Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?

Slides:



Advertisements
Similar presentations
The State of Brackish Groundwater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
Advertisements

Regional Water Planning Senate Bill 1 Introduction and Status as of August 01, 1999.
The Energy – Water Nexus : UT School of Law. Brackish vs Seawater.
Desalination in the Netherlands and Beyond Emily Tenenbaum January 27 th 2011.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Brackish Groundwater Desalination in Texas J. Kevin Ward.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
WATER for TEXAS Water for the Future Carlos Rubinstein, Chairman Bech Bruun, Director Kathleen Jackson, Director.
Water for Texas 2012 State Water Plan. Water Planning: Legislative Response to Drought  Late 1950s Drought of Record – 1957: Creation of TWDB – $200.
Water Marketing in Texas Ronald Kaiser, Texas A&M University May 4 th, 2001 Texas Rural Land Market Conference.
Exploring Regional Desalination as a Water Supply Option in the Bay Area The Who, What, When, Where, Why and How of Regional Water Supply Planning May.
Jorge A Arroyo P.E. (For Robert Mace) Texas Water Development Board Presenting to Texas Water Conservation Association 66 th Annual Convention Dallas
Presented by: Kevin J. Spencer, P.G. R.W. Harden and Associates, Inc. Benefits and Challenges of Developing Brackish Groundwater Supplies WATER Supply.
Water Resource Division San Joaquin County Water Resource Management Planning Update C. Mel Lytle, Ph.D. Water Resource Coordinator San Joaquin County.
MSSC 2011 Annual Salinity Summit Charles Ahrens Vice President / Water Resources and Conservation Challenges in Brackish Groundwater Desalination Project.
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
2 1)Familiarize State agency staff with Water Plan Update 2013 information, tools and resources 2)Identify opportunities for State agencies to derive.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Water for Texas: Do We Have Enough? Dr. Dan Hardin Director, Water Resource Planning Texas Water Development Board.
BAWSCA’s Strategy In 2009, BAWSCA embarked on the Long- Term Reliable Water Supply Strategy to: o Determine the Water Supply Problem When, where, and how.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
1 California Water Plan Update 2009 Resource Management Strategies Overview 1 st Plenary Meeting Sacramento October 23, 2007.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
New Mexico Forum on Reclaiming Produced/Brackish Water for Beneficial Use RO Desalination Activity in Texas: Priority Programs Sourcing, Pre-Treatment,
Water for Monterey County Regional Project Capital and O&M Cost Description 1 Lyndel Melton, P.E. RMC Water and Environment.
Brackish Groundwater Desalination March 21, 2014 Robert Puente President/Chief Executive Officer 2014 Texas Environmental Law Journal Symposium on The.
The State of Seawater Desalination in Texas Jorge A. Arroyo P.E. Innovative Water Technologies.
What are the data gaps for developing brackish groundwater desalination resources in Texas? Bill Hutchison, Ph.D., P.E., P.G. Director, Groundwater Resources.
San Diego County Water Issues 2010 Update Maritime Business and Technology Summit November 16, 2010 Seawater Desalination for San Diego.
City of Fort Collins Wind Power Program March 24, 2004 John Phelan, PE Energy Services Engineer.
Governor’s Strategic Growth Plan Flood Protection and Clean, Safe, Reliable Water Supply Bond and Financing Acts of 2006 and 2010 Southern California Water.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
SAWS' Twin Oaks Aquifer Storage and Recovery Project SAWS' Twin Oaks Aquifer Storage and Recovery Project October Texas Innovative Water 2010 Roberto.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
City of Savannah Water, the Lifeblood of a Community.
FLOWS FOR THE FUTURE 2005 Environmental Flows Conference Texas State University – San Marcos November 1, 2005 Bob Brandes Region M Water Planning Study.
Los Angeles Department of Water and Power Seawater Desalination Update by: Alvin Bautista, P.E. October 2007.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
2011 ANNUAL SALINITY SUMMIT J. Tom Ray, P.E, D-WRE Water Resources Program Manager Lockwood, Andrews & Newnam, Inc.
Texas Water Development Board and the State Water Implementation Fund for Texas (SWIFT) Doug Shaw Agriculture and Rural Texas Ombudsman.
SantaBarbaraCA.gov/Water PUBLIC WORKS DEPARTMENT WATER RESOURCES DIVISION EMBEDDED ENERGY OF “NEW” WATER Joshua Haggmark, Water Resources Manager UCSB.
Integrated Watershed Planning In Texas An Evolving Process National Waterways Conference Charleston, West Virginia September 25, 2009 Bill Mullican, P.G.,
Potable Reuse: A New Water Resource for the Central Coast Water Breakout Session – 2015 Central Coast Sustainability Summit James Hawkins, Heal the Ocean.
Status update presentation #1 for the Cayucos Sustainable Water Project Status update presentation #1 for the Cayucos Sustainable Water Project November.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Natural Disaster Management Group Drinking Water Advisory Group July 21, 2015 Alexander Hinz Wendi Wilkes Water Supply Division Texas Commission on Environmental.
Sonoma Valley Groundwater Management Planning. 2 Presentation Overview SCWA/USGS Groundwater Study Stakeholder Assessment Groundwater Management Work.
MSSC 2011 Annual Salinity Summit February 17 – 18, 2011 Thirty Years of Success in Implementing Desalination By Roger K. Noack, P.E. HDR Engineering, Inc.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Potable Reuse in Texas: A Glimpse into the New Water Frontier Ellen McDonald, Ph.D., P.E. Alan Plummer Associates, Inc.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Please, Pass the Salt: Can the Oil Industry Benefit from Desalination Wastes? TIPRO Mid-Winter Policy Meeting Fort Worth, Texas January 13, 2004 Jean-Philippe.
AquaSel Brine Concentration Pilot Project Update
Water Resource Management Planning Update
2015 Urban Water Management Plan Overview
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Water Resources Plan 2040 Update
Allocation of Ogallala Groundwater Supplies
WATER for TEXAS Water for the Future
Sam Aminfard CATEE 2017 – Texas Energy Summit November 15, 2017
Capital Area Council of Governments
Elizabeth Waite GIS Water Resources 29 November 2012
Water Resource Management Planning Update
WSAC Decision Making Framework
Withlacoochee Regional Water Supply Authority
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
California Water Commission
Why Potable Reuse in Florida?
Presentation transcript:

Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?

A Historical Perspective of Texas Water

“Dependable supply from conventional sources such as lakes, rivers and wells is already 75 to 80 percent developed…” Texas Water Development Board, 2000 Source: TWDB, The Drought in Perspective: 1996 to 1998.

New Groundwater (7%) New Reservoirs (17%) Conjunctive Use (4%) Conservation (18%) Reuse (15%) Existing Surface Water (35%) 78% Sensitive to Drought Desalination (4%) Source: TWDB, Water for Texas 2007.

“It is not a matter of whether saltwater will one day be used as an abundant source for public use, but when. As people, we must have the courage to look into the future and invest today in a better tomorrow. There is no greater untapped source of water than the ocean water which Texas can easily access.” Governor Rick Perry, April 29, 2002

2002 Governor’s Seawater Desalination Initiative 2003 Legislative Directive 2004 TWDB Feasibility Studies - Three Sites 1.Brownsville 2.Corpus Christi 3.Freeport 2005 Legislative Appropriation for Seawater Pilot - Brownsville 2008 Seawater Pilot Completed 2009 Microfiltration Project – Arsenic and Iron Removal 2009 Texas Desal Project – Proactively Identify Environmental Concerns Statewide Interest and Commitment

Why Brownsville?

Reservoir Capacity

Region M Experience 2002 State Water Plan Cities in Region M with Desalination as a water supply strategy: 0

Region M Experience 2007 State Water Plan Cities in Region M with Desalination as a water supply strategy: 30+

Support for Seawater Desalination Diversification Innovation Commitment

Diversification Surface Water Brackish Groundwater Desalination Southmost Regional Water Authority Plant Seawater Desalination Pilot Plant Texas Desal Project – Proactively Identify Environmental Concerns Long-Term Water Supply Strategy

Innovation New Alternatives Exploration SRWA Desalination Plant TWDB Feasibility Study (1995) Technical/Financial Feasibility Study – 2000 Aquifer Testing – 2001 Groundbreaking for Facility Largest Facility in Texas (2004) Microfiltration Project (2009) – Arsenic and Iron Removal Seawater Pilot Plant (2008)

Commitment Leadership in Implementation SRWA – $30 million - 100% Local Funding Microfiltration Project - $13 million Seawater Pilot Project BPUB-$2.1 million – TWDB-$1 million Texas Desal Project – Proactively Identify Environmental Concerns

Summary SRWA – Brackish Groundwater Desalination Texas Desal Project Identify Environmental Impacts Seawater Desalination in Brownsville is Technically Feasible Pilot data sufficient to develop full-scale facility Phase approach will allow system performance evaluation prior to full-scale investment 2.5 mgd Demonstration Seawater Desalination/Research Facility Data will provide more efficient design and lower cost on future expansions Expand up to 25 mgd at the proposed location Further diversify regional water supply sources

Summary Research Facility for Desalination Technology Pretreatment Larger/more efficient membranes Seawater variations/Gulf Coast difficulties Renewable Energy Component Energy Recovery Sustainable Energy Supply Brownsville has a proven track record and has demonstrated commitment and ability to advance Seawater Desalination in Texas

“Seawater Desalination... holds the promise of providing unlimited supplies of drinking water even during periods of extreme drought. State investment in the Brownsville Seawater Desalination Demonstration Project represents a significant step in meeting the future water supply needs of the Lower Rio Grande Valley. It also represents even more significant progress towards meeting the future water supply needs of many regions in Texas.” Texas Water Development Board, 2006 Biennial Report on Desalination

What is the Benefit to the State from Implementing the Brownsville Seawater Demostration Project? Brownsville is a proven area with an abundant seawater source which will further diversify Texas’ water supply portfolio and provide an innovative Seawater-Research Facility that will serve as a pioneer for future cost effective Seawater Desalination along the Texas Coast.

Contact Information Genoveva G. Gomez, P.E. Brownsville Public Utilities Board Water & Wastewater Engineering & Operations Director 1425 Robinhood Drive P.O. Box 3270 Brownsville, TX (956)