Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011.

Slides:



Advertisements
Similar presentations
n-DVCS/E status report
Advertisements

HELYCON Hellenic Lyeum Cosmic Observatories Network Developing and Constructing An Extensive Air Shower Detector Antonis Leisos Hep2006-Ioannina Hellenic.
SBS Hadron and Electron Calorimeters Mark Jones. SBS Hadron and Electron Calorimeters Mark Jones Overview of GEn, GMn setup Overview of GEp setup The.
SBS Hadron and Electron Calorimeters Mark Jones 1 TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: AAA A.
Jin Huang Los Alamos National Lab.  Cited from March collaboration Meeting EC group Internal Communication Jin Huang 2 Preshower ID power drop significantly.
HCAL-J Status Hadron Calorimeter HCAL-J SBS Collaboration Meeting July, 2014 G. B. Franklin Carnegie Mellon University 7/8/2014 Carnegie Mellon INFN, Catania.
SoLID EC Design for IHEP 2012/10. Basic Features of Preliminary Design Based on COMPASS Shashlyk module design. 0.5mm lead/0.12mm air gap/1.5mm scintillator/0.12mm.
W. Clarida, HCAL Meeting, Fermilab Oct. 06 Quartz Plate Calorimeter Prototype Geant4 Simulation Progress W. Clarida The University of Iowa.
Prototype of the Daya Bay Neutrino Detector Wang Zhimin IHEP, Daya Bay.
02/10/2004 Minimum Bias Trigger Scintillator Counters (MBTS) for early ATLAS running M.Nessi ATLAS week, Freiburg.
1 Prototyping Megaton-Scale  Detectors Jason Trevor DOE Review July 25, 2007 Developing a New Lower-Cost Scintillator Design.
Status of CLAS12 PCAL project
HCAL-J Update (G.B. Franklin, CMU, Mar. 2015) 40 Ton Detector 288 modules Arranged in 4 sub-assemblies 24 Modules (360 cm) 12 Modules (180 cm) 1 Absorbers.
A crude (lower limit) estimation of resolution and event rate Development and Construction of an Extensive Air Shower Array in HOU Antonis Leisos, Hellenic.
1 Tianchi Zhao University of Washington Concept of an Active Absorber Calorimeter A Summary of LCRD 2006 Proposal A Calorimeter Based on Scintillator and.
Proposal for IHEP participation in CBM ECAL
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Central Neutron Detector March ’11 Update Central Neutron Detector March ’11 Update Daria Sokhan IPN Orsay CLAS 12 GeV Workshop Paris, France – 9 th March.
NuMI Schematic View of the MINOS Scintillator System 8 m Scintillator Module WLS Fibers Optical Connector Clear Fiber Ribbon Cable (2-6 m) Multiplex Box.
Shashlik type calorimeter for SHIP experiment
CALICE Meeting DESY ITEP&MEPhI status report on tile production and R&D activities Michael Danilov ITEP.
Construct two layers of hadron calorimeter and test Makoto Harada High Energy Physics Laboratory Faculty of Physics Department of Science Shinshu University.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
Time of Flight Counter BESIII International Review Sep. 16, 2002 Heng Yuekun
0 The LHCb Hadron Calorimeter Rustem Dzhelyadin, (IHEP, Protvino) INSTR02 Conference, BNPI, Novosibirsk, Russia Contents: Œ Design overview  Trigger with.
2004/Dec/12 Low Radioactivity in CANDLES T. Kishimoto Osaka Univ.
Shower Containment and the Size of a Test Calorimeter Adam Para, September 6, 2006.
Study of Sampling Fractions Shin-Shan Yu, A P, Hans Wenzel, October 18, 2006.
서준석, KPS, R&D of Extruded Plastic Scintillator 서 준석 김 동희, 양 유철, 오 영도, 장 성현, 조 기현, KHAN Adil, MIAN Shabeer Ahmad ( 경북대학교 )
The Tungsten-Scintillating Fiber Accordion Electromagnetic Calorimeter for the sPHENIX Detector Craig Woody, for the PHENIX Collaboration Physics Department,
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
Design and optimization of Electromagnetic particle Detectors (EDs) in LHAASO-KM2A Xiangdong Sheng, Jia Liu, Jing Zhao on behalf of the LHAASO collaboration.
Linear collider muon detector: Marcello Piccolo Amsterdam, April 2003.
Preliminary study of electron/hadron discrimination with the NEUCAL detector.
IoP HEPP Lancaster 31/03 – 02/04/08 Gavin Davies Dr. Athanasios Hatzikoutelis Dr. Laura Kormos Lancaster University T2K UK Collaboration  DS-Ecal Design.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
Systematic Studies of Small Scintillators for New Sampling Calorimeter E.P.Jacosalem, S.Iba, N.Nakajima, H.Ono, A.L.Sanchez, A.M.Bacala & H.Miyata GLD.
HE CALORIMETER DETECTOR UPGRADE R&D Y. Onel for University of Iowa Fairfield University University of Mississippi.
Experimental Nuclear Physics Some Recent Activities 1.Development of a detector for low-energy neutrons a. Hardware -- A Novel Design Idea b. Measure the.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Tracking (wire chamber) Shield radon, neutron,  Source foil (40 mg/cm 2 ) Scintillator + PMT 2 modules 2  3 m 2 → 12 m 2 Background < 1 event / month.
CLAS12 forward detector: Pre-shower S. Stepanyan (JLAB) Collaborating institutions: YerPhI, JMU, OU, NSU, Orsay-IPN Concept, R&D, PED … CLAS12 Detector.
E. A. Albayrak, HCAL Meeting, Fermilab, Nov HE CALORIMETER DETECTOR UPGRADE R&D STATUS E. A. Albayrak for The University Of Iowa Fairfield University.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
PCAL Strips light transmission properties April 25, 2011April 26, 20111April 27,
E Precision Measurement of the Neutron Magnetic Form Factor up to Q 2 =13.5 (GeV/c) 2 by the Ratio Method B. Quinn, J. Annand, R. Gilman, B. Wojtsekhowski.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Scintillator Strips DongHee Kim Kyungpook National University Daegu, South Korea.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
first results from EMCal test beam
Quartz Plates R&D Status By F. Duru, S. Ayan, U. Akgun, J. Olson, Y. Onel The University Of Iowa V.Podrasky, C. Sanzeni, D.R.Winn Fairfield University.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
MINER A Main INjector ExpeRiment for v-A Active segmented scintillator detector: 5.87 tons Nuclear targets of C, Fe and Pb, Water, Helium.
DESY Beam Test of a EM Calorimeter Prototype with Extruded Strip Scintillator DongHee Kim Kyungpook National University Daegu, South Korea.
CLAS12 Pre-shower H. Voskanyan (YerPhI)  R&D: Test measurements  Prototype CLAS Collaboration, CLAS12 TWG Meeting February 28, 2007, JLAB.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
1 Plannar Active Absorber Calorimeter Adam Para, Niki Saoulidou, Hans Wenzel, Shin-Shan Yu Fermialb Tianchi Zhao University of Washington ACFA Meeting.
PROPOSAL FOR A MUON VETO SYSTEM BEHIND THE HADRONIC CALORIMETER (MUV-3) Problems and requirements:  Expected total rate for 9.25 < R < 120 cm: 12.1 MHz:
Gamma Detector of Plastic Scintillator Oct. 2, 2009 IP-BSM Group 1.
Baby MIND, Large Area Trigger Counters E. Noah WA105 General Meeting 21 January 2015.
DEVELOPMENT OF THE POLYSTYRENE SCINTILLATOR TECHNOLOGY AND PARTICLE DETECTORS ON THEIR BASES VLADIMIR RYKALIN IHEP, PROTVINO INSTR-14, NOVOSIBIRSK, 24.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
IFR Detector R&D status
IFR Detector R&D status
Development of a Compton Camera for online range monitoring
SHiP combined test beam 13 September – 2 October
CLAS12 Forward Detector Element PCAL
Chris Smith California Institute of Technology EPS Conference 2003
Presentation transcript:

Hadron Calorimeter HCAL-J GEp Electron Calorimeter BigCal Hadron Calorimeter 1 G. Franklin, Carnegie Mellon University 10/13/2011

Requirements for the SBS experiments: Match acceptance of SBS magnet/polarimeter Run with high threshold while maintaining high trigger efficiency Linear energy response 0.5 ns time resolution 5 mrad angular resolution Hadron Calorimeter 2

40 iron/scintillator layers (~ 5 ¸ nucl ) 2.0 cm iron plates 0.5 cm scintillator plates 14.2 cm x 14.6 cm 120 cm long wave-shifter readout along 1 side 6 photo-electrons for min-ionizing thru one scintillator PMT COMPASS HCAL1 Module Design 3

HCAL-J Design Each module: 15 cm x 15 cm Layered scintillator and iron 288 modules for JLab HCALExisting HCAL1 in COMPASS HCAL-J based on COMPASS HCAL1 Replicate with small design modifications 24 Modules (360cm) 12 Modules (180 cm) 4

40 layers 20 mm iron / 5 mm scintillator Integral WLS/ Light guide Acrylic with Coumarin-7 impregnated surface 5 mm thick Novel light guide for 1 in PMTS Steel casing JINR (DUBNA) produced 9 HCAL modules of COMPASS design Funded by CMU Hole in downstream light guide HCAL-C Module shown on its side (WLS and side cover removed) 5

6 COMPASS Light Guide /WLS

Geant4 Energy Resolution Studies 7 Energy2.5 GeV5.0 GeV7.5 GeV10.0 GeV Resolution: ¾ /E48%31%27%22% Efficiency at ¼ mean signal: Neutrons 97.3%99.2%99.1% Efficiency at ¼ mean signal: Protons 98.8%99.6%99.4%99.0% ¼ signal thresh. ½ signal thresh.

Geant4 Spatial Resolution Results Achieves required angular resolution with HCAL positioned 17 m from target: 5 cm / 17 m ! 3 mrad resolution 8 Agreement with COMPASS data JLab kinematics

9 Geant4 Timing Simulations FWHM = 1.12 ns ¾ = 0.48 ns FWHM = 2.1 ns ¾ = 0.9 ns Waveshifter decay time 8 ns ! 3.5 ns PMT rise time 10 ns ! 2.5 ns Maximize N pe 0.5 ! 1.0 cm scint. Simulation using COMPASS parameters Agrees with published COMPASS HCAL performance Simulation using faster waveshifter dye and PMTs Meets SBS requirements To be confirmed with prototype HCAL module Trigger Time (ns)

Use commercial WLS with fast decay time Need light guides 10

11 EJ Can’t be excited with “typical” PPO / POPOP scintillator scintillator WLS PPO/POPOP Scintillator emission not matched to WLS absorption BC-484 Possible Fast WLS Solutions EJ WLS Decay time 1.5 ns Or BC-484 WLS Decay time 3 ns

12 Possible Solutions for Scintillator BC-420$ 1,140k Alternative PPO scintillator< $ 100k JINR Production FNAL Extrusion + CMU Machining Issues Short attenuation length at short wavelength Delays in initiating production of PPO-only samples at JINR 15 cm too wide for FNAL extrusion Two problems solved with design change Design with WLS down center of each module 7.5 cm scintillator on each side Double # iron plates (increases cost by 20%)

13

14 GEANT4 Optical Monte Carlo Light Pipe Design Studies (Vahe Mamyan) For offset WLSFor centered WLS Design 1 For centered WLS Design 2 No foil65.0%61.1%64.6% Foil wrapped75.4%73.9%77.6% Results for simulated light transmission Assumed 90% reflective

15 Light Guide Production Found company (ICOMold) that can injection mold large pieces with optical- quality surface $10k tooling for mold $12.59/piece cost For 300 pieces: $10k + $ 3.8k = $ 13.8k

Recent Developments Vincenzo Bellini group (INFN/Catania) has joined (with funding) New WLS quote from Saint Gobain Pending Sample WLS delivery from Saint Gobain Sample scintillator from JINR (delivery unclear) Sample scintillators from FNAL, PPO concentration from 0.5% to 3%, (November) Sample molded object from ICOMold for reflectivity tests 16

17 Scintillator (extruded 7cm x 1 cm)2,400 kg$ 72 kFNAL estimate Chop and Diamond Mill24,000 pc30 kCMU students Iron, 14 cm x 7.5 x 0.5 cm48,000 pc72 kquote Light Pipes (injection molded)300 pc14 kquote Wavelength Shifter (Eljen) (St. Gobain Quote: $ 52.5 k) 300 pc63 kquote Metal Cans, ribs, end-caps300 pc40 k? PMT base adapters300 pc2 k Other (shipping etc.)? TOTAL$ 293 k Cost estimate ~300 modules

FY12Prototype Module Testing Cosmic ray uniformity tests Background measurements Test scintillator and waveguides options Design Finalization Jan 2013Order scintillator Order WLS, Light Pipes Start end-plate and box construction Order Iron April 2013Start scintillator chop and mill Module assembly 9 to 12 months April 2014Complete modules HCAL-J Project Timeline 18