Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.

Slides:



Advertisements
Similar presentations
Chapter 2 Analyzing the Business Case.
Advertisements

Management’s preliminary comments to the ERC Report.
Enav.it Session 3 Steps towards the SESAR deployment and the ATM system modernisation.
European Strategy for Particle Physics 2013 Preparatory group->Strategy group Individual town meetings Town meeting in Krakow: september 2012 Drafting.
Recommendation for Final Draft Strategic Plan High-Level Seminar on ACSS Strategic Plan Bogor, Indonesia, June 2014.
Systems Analysis and Design 9th Edition
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Analyzing the Business Case
An Approach to Case Analysis
Current Status of ILC Project Keisuke Fujii, KEK May 9, 2015.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
World Nuclear Association 38th Annual Symposium September 2013, Central Hall Westminster, London Nuclear Operation and Radioactive Waste Management.
1 S&T in South Africa – 2005 SA-Norway w/shop Dhesigen Naidoo DDG International.
SCRF ACCELERATOR INDUSTRY STEWARDSHIP OUTLOOK Ken Olsen SPAFOA Fermilab Meeting Nov. 13, 2012.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Atsuto Suzuki. 2 Japan Policy Council Second Recommendations: Regional Development through Creation of Global Country inside Japan Realizing a global.
MEXT Review Process in Japan 2014/7/16 Y. Sugimoto 1.
ILC Status in Japan (II) Yasuhiro Okada Executive Director, KEK Asian Linear Collider Workshop 2015 April 21, 2015, KEK, Japan 1.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Long Range Planning Pier Oddone September 24, 2007.
Part 1 Unit 1 Introduction and Overview Risk Management and Strategic Planning.
MKUKUTA/PER Consultations 2007 DPG session MKUKUTA/PEFAR 22 May.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
Patrick Janot Physics Studies: Status on 31/08/15  Outline u The international context u The FCC-ee at Summer Conferences u The second year of the design.
P5 and the HEP Program A. Seiden Fermilab June 2, 2003.
Atsuto Suzuki. 1. Toward ILC Construction : Japanese Activities 1. Toward ILC Construction : Japanese Activities.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
ILC in Japan A 10 minute introduction H.Weerts Argonne National Lab March 24, 2014 University of Chicago.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
Mysoltani.ir سایت فیلم روشهای مشارکتی Technology Foresight Foresight is about preparing for the future. It is about deploying resources in the best.
1 7th Framework Programme “Ideas” 2   Basic research has an important impact on economic performance   Europe is not making the most of its research.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Chapter 3 Strategic Information Systems Planning.
1 SPAFOA Capitol Hill Briefing December 2013 Harry Weerts International Linear Collider - progress & status SPAFOA meeting, Dec 11, 2013, H.Weerts.
DOE Stanford Site Office Office of Science U.S. Department of Energy 1 U.S. Department of Energy’s Office of Science Office of Science Review of the LCLS.
Status and plans for role of Japan in HL-LHC Katsuo Tokushuku Institute of Particle Nuclear Studies (IPNS) High Energy Accelerator Research Organization.
Management’s preliminary comments to the ERC Report FINANCE COMMITTEE June 19, 2002.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Local Area Agreement Strengthening delivery Improving Outcomes Jon Bright Director of Policy and Delivery Birmingham City Council.
Improving Technology Infrastructure and Web-based Information and Services Northeast Iowa Community College PRP031A Christine Woodson, Project Director.
Management February 20, Annual Review of the Muon Accelerator Program (MAP) Subcommittee members: Ron Prwivo, Ron Lutha, and Jim Kerby.
Hitoshi Yamamoto, 2-Oct Detector Tohoku Forum for Creativity - a Pilot Program - ‘Particle Physics and Cosmology after the Discovery of the Higgs.
The Situation in Japan Yasuhiro Okada, Executive Director, KEK ILD meeting 2014 September 7, 2014, Oshu-city, Iwate, Japan 1.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
NOAA Climate Program Office Richard D. Rosen Senior Advisor for Climate Research CICS Science Meeting College Park, MD September 9, 2010.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Train Station Project Update Report from Ad Hoc Committee December 11, 2007.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
DETECTOR RESEARCH AND DEVELOPMENT Fred Borcherding 1.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
ICFA J. Mnich (DESY) November 5, J. Mnich | ICFA LCWS Panel Discussion 5 November 2015 | page 2 ICFA Web Page and Mandate ICFA: International Committee.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
The Status of the ILC Project in Japan
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
LCC L. Evans, Santander, 2nd June 2016
ILC Status in Japan ECFALC M.Yamauchi KEK June 02, 2016
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Claudia Uribe Colombian ambassador to the WTO
Implementing the Transportation/Land Use Connection Program
FALC report and KEK’s plan for the ILC
Yasuhiro Okada, Executive Director, KEK
SOCIAL DIALOGUE WITHIN EUPAN
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
General Discussion Conclusions:
Presentation transcript:

Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015

1.Review of Discussion Process 2.Reports by Working Groups WG1: Revisiting Scientific Merit of ILC (ILC-LHC) WG2: Evaluating TDR, especially the Cost estimates (Cost Profile) 3.Reports on Technological and Economic Impact Analysis 4.Discussion on Interim Report by the Special Committee 5.Schedule Contents 2

1 st Meeting: May nd Meeting: Nov rd Meeting: Apr th Meeting: Jun (planned) → Discuss Interim Report 1. Review of Discussion Process Task Force (Head: State Minister) Special Committee On ILC Project Impact and Trend Study by Contract WG1: Revisiting Scientific Merit 1st Meeting: June 2014 Held 8 Meetings → Submitted WG Report to SC Based on SCJ’s recommendations, Special Committee investigates critical issues required to judge hosting ILC or not. WG2: Evaluation of TDR & Cost estimates 1 st Meeting: June 2014 Held 6 Meetings → Submitted WG Report to SC [Budget 1$=100\ ] FY14: $0.5M (completed) FY15: $0.5M (approved) 3

Executive Summary (September, 2013) It is too early to grant the full-scale implementation of the ILC project in Japan at the moment. Before the final decision of whether the ILC should be hosted in Japan, following critical issues and concerns should be fully investigated and a clear vision for solutions should be provided. (critical issues to be investigated) A more precise research strategy for the ILC in view of the current LHC experiment A whole project cost profile for the construction, operation, upgrades and decommissioning Detailed plan of international cost-sharing Required human resources and management/operation organization A funding framework for ILC that is supported by the public Recommendations by Science Council of Japan 4

ILC could contribute to new physics beyond Standard Model by precision measurement of Higgs boson and top quark, and exploration of new particles. Based on the result of current LHC experiment, the best strategy and the appropriate energy scale for the ILC should be examined. Depending on the results of the current LHC experiment, the perspective of ILC in view of the search for new particles would be different. Meaning 500 GeV ILC might not be the best option. Around the end of 2017, it is expected that result of the current LHC experiment would be available with enough data accumulation. Since ILC Project requires humongous investments, appropriate international cost sharing should be clarified, and also understanding of the other science community is very important. It should be noted that failing to make a timely judgement could lead to losing global momentum for the ILC. 2. Reports by Working Groups WG1: Revisiting Scientific Merit of ILC 5

2. Reports by Working Groups (Cont.) WG2: Evaluating TDR, especially the Cost estimates 6 A total project cost estimate for the construction of the accelerator and detectors would be about $11B, and annual operation cost would be $ 490M. Costs for future upgrades and decommissioning are not included. Vendors’ Mass production capability for the accelerator components needs to be enhanced. (Esp., Japanese vendors should learn more.) Quality control among several manufacturing site is a big challenge. * Technology for each component is rather “matured,” but manufacturing large number of same components with the same quality and ensure the total system performance after assembly would be rather “novel” challenge. Securing enough talented human resources for construction, operation and management is crucial to the project. It is strongly recommended to analyze the perspectives and feasibility of securing enough human resources in Japan.

3. Report on Technological and Economic Impact Analysis 7 MEXT conducted technological and economic impact analysis of the ILC project by the contract with Japanese consulting company. Economic impacts produced by construction and operation of the ILC was estimated. * Not including expenditure for preparation, infrastructure, or other site specific expenditure. Results: Based on the $21.1B final demands produced by the ILC project, possible induced production value would be $44.6B. Assumptions: (1) 10 years for Construction, and 10 years for operation (2) Final demands is based on the Japanese contribution (3) Added business value is calculated based on the CERN’s past impact analysis, “every €1paid to industrial firms generates €3 of additional business through LHC procurement”

3. Report on Technological and Economic Impact Analysis (Cont.) 8

9 Implication of the results: (1)Economic impacts by the ILC project is not significantly different from other induced production indices. (2)Estimate of added business value is not based on the actual technological impact analysis, could be considered as the maximum estimate. (3)After all, economic impact could not be a major factor to justify estimated humongous costs. * Economic impact for regional economy is out of the scope of this study

4. Discussion on Interim Report by the Special Committee 10 Possible draft recommendations by the Special Committee: (1)Strategy and perspective of the new particle exploration should be clarified. (2)Energy scale of ILC should be examined based on the results of the current LHC experiment. (3)Understanding by the public and other science community than particle physics is very important in the decision making process.

5. Schedule The next Special Committee meeting will be held on June 25 st, and draft interim report will be discussed. The Special Committee will continue to follow the findings by the LHC experiment. After examining the findings of LHC, judgement on ILC will be made. The Special Committee plans to set up another WG for discussing the strategy for securing enough human resource both in terms of researchers and engineers. The new WG plans to conclude the discussion by the end of FY