IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.

Slides:



Advertisements
Similar presentations
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
Advertisements

CMS Outer Hadron Calorimeter (HO) Project Naba K Mondal Tata Institute, Mumbai, India.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
The Angra Neutrino Detector Detector, VETO and electronics conceptual design Laudo Barbosa (May 18th, 2006) Centro Brasileiro de Pesquisas Físicas (CBPF)
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
GLD Calorimeter Status Oct 学術創成会議 S. Uozumi Shinshu University FJPPL meeting held at the end of September. Preparation underway toward the ECAL.
Status of Atlas Tile Calorimeter and Study of Muon Interactions L. Price for TileCal community Short Overview of the TileCal Project mechanics instrumentation.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
Construct two layers of hadron calorimeter and test Makoto Harada High Energy Physics Laboratory Faculty of Physics Department of Science Shinshu University.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
Cost for Large Liquid Scintillator Detector Ken Heller University of Minnesota Active Detector – Liquid Scintillator Target Material - Water Read Out –
LHCC, V0, Sept The V0 detector (Mexico Lyon collaboration)  Segmentation  Simulated performances secondaries / beam-gas  Counters design 1 /
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Beam test results of Tile/fiber EM calorimeter and Simulator construction status 2005/03/05 Detector Niigata University ONO Hiroaki contents.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
Status of the NO ν A Near Detector Prototype Timothy Kutnink Iowa State University For the NOvA Collaboration.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Future Beam Test Plans of the GLD Calorimeter Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
R&D of MPPC for T2K experiment PD07 : Photosensor Workshop /6/28 (Thu) S.Gomi T.Nakaya M.Yokoyama H.Kawamuko ( Kyoto University ) T.Nakadaira.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK)
Scintillator ECAL for ILC for Calorimeter Review DESY May2007 Tohru Takeshita (CALICE-Shinshu) Idea implementation current status future mile stones.
1234 Dec Jan Feb 2007 Delivery of 500 MPPCs MPPC numbering Mass check MPPC soldering WLSF megastrip source scan ACFA Shipping Feb-14.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
SCECAL progress report Tohru Takeshita (Shinshu) _DESY Beam Test summary _improvements for FNAL BT _FNAL module _current status at Fermilab.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Systematics on ScECAL 1 st prototype DESY Apr , CALICE Satoru Uozumi for the CALICE collaboration NIM A, 763 (2014) 278.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
SiD Muon Detector Progress. Overall concept 2 There are slots in the iron. We will insert modules of orthogonal strips of appropriate size into the slots.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Paul Rubinov on behalf of Gene Fisk, Kurt Krempetz 22 Aug 2012.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
CDMS II Shielding To Installation To Construction From Design.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Upgrade of the MEG liquid xenon calorimeter with VUV-light sensitive large area SiPMs Kei Ieki for the MEG-II collaboration 1 II.
Status of HRS Detectors Barak Schmookler DVCS - 12/19/20131.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Development of Multi-pixel photon counters(2) M.Taguchi, T.Nakaya, M.Yokoyama, S.Gomi(kyoto) T.Nakadaira, K.Yoshimura(KEK) for KEKDTP photon sensor group.
Plan for the KEK beam test in November 2007 and Beyond Satoru Uozumi (Shinshu) Oct-1 Japan-Korea KNU.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
IFR Detector R&D status
Micromegas Vertex Tracker Status Report
J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting
IHEP group Shashlyk activity towards TDR
M. Jones B. Wojtsekhowski
Chris Smith California Institute of Technology EPS Conference 2003
LHCb HCAL: performance and calibration
MPPC for T2K Fine-Grained Detector
Nov. 10th, Meeting INGRID T. Nakaya (Kyoto)
Presentation transcript:

IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design  Scintillator Bar QA  DS-Ecal Construction  Outlook Construction of a Downstream Ecal for the T2K ND280 Detector

IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies 2 DS-Ecal Design  DS-Ecal is a tracking lead-plastic scintillator calorimeter  34 lead-scintillator layers, x-y orientation  2 lead pieces per layer: 2.0m x 1.0m x 1.75mm primed  50 scintillator bars per layer: 2.0m x 4cm x 1cm  1 module: ~ 2.5m x 2.5m x 0.5m  Active area: 2.0m x 2.0m  1700 WLS fibres coupled to MPPC double-ended readout ( see M.George poster for T2K overview )

IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies 3 Scintillator Bar QA Mechanical  50 scintillator bars per layer  200cm x 4cm x 1cm  Recording Pass/Fail of tolerances  Go, No-Go gauges - Pass/Fail  Cut to length, check flatness, squareness and hole position FNAL bar cross-section

 Cosmic Trigger, producing at least 450 triggers/hour  Three 4 x 6cm scintillator pads coupled to 2” PMTs  Coincidence area of 16cm 2  Triple coincidence window of 150ns IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies 4 Scintillator Bar QA Optical Example cosmic run with associated calibration ~32 p.e./MIP single p.e. C B A Signal PMT

IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies5  Baseline  Pass/Fail criterion  Measurements at 70cm from end of bar  Attenuation tests Scintillator Bar QA Optical 2σ2σ PASS region  First light attenuation tests of scintillator bar from DS-Ecal  Compared to the light- attenuation (average lengths) of the WLS fibres, as reported from measurements with the Warwick fibre scanner setup PRELIMINARY 12 bars sampled

 Layer-by-layer building  Build all layers first IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies6 Ecal Construction Layer Build IN PROGRESS!! First completed Layer Applying glue to sides of bars Lowering lead into position with vacuum-suction system First light through hole in scintillator bar in a layer

IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies7...2D scan of layer with 3mCi 137 Cs source....install WLS fibres and ferrules into the 50 scintillator bars. Clip 100 MPPCs (see M.Ward talk and M.Haigh poster), with electronics, to ferrules and connect to DAQ... First layer: Attach carbon panel, bulkheads, fit light injection system. Now place each layer into the module frame and attach the 2D scanner... Ecal Construction Module Build

IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies8 Ecal Construction Module Build...NOW DO THE SAME FOR 33 MORE LAYERS!  Assemble cooling plates and feed through 3400 MPPC cables  Install FEB electronics cards, cooling system and pressure test  Install voltage feeds and bus bar system  Fit signal feedthrough panel  Attach outer cover panels  Install services: dry N 2, water, etc Attach module support system

The finished DS-Ecal module... IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies9 Ecal Construction CERN

 Schedule  Finish layer building: mid-May,  started 27 th March. Completed 4 layers so far  Module build, incl. fibres installation and layer scans: June – mid-September  Cabling and services: mid-September – 1 st November  CERN test beam: Spring `09  First T2K beam at Tokai: April `09  Arrive Tokai: Autumn ’09 IoP HEPP Lancaster 31/03 – 02/04/08, Gavin Davies10 Outlook