Updates at Nagoya univ. K.Inami (Nagoya) - Photon detector R&D - Lifetime improvements - Simulation design study.

Slides:



Advertisements
Similar presentations
Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Advertisements

Barrel PID upgrade K. Inami (Nagoya-u) and PID group - R&D status - TOP counter - iTOP - Focusing DIRC - To do, cost estimation.
PID Univ. 31.Aug.2002 Contents 1.Introduction 2.PMT structure & Set up 3.Basic performance 4.Experiment results –Gain –Time resolution.
Quartz preparation (quality check and prototype status) Y. Horii (Nagoya University) 1 BPAC, 12th Nov
Study of the MPPC Performance - contents - Introduction Fundamental properties microscopic laser scan –check variation within a sensor Summary and plans.
Photodetector Timing Resolution Burle Micro-Channel Plate Photo Multiplier Tubes (MCP-PMTs) H. Wells Wulsin SLAC Group B Winter 2005.
Performance of MPPC using laser system Photon sensor KEK Niigata university, ILC calorimeter group Sayaka IBA, Hiroaki ONO, Paul.
Super KEKB Collaboration Meeting March 17-19, ‘091 iTOP PID Barrel/Mechanical Design Concepts Marc Rosen, University of Hawaii Outline iTOP concept Current.
Radiator study status Y. Horii, Y. Koga, N. Kiribe, … (Nagoya University, Japan) 1 B2GM, 6 th July.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
Toru Iijima / Nagoya TOP: what has to be done (before decision) Bar quality seems to be satisfactory. Photodetection is (probably) the most critical issue.
08/31/02PID TOP Counter R & D Status — PID and Physics — TOP Counter — R&D Status Katsumi Senyo Nagoya University.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
Blair Ratcliff5 th SuperB Workshop, Paris May PID Related R&D at SLAC: The Focusing DIRC and a Fast TOF Using Cherenkov Light. Blair Ratcliff Blair.
Report on SiPM Tests SiPM as a alternative photo detector to replace PMT. Qauntify basic characteristics Measure Energy, Timing resolution Develop simulation.
Peter Križan, Ljubljana March 17, 2006 Super B Workshop, Frascati Peter Križan University of Ljubljana and J. Stefan Institute Aerogel RICH and TOP: summary.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
2004/12/04RICH2004 Workshop 1 Development of RICH Counters for Belle Upgrade Toru Iijima Nagoya University KEKB/Belle Plan Belle PID Upgrade Plan Status.
May 31, 2008 SuperB PID sessionMarko Starič, Ljubljana Marko Starič J. Stefan Institute, Ljubljana Report on hardware tests and MC studies in Ljubljana.
Blair Ratcliff2 nd Workshop on SuperB, Frascati, March Status Update: the Focusing DIRC Prototype at SLAC Blair Ratcliff Blair Ratcliff Representing:
A DIRC for GlueX April 7, 2006 S. Berridge, S. Spanier.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
Photodetection EDIT EDIT 2011 N. Dinu, T. Gys, C. Joram, S. Korpar, Y. Musienko, V. Puill, D. Renker 1 Micro Channel plate PMT (MCP-PMT) Similar to ordinary.
Study of a Silica Aerogel for a Cherenkov Radiator Ichiro Adachi KEK representing for the Belle Aerogel RICH R&D group 2007 October RICH2007, Trieste,
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
“End station A setup” data analysis Josef Uher. Outline Introduction to setup and analysis Quartz bar start counter MA and MCP PMT in the prototype.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
work for PID in Novosibirsk E.A.Kravchenko Budker INP, Novosibirsk.
Development of TOP counter for Super B factory K. Inami (Nagoya university) 2007/10/ th International Workshop on Ring Imaging Cherenkov Counters.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
Timing properties of MCP-PMT K.Inami (Nagoya university, Japan) - Time resolution - Lifetime - Rate dependence Photon Detector Workshop at Kobe,
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
BURLE update Peter Križan Friday meeting, Mar 24, 2006.
Peter Križan, Ljubljana March 6, 2006 CBM RICH Workshop Peter Križan University of Ljubljana and J. Stefan Institute RICH counters for HERA-B and Belle.
2004/11/30RICH04 Workshop 1 Timing Property of MCP-PMT for Single Photon Detection Toru Iijima Nagoya University Contents Studies of MCP-PMT performance.
1.Effective no. of photoelectrons >= 10 at aerogel layer of
Barrel PID upgrade K. Inami (Nagoya) Ljubljana, Hawaii, Cincinnati and PID group - R&D status - Structure design - Prototype study - Beam test - Photon.
1 Update on Silicon Pixel Readout for a TPC at NIKHEF LCWS08 - Chicago 19 Nov 2008 Jan Timmermans NIKHEF.
Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
Preparation for production phase Web – New web with HV pigtail qualified (?) – Installed on 2 views in Technical run Very little effect on noise; detector.
Module-0 of AFP ToF Detector Libor Nozka on behalf of ATLAS Forward Proton Group Palacky University 1.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Tests of a proximity focusing RICH with aerogel as radiator and flat panel PMT (Hamamatsu H8500) as photon detector Rok Pestotnik Jožef Stefan Institute,
1 First Results of the SLD Cerenkov Polarimeter at the DESY test beam Oleg Eyser Daniela K äfer, Christian Helebrant, Jenny List, Ulrich Velte*
Development of a Single Ion Detector for Radiation Track Structure Studies F. Vasi, M. Casiraghi, R. Schulte, V. Bashkirov.
Aerogel RICH & TOP counter for super KEKB Y.Mazuka Nagoya University June 14-16, 2006 The 3 rd SuperB workshop at SLAC.
TORCH – a Cherenkov based Time-of- Flight Detector Euan N. Cowie on behalf of the TORCH collaboration E N Cowie - TORCH - TIPP June 2014.
SP- 41 magnet ZDC RPC (TOF) DC ST Target T0 detector MPD / NICA and / Nuclotron Experiments Picosecond Cherenkov detectors for heavy ion experiments.
Matthias Hoek Institut für Kernphysik Next Generation Cherenkov Counters* *For Accelerator Experiments 52. International Winter Meeting on Nuclear Physics.
1 Development of a Large Area Photodetector with a Fast Phosphor Anode Toru Iijima Kobayashi-Maskawa Institute Nagoya University Open Meeting for the Hyper-Kamiokande.
M.Taguchi and T.Nobuhara(Kyoto) HPK MPPC(Multi Pixel Photon Counter) status T2K280m meeting.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Monte Carlo Tuning and Beam Test Comparisons Toru Iijima Nagoya University Belle II TOP Mini-Review 2013/11/30Belle II TOP Mini Review 1.
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
Fabio, Francesco, Francesco and Nicola INFN and University Bari
ASTRI camera status Giovanni LA ROSA
Focusing Aerogel RICH with SiPM Photodetectors
Progress on the Focusing DIRC R&D
Deng Ziyan Jan 10-12, 2006 BESIII Collaboration Meeting
Development of hybrid photomultiplier for Hyper-Kamiokande
TOP for g4superb Geometry 18 TOP modules Support structures
Development of microchannel plate phototubes in Novosibirsk
Aging tests of MCP PMTs and MAPMTs
Development of the PANDA Forward RICH with an aerogel radiator
Performance test of a RICH with time-of-flight information
Presentation transcript:

Updates at Nagoya univ. K.Inami (Nagoya) - Photon detector R&D - Lifetime improvements - Simulation design study

2009/7/7-9 B2GM2 Photon detector R&D Square-shape multi-anode MCP-PMT –Multi-alkali photo-cathode –Gain=1.5x10 –T.T.S.(single photon): –Position resolution: <5mm Semi-mass-production (14 PMTs) σ=34.2±0.4ps QE : Ave. QE : TTS < 40ps for all channels TDC [1count/25ps] Wavelength [nm] QE [%]

2009/7/7-9 B2GM3 Lifetime issue Lifetime test with round-shape MCP-PMT –HPK R3809U –MCP with 10  m pore –Multi-alkali p.c. –Aluminum protection on 1 st MCP –Recent production: CT108X Initial Q.E.; 20% at 400nm Initial Gain; 4x10 6 –TTS keeps <40ps. –Need to improve for initial Q.E. and initial aging –Slope seems to be manageable. We can expect to improve during R&D. Output charge (mC/cm 2 ) Relative QE Relative Gain ~3 super-B years

2009/7/7-9 B2GM4 R&D status Multi-alkali p.c. SL10 –Added many protection for gas and ion feedback  Improved lifetime ex. JT0087 Obtained normal Gain and TTS –Even with improved correction efficiency (~35%  ~60%) Put Al protection layer on 2 nd MCP ex. XM0007 GaAsP p.c. SL10 –HPK successfully produced with rather reliable process. –Still need the reduction of dark current and lifetime test. Preliminary result from HPK Old New Measured at Nagoya 1 B2year ~ 0.7C/cm 2 QE before againg QE after againg Old type

2009/7/7-9 B2GM5 R&D status Prototype performance –3 pieces from HPK –QE: reasonable multi-alkali p.c. Still need to improve –Enough gain: ~5x10 5 –Reasonable TTS:  =35~45ps –CE: ~55% Basic performance is OK.  Lifetime test at Nagoya soon.  New improved type will be ready at the end of this month. Cross-talk QE at 400nm TDC vs ADC TDC after correction XM0001

2009/7/7-9 B2GM6 Cross-talk XM0001; HV=–3400V –Height of cross-talk pulse: 1/10 of signal –Similar wth previous studies ~80mV ~8mV

2009/7/7-9 B2GM7 Design study Check performance for several designs –With actual effects MCP-PMT: QE, CE, TTS, dead space Start timing fluctuation (25ps) 2-bar fTOP 1-bar fTOP iTOP

2009/7/7-9 B2GM8 Performance Multi-alkali, CE=60%, >350nm Efficiency Fake rate cos  region GoodBad 2-bar0~0.60.6~0.8 1-bar (iTOP)0~0.3,0.6~0.3~0.6

2009/7/7-9 B2GM9 Design consideration Trial to improve forward part Apply focusing technique –Bounce half of photons to be longer propagation length –Really possible? focusing mirror r = 98% R = 1.5m half mirror r = 50%, t = 50% Matrix readout

2009/7/7-9 B2GM10 Design study summary TOP performance for several condition –Two readout type Multi-alkali p.c.2~3% fake-rate for 3~4GeV/c GaAsP p.c.<2% Start time fluctuation (25ps)>10% for forward part –Maybe possible to improve –One readout type GaAsP p.c.3~4% Multi-alkali p.c.4~6% Depends on the photon detector design –GaAsP p.c.  Both type OK –Multi-alkali p.c.  How many channels can we use?

2009/7/7-9 B2GM11 Design study: to be considered Quartz bar –Size: (90~120) x (40~50) x 2 cm 3 –Edge cut (chamfer): C 0.3~0.5 mm –Flatness at glue point –Deviation of refractive index MCP-PMT (SL10) –Size: 27.5 x 27.5 mm 2 (28x28 in realistic) Effective area: 22 x 22 mm 2 –Channel: 4ch (Width:5.275mm, Gap:0.3mm) or 4x4ch –Multi-alkali p.c., –Correction efficiency: 55% (  60%) –TTS: ~35ps (distribution)

2009/7/7-9 B2GM12 Possible configuration with SL10 44cm width = 16MCP-PMTs Max. 32 PMTs/module –Because of cost limitation 4ch anode/PMT –Maybe, 4x4ch possible 2 types+  to be checked. 28mm pitch (22mm effective area) 16x2 SL10 16 SL10

2009/7/7-9 B2GM13 Summary MCP-PMT R&D –Lifetime tests Round shape MCP-PMT shows manageable lifetime. Square shape MCP-PMT –Improved lifetime by adding many protection for gas and ion feedback –Even with 2 nd layer protection Design study –Confirmation with actual effects is in progress. –Need to check the performance of possible design.

2009/7/7-9 B2GM14 Discussion MCP-PMT is ready? –Hamamatsu SL10 Multialkali p.c., CE=55% GaAsP p.c., CE=35% –Photons MCP-PMT Bialikali p.c. CE=60%? –Basic performance is OK for both? Check QE availability –Lifetime is OK? Hamamatsu: Probably OK from HPK and Nagoya study. Photonis: Look OK Need a few month to confirm. –Cost and Production schedule?

2009/7/7-9 B2GM15 Discussion Design studies converged? –Check with benchmark structure –Include actual effects Start timing fluctuation Incident track fluctuation Actual design of quartz and MCP-PMT –Check PID performance for several incidence condition  Feedback to structure study –Check performance for some physics cases With fsim With gsim4 and analysis code

2009/7/7-9 B2GM16 Discussion Structure studies –Show technically possible quartz layout and size  Feedback to simulation study –Connection to ECL and CDC –Quartz support Honeycomb plates? –PMT support PMT maintenance possibility –Discuss with KEK workshop

2009/7/7-9 B2GM17 CAD from KEK workshop

2009/7/7-9 B2GM18 Discussion Electronics –Readout and trigger BLAB3 –Performance and data structure –Cost and schedule CFD ASIC? –Schedule –Readout TDC? On COPPER? –HV system Need ~500ch, HV<-4kV CAEN HV system? –LV system How large?, How many ch?

2009/7/7-9 B2GM19 Discussion Cost for several choice –Quartz Okamoto (Nagoya) Zygo/OSI (Cincinnati) –MCP-PMT Hamamatsu (Nagoya) Photonis (Hawaii? Ljubljana?) –Electronics (Hawaii) –Structure (Hawaii, Nagoya)

2009/7/7-9 B2GM20 Cost estimate & Production time Quartz bars –16~18 modules (2x40x91.5cm 3 x3 + mirror, standoff) –Okamoto optics (by Nagoya) 1800x 万円 ~ 3.6M$, 2 years –Zygo/OSI (by A.Schwartz-san, Cincinnati) $72k x 3 x 16 + alpha ~ 3.7M$ Photon detector (increasing gradually) –MCP-PMT by Hamamatsu; 600 pieces for TOP, 3 years Multi-alkali photo-cathode; ~2.7M$ GaAsP photo-cathode; ~4.2M$ –MCP-PMT by Photonis; ??? (expect cheaper price?) Electronics Structure

2009/7/7-9 B2GM21 Discussion Schedule toward 2013

2009/7/7-9 B2GM22 Discussion Schedule toward technology choice –By the end of August Make list of possible options –In our case, MCP-PMT choice is important. Make performance catalogue for –MCP-PMTs »QE, CE, TTS, Gain, Lifetime, –Detector configuration »Separation power (eff./fake) »Robustness (beam BG, T0, tracking, photon loss) –By the end of December Decide detector configuration and technology –Show test results »MCP-PMT lifetime, Simulation study, electronics test To be Checked by internal review committee?

2009/7/7-9 B2GM23 Discussion Schedule in this year (Prototype production) –Make prototype with Zygo/OSI quartz New support structure Photonis or HPK MCP-PMT New electronics –Check performance at KEK First, make prototype of radiator (Quartz + support) and photon detector (MCP-PMT + Electronics) and check performance, individually. by the end of this year Make clean room Prepare optical stage etc…