+ Onsite Sewage Systems Wastewater Management VACO Community Development and Planning Steering Committee November 13, 2011.

Slides:



Advertisements
Similar presentations
BAT Work Group. BAT Work Group Goals Develop a procedure for identifying technologies eligible for funding Propose policies and regulation necessary to.
Advertisements

Introduction to Concurrency Management. What is Concurrency? Chapter , F.S. requires Comprehensive Plans to adopt a concurrency management system,
Land Use Program Septic System Overview Scott Weldon
HOUSE BILL 89 ONSITE WASTEWATER STAKEHOLDER MEETING 2 nd meeting September 8, 2011 Crystal Lovett, MO DNR Facilitator, and DNR-DHSS Panel.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
On-site Sewage Facility (OSSF) Trends in Texas
Presented to the Connecticut Association of Water Pollution Control Authorities | April 26, 2013 Community Systems 101 Presented by Thom Knowlton, P.E.
Welcome “Sewers – The Key to Hauppauge Revitalization: The Next Economic Boom ” 1 June 23, 2010.
Environmental Monitoring & Protection Unit
Springs Protection Options Septic System Evaluation Program Board of County Commissioners Meeting November 13 th 2012.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
National Pollutant Discharge Elimination System -NPDES Permit Process-
Promoting Smart Growth with Wastewater Management Optimizing Conservation and Growth with Wastewater Management Strategies.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
Rule Change Update MPCA 1/13/ Mid-Sized ISTS (MSTS)
Connecticut Department of Energy and Environmental Protection.
Smart Growth / Smart Energy Toolkit Wastewater and Higher Densities Achieving Higher Density Development In Areas Without Sewer/Water Service Smart Growth.
WEKIVA BASIN ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM STUDY Bureau of Onsite Sewage Programs Division of Environmental Health Florida Department of.
Massachusetts Public Health Inspector Training Wastewater Certificate Program (MA PHIT WW) Session 5: Design and Plan Review— Non-Conventional Systems.
OVERVIEW OF CHAPTER 40B FUNDAMENTALS The Next Chapter of 40B: A Training on the Latest Developments in the Affordable Housing Law Fall 2011 Presented by.
Alternative Onsite Sewage Systems: New Regulations & Issues for Localities Potomac Watershed Roundtable January 7, 2011 Thomas E. Crow, Director Division.
After the Sanitary Survey
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
BCC Public Hearing for consideration of an Agreement to Offer Donation of Real Property -and- a Solid Waste Management Permit Renewal APPLICANT: Hubbard.
WASTEWATER FACILITIES PLANNING Public Information Session August 29, 2013 Town of Clinton, CT Water Pollution Control Commission.
HARTFORD | STAMFORD | WASHINGTON, DC | GREENWICH | LAKEVILLE Connecticut Association of Water Pollution Control Authorities, Inc.
Western Regional Gas Conference August 24, 2010 Distribution Integrity Management Programs (DIMP) Rule.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
1 “ Understanding the Local Role of Improving Water Quality” Virginia Association of Counties November 14, 2011 Virginia Association of Counties November.
Public Hearing Modifications to the Gated Community Ordinance Board of County Commissioners Presented by the Orange County Public Works Department February.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
What is the Chesapeake Bay TMDL? Total Maximum Daily Load –Amount of pollutants that a water body can receive and still support designated uses Drinking,
VI. Developing a VSMP Program General Stormwater Training Workshop.
WATER QUALITY TOPICS ENFORCEMENT – ARE FINES BECOMING A WAY OF LIFE AT THE DEQ By:Donald D. Maisch Supervising Attorney, Water Quality Division Office.
Status Report on Chesapeake Bay Clean Up Plan Wastewater Sector June 2, 2010.
Chesapeake Bay Policy in Virginia - TMDL, Milestones and the Watershed Agreement Russ Baxter Deputy Secretary of Natural Resources for the Chesapeake Bay.
John Kennedy VA DEQ - Ches. Bay Program Mgr Tributary Strategies: Point Source Nutrient Controls Potomac Watershed.
1 Large On-site Sewage Systems Maryanne Guichard May 16, 2008.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Draft Stormwater Proposal Home Builders Association of Virginia Richmond, Virginia June 29, 2009.
Streamlining Rules for Pretreatment Regulation Requested changes to Chapters 922 & 923 of the City of Zanesville Codified Ordinances Presentation to City.
Maryland’s Nutrient Trading Program How Trading Works John Rhoderick Maryland Department of Agriculture.
Proposed Revisions to the Educational Facilities Regulations N.J.A.C. 6A:26 and N.J.A.C. 6A:26A February 6, 2013.
Northern Virginia Regional Commission MS4 Meeting March 17, 2011 Virginia Phase II Watershed Implementation Plan (WIP) Approach.
Final Omitted Rulemakings Repeals: Employer Trip Reduction; Portable Fuel Container Requirements; and St. Joe Resources Company Emission Limits Environmental.
Northern Virginia Regional Commission MS4 Workgroup March 17, 2011.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
2012 Industrial Stormwater General Permit Modification Presented by: Jeff Killelea Department of Ecology Moderated.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
Urban Runoff Pollution Ordinance 2017 Proposed Update
Septic System Overview
Municipal Separate Storm Sewer System (MS4) Permit
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
Biosolids Public Workshop March 22, 2016
Ohio EPA Division of Surface Water Update
Consideration of Final Rulemaking
Tuscarawas County Health Department Operation Permit
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Sacramento County Stormwater Quality Program
Water Quality Trading Advisory Committee MDA Headquarters
Maryland’s Phase III WIP Planning for 2025 and beyond
Water Quality Trading Advisory Committee MDA Headquarters
“How To Ace an Inspection” Russell McLaren – Entergy ARES Water Lead
BAT Work Group.
Sacramento County Stormwater Quality Program
Presentation transcript:

+ Onsite Sewage Systems Wastewater Management VACO Community Development and Planning Steering Committee November 13, 2011

+ Overview for Discussion AOSS Regulations Alternative Discharging Sewage Treatment Regulations Civil Penalty Regulations Loudoun County Inspection Program Report Chesapeake Bay TMDL Residuals (Septage and Waste Activated Sludge) HB 2185 Discussion

+ AOSS Regulations Emergency Regulations are no longer in effect [10/6/11]. Final Regulation to be effective 12/7/11. Meantime nothing other than what is placed in a permit. FIVE Parts: 1 General; 2 Performance Requirements; 3 Operation & Maintenance; 4 Horizontal Setback Requirements; 5 Waivers from Certain Performance Requirements. Applicability is different for certain provisions in the Chapter. O&M applies to all AOSS whenever permitted. Chesapeake Bay nutrient requirements don’t apply until 12/7/13. Generally approved treatment units will require re- approval in 5 yrs which is new.

+ Key Changes from Emergency Regulation Part V. This part allows Professional Engineers designing under § of the Code of Virginia to waver from certain performance standards provided they can substantiate the design with engineering standards, peer reviewed research, etc. and provide more rigorous sampling and testing. Added design performance standards for the Chesapeake Bay watershed. Removed discharges to wetlands and removed spray irrigation systems – DEQ primary Eliminated the definition of “relationship with an owner” and associated text relating to same. Eliminated the requirement for an operator to report when no longer operating a particular AOSS. Added operator violation if not performing operation as required. Aligned O&M for large AOSS to that of DEQ permitted systems to eliminate confusion.

+ Concerns Will VDH be able to manage the program? Based on results to date, it appears unlikely. It appears resources have not increased or been reallocated or prioritized. Leadership doesn’t appear to exist. No responsibility to see the program succeed is apparent. Enforcement will come from the Attorney General’s office where past experience points to unwillingness to prosecute. The data system / data management system is not adequate and uses more resources than necessary. Can local governments assure their citizens there is adequate public health and a healthy environment? Take steps to ask the state and local health department for statistics on AOSS and AD STP. (see past VACO request) Enact ordinances to support regulations e.g. civil penalties. Model Loudoun’s success.

+ Alternative Discharging Sewage Treatment Regulations Individual homes with 1000 gallons per day or less discharge. Unchanged since Opened for revision and extensive revisions proposed see: Changes to mirror AOSS as much as possible. Old language, etc. has been eliminated, but still more prescriptive than AOSS. Electronic reporting required.

+ Civil Penalty Regulations 12VAC5-650 proposed June 22, Sent back to VDH for changes by Governor. Changes made and currently under review by the Secretary. Prepared prior to AOSS ER. – language compatibility shaky. Weak penalty for most regulation violations $25/$50. Not submitting report $50/$100. Very much needed and better than nothing!!

+ Loudoun County Inspection Program Report See complete report at: Inspection Program Basics. Required for all AOSS once annually. Inspector – non-county employed [Engr., AOSE, NSF, Mfgr/LCHD]. Consistent inspection report – electronic. Resultant inspection report falls into 4 categories: 1 all OK; 2 minor problems; 3 not operating as designed but not failing; and 4 failing (sewage on the ground) Civil penalties in ordinance

+ Loudoun County Inspection Program Report cont. Key findings: Owners need notice(s) to get inspection. Some will not get inspection without tickets or other enforcement actions. There is no indication that recording requirements in the land records has helped get inspections. Older Low Pressure Distribution (LPD) systems and some other systems are not constructed with access points for inspection and will require minor construction. Also, often never had maintenance. Contrary to industry predictions for either early or late problems, the older a system was the more that had problems. In 2009, 110 tickets were written while in 2010 there were 79. All tickets were for failure to get an inspection. 24 failures in 2009 with none in Differences between County and State programs should be eliminated to the greatest extent possible to reduce confusion and possible non-compliance e.g. inspector and operator.

+ Chesapeake Bay TMDL Onsite Systems Reduction from current load required (load modeled). 50 percent nitrogen reduction by AOSS from conventional in (up to 10,000 gallons per day),(50% equivalent to 20 milligrams per liter going to the soil). Large AOSS greater than 10,000 GPD, must reduce nitrogen, prior to discharge to the soil, to 8 milligrams per liter to give 3 milligrams per liter at property boundary. Missing pieces Trading Community/locality overall impact. Priorities and Funding

+ Residuals (Septage and Waste Activated Sludge) Sleeping giant Added load from AOSS O&M and 5 year pump-outs to WWTP. Discharge pounds already set for WWTP. Likely to require upgrades in any case. Growth impacts both onsite and sewered. Consideration of septage treatment only facilities in areas where septage is located Need to look at stormwater facilities and residuals from it also.

+ HB 2185 & Discussion Robert E. Lee, PE Wastewater Management