PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE

Slides:



Advertisements
Similar presentations
Ref.: New Acquisition Policy by DAU, 20 May 2003, PMT-352
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
MODIFICATION 5/ N N Y PROGRAM TO BE MODIFIED STILL IN PRODUCTION 6/ Y SEPARATE ACQUISITION EFFORT 5/ N TOTAL COST OF MODIFICATION >= MAIS or MDAP 5/, 8/
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Financial Systems Needs Assessment Project Update Monthly Research Administrators Meeting March 11, 2010.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force AFRB MDD Template Rank, Name Office Symbol Date See footnotes on each.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
Chemical Biological Defense Acquisition Initiatives Forum (CBDAIF)
SEE OTRR LONG-RANGE PLANNING CHECKLIST SEE OTRR PLANNING CHECKLIST SEE OTRR PRE-REVIEW CHECKLIST LONG RANGE PLANNING PHASE PRE-REVIEW PHASE At OTRR, the.
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Transforming the Way We Work.
Presented at the 2nd Annual DAU-South CONTRACTING CONFERENCE & EXPO
Life Cycle Logistics.
1 1 Nunn-McCurdy Legislation/Program Impacts Della McPhail Chief Financial Officer 308 ARSW DISTRIBUTION STATEMENT A: Approved for public release; distribution.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
Federal Acquisition Service ETS2 Transition Planning Meeting # 19 ETS2 Transition Planning Meeting # 19 January 25, 2012.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
2.1 ACQUISITION STRATEGYSlide 1 Space System Segments.
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Contracting (Product) Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Test and Evaluation Master Plan
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
MNS - Mission need statement
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
NAVAIRINST D.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
ISA 201 Intermediate Information Systems Acquisition
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
New Space Systems Acquisition Policy
ISA 201 Intermediate Information Systems Acquisition
ISA 201 Intermediate Information Systems Acquisition
Milestone B to Full Operational Capability (FOC) Requirements Management Activities RQM-310, December 2016.
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
Product Support Considerations
The Department of Defense Acquisition Process
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Presentation transcript:

PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE ~ 1 or More YEARS BETWEEN MILESTONE C and Full-Rate Production LONG-RANGE (PLANNING PHASE) For ACAT ID and IAM see page T2 for additional DAB TIMELINE requirements 6 MONTHS (PLANNING PHASE) BEGINNING OF MILESTONE FRP PLANNING PHASE REVIEW FRP CHECKLIST & PEO MAJOR REVIEW CHECKLIST 180 DAYS CONDUCT ACT MEETING – Obtain consensus to proceed. (Email minutes to ACT Participants) 90-180 DAYS DRAFT ACT CHARTER 90-180 DAYS REFINE AoA PLAN, AS, ICD, TDS, CDD, TEMP, DEVELOP CPD, AND SUBMIT BEYOND-LRIP REPORT 90-180 DAYS PREPARE EXIT CRITERIA FOR PHASE C-FRP AND ANY ANTICIPATED ISSUES WITH RESPECT TO SYSTEMS ACQUISITION ACTIVITIES 90 DAYS BEGINNING OF PHASE C 90 DAYS DRAFT BRIEF AND ADM CONFIRM AVAILABILITY OF PRINCIPLES For proposed briefing date 30 DAYS SCHEDULE PRE-BRIEF AND BRIEF VIA ACQUISITION WEBSITE AND PEO FRONT OFFICE CALENDAR 30 DAYS BEGINNING OF PHASE C - FRP PHASE C This phase focuses on evaluating program status, risk, and readiness to enter full-rate production/ procurement and deployment, or to authorize deployment for IT programs or software-intensive programs after completion of IOT&E. 30 DAYS (PRE-REVIEW PHASE) 30 DAYS REVIEW FRP PRE-REVIEW CHECKLIST ENSURE SYSTEMS ACQUISITION ACTIVITIES HAVE BEEN INITIATED 30 DAYS 20 DAYS SEND PRE-BRIEF TO ACT MEMBERS FOR REVIEW CONDUCT THE FRP PRE-BRIEF (Closed Session) 7 DAYS ~1 DAY (REVIEW PHASE) 5 DAYS SEND FINAL BRIEF AND ADM TO ACT FOR REVIEW SUBMIT MAJOR PROGRAM REVIEW READINESS SHEET TO PEO 2 DAYS ENTRY CRITERIA FOR PHASE C-LRIP/IOT&E SATISFIED EXIT CRITERIA FOR PHASE C- LRIP/ IOT&E SATISFIED MS C PHASES FRP At FRP, the MDA typically emphasizes validation of the following: LONG RANGE PLANNING PHASE PRE-REVIEW PHASE PLANNING PHASE ADM ACQUISITION STRATEGY (prior to LRIP) APB (Including CAIV-based objectives) BEYOND-LRIP REPORT CPD PHASE C-FRP EXIT CRITERIA THREAT ASSESSMENT TEST PLANS (Especially for IOT & E) TEMP ENVIRONMENTAL CONSEQUENCES CCA Requirements ADEQUACY OF RESOURCES (Manpower and Funding) ICE AND MANPOWER ESTIMATE (10USC2434) ISP UPDATE SEE DoDI 5000.2 ENCLOSURE (3) for additional requirements BEGINNING OF FULL- RATE PRODUCTION Execute Full-Rate Production Deploy System Phase C –FRP Exit Criteria SEE FRP LONG-RANGE PLANNING CHECKLIST SEE FRP PLANNING CHECKLIST SEE FRP PRE-REVIEW CHECKLIST SEE FRP REVIEW CHECKLIST PROCESS Mature Design for Testing Technical Reviews / Readiness Reviews, Audits TECH - EVAL complete START Phase C-LRIP/IOT&E Exit Criteria Issues Resolved or Addressed Logistics Assessment Certification IOT & E Plans Complete & Provided Ready for OPEVAL IOT & E Plans Approved Draft ADM (Ready for System Demo / DT & E initiation / Entry/Exit Criteria Met) Initiate FRP Program Review Planning Process Cost, Schedule Performance Trade Off Analysis Updated ICD, CDD, CPD, AS, TEMP, CARD, Threat, APB, Beyond-LRIP Report Approved FRP Decision Brief With PEO FRP Decision Brief With MDA Phase C – LRIP/IOT&E Exit Criteria Met Coordinate with SECDEF Initiate Acquisition Coordination Team (ACT) Planning Complete and Submit Program Decision Brief Conduct ACT Meetings Coordinate with SECNAV PEO Approve Exit Criteria ACAT III and IV MDA Approve Exit Criteria ACAT I and II Begin Program Decision Brief Updates Coordinate with OPNAV Notify Participants Plan and schedule JROC, OIPT, DAB as required Coordinate with SYSCOM FINISH Schedule FRP Decision Meeting NOTE: Full-Rate Production is conducted to evaluate program status, risk, and readiness to enter Full-Rate Production. Refer to DoDI 5000.2, Para 3.8.4-3.8.5 and SECNAVINST 5000.2C, Para 2.5.4.8.2 for FRP requirements. The DAB timeline can be found on page T-2. PEO C4I and Space ACQUISITION PROGRAM STRUCTURE GUIDE ENCLOSURE (17) Page T-1 VERSION 3.0 FEB 2004