing of ILC prototypes 2) Ongoing experimental program at ultralow emittance 3) Explore unexpected discoveries from program CesrTA Run 94/26/1142 days Down 106/7/1115 days CesrTA Run 108/9/1142 days

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 6 Question 2 What is the risk that critical results are delayed until after the deadline for input into the EDR? –Measurement of emittance dilution due to electron cloud depends on achieving low emittance. There is a risk that because critical instrumentation is not available at the start (upgraded BPM system and xray beam size monitor) that we will be unable to reach target emittance on a useful time scale. –Demonstrating e cloud mitigation depends on the development and construction of an effective design There is a risk that none of the concepts now under consideration will work and that clever ideas will be in short supply.

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 7 Question 3 Is this program viable if CHESS is not funded and if it is not, what remedies are required. If CHESS is not funded, the viability of the CesrTA program can be maintained if such information is available in a timely manner and only with significant additional resources to provide: –the remainder of the full yearly operating budget –the services of an X-ray optics expert and technical support to replace the lost CHESS resources for the precision X-ray beam size monitor. in addition, if the availability of the additional operations time is to be exploited to advance the CesrTA schedule: –capital funds to move forward the implementation of instrumentation –support of 3-4 additional technical support staff (including 1 engineering level person) to implement the instrumentation or –equivalent collaborator participation

What are the plans for finding additional global collaborators, both for resources and techniques? Guidance for the structure and goals of the ILC collaboration is provided by the GDE. The current ILC-GDE Damping Rings Area System leaders have identified institutions interested in ILC damping ring R&D activities which can form the basis of future collaborations. In the electron cloud research area, in addition to Cornell, the institutions include Alfred U., ANL, AsTEC, CERN, DESY, Fermilab, INFN, KEK, LANL, LBNL, Liverpool/CI, Minnesota, Rostock, and SLAC. Many of these are already involved with Cesr-TA, and we will involve additional institutions as the program develops. During the EDR phase, ILC-GDE project management will coordinate ILC damping ring work. Plans for the EDR phase are currently being developed. We will work with GDE project management to bring new institutions into the global ILC collaboration, in order to provide additional resources and techniques in pursuit of the R&D objectives which are the focus of the CesrTA program. Question 5

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 9 Question 6 What resources, if available in FY08, would speed up answers to some of the critical questions? Advanced funds for capital equipment and for additional effort in FY08 to implement the following: –Full beam position monitor upgrade $350k F.T.E. (65% engineering&computer, 35% technician) –Full implementation of laser tracker, targets, magnet movers $267k F.T.E. surveyor/engineer –Advance installation of instrumented vacuum chambers $150k + 2 F.T.E. vacuum engineer/designers –X-ray beam beam size monitor $125k F.T.E. engineer/physicist –Longitudinal feedback upgrade $185k F.T.E. RF engineer If less additional effort is available, the program can still be advanced in FY08 with some delay.

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 10 Question 7 What are the consequences if the total funding goes up or down by 30%? (This is assumed to mean to apply only to the total integrated funding.) If the funding were to rise by 30% it could be used to reduce risk of insufficient information in time for the EDR one vs two ring decision by Speeding up –The provision of the BPM electronics –The construction of the x-ray beam size monitor beamline infrastructure –The delivery of the wiggler and dipole chambers with the several mitigation approaches built in –Providing more of the instrumented dipole and quadrupole chambers for sampling the various environments in the ring.

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 11 Question 7 If the funding were to fall by 30%, it would result in shortening the program by one year, thereby –eliminating the possibility of testing ILC DR chamber designs in CesrTA –increasing the technical risk that unexpected discoveries of a nature detrimental to potential damping ring performance could not be followed up and mitigated.

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 12 Question 8 Are the measured tuneshift and beam size adequate to fully understand EC behavior in the absence of detailed knowledge of the distribution around the ring? –No. KEK-B measures horizontal and vertical tune shifts that depend differently on the excitation of solenoids. CESR measures a vertical tune shift and no significant horizontal tune shift. This difference is presumably because the cloud distribution depends on details of the respective guide fields. Evidently details of the distribution matters. –We plan to instrument CESR so that we will be able to determine the distribution around the ring. Representative chambers of every type in CESR will be instrumented with RFAs including –drift, quadrupole, wiggler, and 3-4 types of dipole chambers Measurement of the cloud distribution in each of the representative chambers as a function of various beam parameters will allow a reconstruction of the distribution around the ring We will use simulations to complement the direct measurements and as a consistency check. Measurement of witness bunch tune shifts vs driving train current and witness bunch delay will provide an additional consistency check. Other methods to characterize cloud distribution

July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 13 Question 9 What are the three biggest technical risks? –Failure of all of the proposed E cloud mitigation techniques to be effective –Inability of the RFAs to measure electron cloud density and/or energy distribution, thereby making it impossible to determine the cloud distribution around the ring. –There is a risk that near term progress in low emittance tuning will be compromised by the limitations imposed by the analog BPM system and visible light beam size monitor. We may, for example find some unexpected instability of the guide field too late to understand and address.