ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Contracts – important issues
CONTRACT A binding agreement between two or more parties for performing, or refraining from performing, some specified act(s) in exchange for lawful consideration.
Payments to Individuals  Independent Contractor/Consulting Agreements Purchasing Presented by: Michelle Hodge.
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
WAKULLA COUNTY Travel & Expense Procedures Manual Workshop September 2, 2008.
Contractors’ Day, June 2008 to the Framework Partnership Agreement & the Specific Grant Agreement Financial Guidelines for co-ordinators and co-partners.
INTRODUCTION We write to introduce our Bank; Safetrust Mortgage Bank Ltd (SMBL) and indicate our willingness to access NHF loans from FMBN, finance the.
Large Scale Projects Aleksejs Šaforostovs LSP Project Manager Joint Technical Secretariat.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
About ACE Purpose of ACE ACE exists to represent its members’ interests to clients, both government and private sector, and stakeholder organisations,
SERVICE LEVEL AGREEMENTS Bob Goldberg 312/
Chapter 1 Professional Architectural Careers, Office Practices, and Opportunities.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
Audit of Public Procurement
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
SBIR Budgeting Leanne Robey Chief, Special Reviews Branch, NIH.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
6 September 2012 GUIDE FOR APPLICANTS CORE 2012 CALL – ELIGIBLE COSTS AND FINANCIAL ISSUES ANNA FASTYN CHIEF EXPERT SECTION FOR BILATERAL PROGRAMMES AND.
Specification & Quantities Estimating
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CONSTRUCTION CONTRACTS DOCUEMENTS
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Interconnect Policy & Contract
PROFESSIONAL PRACTICE AJAY PATSA – A.SRINIVAS B.ARCH – VIII Sem JNAFAU ARCHITECTS DUITES.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 DISPUTE SETTLEMENT THROUGH ADJUDICATION N D Sharma.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 Kingsley Karunaratne, Department of Accounting, University of Sri Jayewardenepura, Colombo - Sri Lanka Practice Management.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 Convention Center Authority Republican Policy Group Presentation March 23 rd 2015.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
16 – 11 – Y2KBy Freddy O. Esenwa (Jnr) NIGERIAN INSTITUTE OF QUANTITY SURVEYORS Q UANTITY SURVEYING AND CHALLENGES OF NATIONAL DEVELOPMENT BY FREDDY OGUGUA.
Decision required Home Complete Start Action 2014 Edition BLUEPRINT MAP KEY A start node that indicates where to begin the map Indicates the direction.
How to Get Rid of Your Auditor Faster Auditor of Public Accounts October 31, 2012.
Child Dependants Allowance and Travel and Dual Accommodation Workshop
Pat Nestor MSCSI MRICS Head of Building Control Dublin City Council
Architecture, Civil Engineer, and Interior Designer
Auditing & Investigations II
Enforcing Architects Rules 2010, protecting profession or public?
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Administration of a FIDIC Contract - Financial Management
Temporary Works Co-ordination
Congratulations, your application has been successful… …what next?
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
SIMAD UNIVERSITY Keyd abdirahman salaad.
Pre-contract Planning and Practice
Engineering Project Tendering.
Supplementary Services Project Management Services.
Contractual Arrangement
Management Verifications & Sampling Methods
Presentation transcript:

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT  INTRODUCTION  APPOINTMENT OF CONSULTANT  SCOPE OF SERVICES  REMUNERATION  REIMBURSABLE EXPENSES  SCOPE OF PROFESSIONAL SERVICES FOR THE CONSULTANT ARCHITECTS  CONCLUSION  RECOMMENDATIONS

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT INTRODUCTION Apart from the mandatory minimum fee scale, the Institute issues the document and in this new document it has been possible to include the Form of Agreement supported by schedules relating to the responsibilities of the Consultants Architects who may be involved in the project. (The Nigerian Institute of Architects, 2000)

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT APPOINTMENT OF CONSULTANT The Employer hereby commission the Consultant and the Consultant hereby agrees to act as Consultant in connection with the Project upon the terms and conditions and scale of professional charges hereinafter set forth.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT SCOPE OF SERVICES The Consultant shall undertake the responsibilities and provide the services described in one, two or all of the stages stated hereinafter: 1. The Normal Services, 2. Partial Services, 3. Additional Services. (The Nigerian Institute of Architects, 2000)

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT REMUNERATION The Normal Service and Partial Services  the Consultant shall be paid in accordance with the Scale of Fees laid down by the Government and published under the title "Consultancy Fees Payable by the Public Sector“  the total fee payable will be based upon an Estimated Total Cost of the Project (ETC) respectively for. Additional Services, For the performance of the services described, the Consultant shall be paid:-  in accordance with the Scales of Fees also Upon a Provisional fee calculated on a time change basis

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT REIMBURSABLE EXPENSES The Consultant shall be reimbursed by the Employer for all expenses actually and properly incurred in respect of items upon presentation of detailed invoices with supporting receipts where practicable subject to a provisional sum not exceeding such sum may not be exceeded without the authority of the Employer.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT SCOPE OF WORK FOR CONSULTANT ARCHITECT Advising, guiding the client on the need to take any major decision required and receiving appropriate approval. Preparing design scheme(s) consisting of drawings and specifications sufficient to indicate spatial arrangements, material usage and design configuration with site arrangements and Architectural massing. Presenting a report on the scheme, including cost implication and programme for the project. (The Nigerian Institute of Architects, 2000)

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT OTHER SERVICES BY CONSULTANT ARCHITECTS  Partial Services, It includes renovation, rehabilitation, restoration, refurbishing of existing buildings and furnishing works shall be carried out in stages of design and supervision process.  Additional Services, Amending drawings because of alterations, location, size or shape as it may be relevant after the employer's approval of a final design.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT CONCLUSION Commencement of services by the architect can then begin after which an Agreement shall become effective upon the Consultant's receipt from the Employer of a written notice to proceed with the services to be provided here in.

ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria SCOPE OF WORKS FOR CONSULTANT ARCHITECTS, 1996 CONDITIONS OF ENGAGEMENT AND CONSULTANCY SERVICES AGREEMENT RECOMMENDATIONS The Employer commission the Consultant and the Consultant agrees to act upon the terms and conditions and scale of professional charges. Scope of works includes preliminary design, production drawings, specifications and details, obtaining tenders to completion, maintenance works, redesigns and additional design work, planning approval requirements, special drawing and models, special meetings, interior design, litigation and arbitration among other includes scope of work.