Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing.

Slides:



Advertisements
Similar presentations
Internet Rechartering Update System Enhancements October 1, 2010.
Advertisements

Status of 8-Hour Ozone NAAQS Program in Clark County Presentation to Air Quality Forum May 10, 2005.
Internet Applications Update Internet Rechartering August 26, 2009.
Attribution of Haze Phase 2 and Technical Support System Project Update AoH Meeting – San Francisco, CA September 14/15, 2005 Joe Adlhoch - Air Resource.
SACM Terminology Nancy Cam-Winget, David Waltermire, March.
TEMPO Air Permitting/ APDU Electronic Data Submission Melissa Lantz, P.E. LDEQ Integrated Data Management Systems (IDMS) Coordinator
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
Millennium Scheduler. 2 Scheduler How to find “Scheduler” Overview Making a task Making a schedule Bugs ________________________________________ More.
DRIVE RE-DEPLOYMENT Research Administrators Council November 17, 2003.
Kinetiq Canada Savage Data Systems
Western Regional Air Partnership Emissions Database Management System CERR Workshop San Francisco May E.H. Pechan & Associates, Inc.
Western Regional Air Partnership Emissions Database Management System January 2004 WRAP Technical Summit Phoenix, Arizona E.H. Pechan & Associates, Inc.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Article: Source Code Review Systems Author: Jason Remillard Presenter: Joe Borosky Class: Principles and Applications of Software Design Date: 11/2/2005.
Western Regional Air Partnership Emissions Database Management System Presentation to Fire Emissions Joint Forum Las Vegas, Nevada December 09, 2004 E.H.
2004 Technical Summit Overview January 26-27, 2004 Tempe, AZ.
Solutions Summit 2014 SmartAnalysis Reporting Terri Sullivan.
Carolina Environmental Program Status of SMOKE Catherine Seppanen Carolina Environmental Program University of North Carolina - Chapel Hill.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
TSS Project Update WRAP Technical Analysis Forum San Francisco, CA October 11, 2007.
1 TEISS Case Project Introduction Melinda Ronca-Battista and Angelique Luedeker ITEP/TAMS Center.
Electronic data collection system eSTAT in Statistics Estonia: functionality, authentication and further developments issues 4th June 2007 Maia Ennok,
Solutions Summit 2014 New in Version 7.0 Terri Sullivan.
Issue Management Group on Sustainable Management, Geneva, February 2010 The UN GHG Inventory Shoa Ehsani SUN Geneva, Palais de Nation, February 2010.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) Status of 3SAQS Air Quality and Emissions Modeling University of North Carolina.
Residential Wood Combustion Emissions Inventory Project for the MANE-VU Region Megan Schuster, MARAMA Annual RPO Meeting, St. Louis, MO November 4-6, 2003.
Utah Department of Environmental Quality Division of Air Quality Utah Department of Environmental Quality Division of Air Quality WRAP Technical Analysis.
11/24/20151 FETS & EPA’s NEI Providers, Features, Lessons Learned August 31, 2009 FETS Project Meeting Boise, ID.
WRAP Emission Inventory Status For the Attribution of Haze Project Workgroup Presented by Jeffrey Stocum Oregon DEQ Emissions Inventory Specialist as a.
AoH Conference Call August 10, 2004 Air Resource Specialists, Inc.
ITEP Project Report Tribal Data Development Working Group Meeting Lapwai, ID July 26-27, 2006 Presented by: Jenifer Pond, Tech Specialist.
Anjanae Brueland & Janet Wingard.  What is Network Design, Planning & Management?  System Development Life Cycle (SDLC)  The phases of an information.
February 23-24, 2005Salt Lake City, Utah1 National Inventory Format NIF3 Methodology & Visual Display Phase 2 Fire Emission Inventory WRAP – FEJF.
1 Emissions Modeling Survey Results Marc Houyoux, US EPA Presentation to the RPO National Workgroup November 4-6, 2004 St. Louis, Missouri.
Suite Rates System Design Specification (SDS) and Planning Document.
Overview of ARS Presentations and Review of EI Data Sets AoH Meeting, Salt Lake City September 21-22, 2004 Air Resource Specialists, Inc.
Aras.com ACE 2011 International PrintHawk Enables your users print hundreds of file types directly from Aras with administratively controlled settings.
E.H. Pechan & Associates, Inc. 1 EDMS Purpose Regional Haze Rule Implementation Performance Monitoring Region-Wide Emission Inventory Analysis of Collected.
Western Regional Air Partnership Emissions Database Management System Community Modeling and Analysis System Center Models – 3 User’s Conference October.
TSS Project Update WRAP Technical Analysis Forum Boise, ID May 22, 2007.
Introduction CAD Data Exchange CERN 11 th CATIA FORUM 7 th June 2012 B.Riffaud.
Attribution of Haze Report Update and Web Site Tutorial Implementation Work Group Meeting March 8, 2005 Joe Adlhoch Air Resource Specialists, Inc.
September 28, 2005Missoula, Montana1 Inter-RPO 2002 National Wildfire Emission Inventory - Results - by Air Sciences Inc. and EC/R, Inc. for the Inter-RPO.
EMISSIONS INVENTORY UPDATE Briefing for OTC Committees and Stakeholder Meeting September 13, 2012 Washington, DC Julie McDill & Susan Wierman 1.
Carolina Environmental Program Status of SMOKE Catherine Seppanen Carolina Environmental Program University of North Carolina - Chapel Hill.
Overview of Future Year Emissions Processing for CMAQ Modeling Urban, Regional Modeling and Analysis Section Division of Air Resources New York State Department.
WRAP Activities Overview §308 Technical Work Outline June 3, 2003.
NCI Clinical Trials Reporting Program CTRP User Meeting May 4, 2011.
Attribution of Haze Project Update Fire Emissions Joint Forum Meeting September 8-9, 2004 Worley, ID.
ITEP CY04 3 rd Quarter Report October- December 2004 Emissions Forum Meeting January 26-27, 2005 San Diego, CA Jenifer Williams, Technology Specialist.
Air Resources Board California Environmental Protection Agency CCOS STATUS REPORT Policy Committee Meeting Saffet Tanrikulu, Ph.D. October 25, 2002.
E.H. Pechan & Associates, Inc. Emissions Data Management System for the Western Regional Air Partnership Presentation to the WRAP Emissions Forum April.
Emissions Forum 2003/2004 Budget July 2, Emissions Forum 2003/2004 Budget Review status of 2003 projects Completed In process Not started Thoughts.
Internet Rechartering Update
MANE-VU Emissions Inventory Update
Status Report to the Stationary Sources Joint Forum:
David Holoman E.H. Pechan & Associates, Inc.
Welcome Traceability Software Integrators
AoH Conference Call August 24, 2004
2002 National Emission Inventory (NEI)
Air Resource Specialists, Inc. July 23, 2004
Phase 2 – 2002 Fire Emissions Inventory
E.H. Pechan & Associates, Inc.
2018 SO2 Emissions Evaluation for Non-Utility Sources
Fire Emissions Joint Forum
AoH Conference Call August 24, 2004
CMGT 410 HOMEWORK best future education / cmgt410homework.com.
Presentation transcript:

Presented by: Eastern Research Group, Inc. September 27, 2005 Status Report to the WRAP Emissions Forum EDMS Testing

2 Overview of Presentation Scope and Objectives Methodology Schedule for Completion Beta test-to-Beyond-Beta Test Comparison

3 Scope and Objectives Beta Test  Usability  Functionality Main/home pages Standard reports GIS/Dynamic reports (limited) Data upload (limited)  Data Integrity Inventory 1: 2002 Draft NEI Beyond-Beta Test  Bug Resolution  Functionality Ad hoc reports Standard reports (limited) GIS/Dynamic reports Data upload  Data Integrity Inventory 8: Version 1.2 Revisions, fire, biogenics  Specifications Compliance

4 EDMS Testing Methodology Beta Test  Test Plan General Main/home All areas of functionality  Test Worksheets  Bugzilla  Reporting Findings, statistical analysis Recommendations Beyond-Beta Test  Acceptance Plan (Pechan)  Test Plan New/revised functionality, data Bugzilla reports Specifications checklist  Reporting Findings Recommendations

5 EDMS Bug Resolution Beta Test Bugs:  113 by ERG + 98 by Others  211 Total Beyond-Beta Test to Confirm:  183 Closed  20 Open - Enhancement  8 Open - Unresolved  Others

6 Specifications Checklist General Requirements  Basic capabilities  User’s Manual Data Requirements  General  Point, Area, Onroad, Nonroad, Fire, Biogenics, Tribal and County Accounting, Data Versions Functional Requirements  General  Import, GIS, Fire, Reporting, Export, Security Reports  Standard, Ad hoc, Sector-specific Cross-Reference to Reported Bugs Reference: “EDMS Software and Hardware Development Plan,” Pechan 4/16/04

7 Specifications Evaluation Process First-time Test? Applicable Closed Bug? Evaluation:  Acceptable?  Unacceptable?  Cannot be Determined?

8 EDMS Testing – Next Steps Develop Queries from NIF files: 9/30  New fire and biogenics data  Revised point, area, mobile, nonroad data Begin Testing: 10/3 Complete Testing: 10/28 Draft Report: 11/15 Final Report: 12/15

THANK YOU! Any questions?