Team 12 2013/02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.

Slides:



Advertisements
Similar presentations
ECE 477 Design Review Team 16 Neil Kumar, Scott Stack, Jon Roose, John Hubberts.
Advertisements

Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
Left to Right: Michael Kelton, Ethan Hall, Greg Wegman, Vashisht Lakhmani.
ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Design Review Team 13  Spring 2006 Elmer Chao (not pictured), Matt Cozza (not pictured), Joe Waugh (not pictured), Evan Zelkowitz (not pictured)
Jason CrayJoseph Mundackal Michael WarscoRyan Sherlock.
R3R3 Ethan Hall Michael Kelton Greg Wegman Vashisht Lakhmani.
Twitch Plays ECE477 ECE 477 Design Review Team 1 − Spring 2015 Hannan Harlan Root Tornquist.
Design Review: RoboSiM Robotic Surveillance in Motion
ECE 477 DESIGN REVIEW TEAM 7  SPRING 2013 COST ROBOT CAROLINE TRIPPEL, ANDREW LOVELESS, ERIC OSBORNE, BRYAN DALLAS.
ECE 477 F INAL P RESENTATION T EAM 10  S PRING 2013 Ruiyang Lin Vipul Bhat Julia Liston Krithika Iyer.
ECE 477 Design Review Group 9  Spring 2005 Omar Shaikh - Nathan Smith - Jeff Huston - Ryan Koors.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
ECE 477 Senior Design Android Street Car Packaging TCSP Team 12 Chun Ta Huang 2013/02/06 1.
ECE 477 Design Review Team 8  Spring 2008 Mike Cianciarulo, Josh Wildey, Robert Toepfer, Trent Nelson.
Long Range Vehicle Control (Super Tank) Jason Holmes Matt Wickesberg Matt Guenette Michael Piercy.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.
Xin Jin Zelun Tie Ranmin Chen Hang Xie. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation.
ECE 477 Design Review Team 9  Spring 2011 Left-to-right: Oliver Staton, Vinayak Gokhale, Vineet Ahuja, Nick Gentry.
ECE 477 Design Review Group 7  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
Wall-E Prototype I Team 1 Xin Jin
ECE 477 Design Review Group 2  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Design Review Group 11  Fall Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Design Review Team 10  Spring 2007 JUSTIN AZAD AFIFF NUHAIRIADAM.
ECE 477 Final Presentation Team 9  Spring 2011 Above (Left to Right): Nick Gentry, Oliver Staton, Vineet Ahuja, and Vinayak Gokhale.
ECE 477 DESIGN REVIEW TEAM 4  SPRING 2015 Matt Carpenter, Grant Gumina, Chris Holly, and Michael Pak.
Jason Holmes Matt Wickesberg Michael Piercy Matt Guenette Team 12 – Super Tank February 15, 2012.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Final Presentation Team 1  Spring 2013 Zelun Tie Xin Jin Ranmin Chen Hang Xie.
ECE 477 Design Review Team 5  Spring 2010 Fred Grandlienard Andrew Gregor Kevin Mohr Ryan DeFord.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
ECE 477 Design Review Team 10  Spring 2009 Scott Shaw Hussain Vasi Matt Sbai John Fawcett.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE477 Senior Design Android street car Team 12 Libo Dong 1.
ECE 477 DESIGN REVIEW TEAM 14  SPRING Project Overview  Target Audience: Amateur Musicians  Obtain a “Guitar Tab” format of music  View Tabs.
Software Narrative Autonomous Targeting Vehicle (ATV) Daniel Barrett Sebastian Hening Sandunmalee Abeyratne Anthony Myers.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE477 Senior Design Android Street Car Patent Liability Analysis Team 12 Chun Ta Huang 2013/03/27.
Sound Source Location Stand Group 72: Hiroshi Fujii Chase Zhou Bill Wang TA: Katherine O’Kane.
ECE 477 Final Design Review
DOODLE DRIVE Presenter: Peachanok Lertkajornkitti Team 6 Reliability and Safety Analysis.
ECE 477 Design Review Group 3  Spring 2005 “VoIP Connect” Ankur TrushalAshish Dushyant.
<Add team picture or relevant project picture here>
ECE 477 Design Review Team 13  Spring 2007
<Add team picture or relevant project picture here>
Android Street Car Team 12 Zongyang Zhu ECE 477 Senior Design Project
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Design Review Team 21 - Spring 2013
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE477 Senior Design Android Street Car PCB TCSP
Libo Dong Xirong Ye Zongyang Zhu Chunda Huang
ECE 477 Design Review Group 10  Spring 2005 I, Robotic Waitress
ECE 477 Design Review Team 14  Spring 2012
Presenter.
ECE 477 Design Review Team ??  Fall 2012
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

Team /02/28 1

Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu

 Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design  Schematic and theory of operation  PCB layout  Software design/development status  Project completion timeline  Questions / discussion 3

 Our goal is to design a robot vehicle which can manually controlled by human with Android phone.  The vehicle can capture 360 degree images, sense the surroundings, feedback the information back to the phone, collecting data and images and some other minor functions. 4

 PSSC #1 : An ability to control the motion and direction of the vehicle.  PSSC #2 : An ability to avoid obstacles using ultra-sonic sensors.  PSSC #3 : An ability to stream the video to an Android device.  PSSC #4 : An ability to monitor battery status and give low battery alert signal.  PSSC #5 : An ability to send and receive all data and video between the vehicle and Android device. 5

6

7 TypeMajor Component MicrocontrollerNXP LPC1768 MCU Embedded Motherboard Raspberry PI CameraMircosoft LifeCam HD-6000 for Notebooks ChassisDagu 4WD Thumper GPS/GPS AntennaGPS Modules SiRFStar IV GPS receiver SMT ROM mod Fuel GaugeDS2438Z RegulatorTPS6216DGK

8

9

10

11

12

13

14

15

16

17

18 Android Device Android Device Raspberry Pi Raspberry Pi LPC1768 Ultra Sonic Sensors Ultra Sonic Sensors H-bridge Cameras Fuel Gauge Camera Servo motor Camera Servo motor GPS Compass SPI I2CI2C UART 2 PWM 1 PWM 4 GPIO HDQ USB Wi-Fi Adaptors USB

Microcontroller 5 PWMs 1 SPI I 2 C 1 HDQ 12 GPIO 2 UART 19 Raspberry Pi Build a Linux system Function as a server Transmitter data between micro and Android device Android Device Preliminary interface finished Android programming tests Will work on communications with servers

 Current Process ~ Before Spring break: Finalize schematic & PCB layout ( no error), hardware testing and prototyping.  After Spring break ~ the beginning or mid of April: Software development in Android and microcontroller and hardware development  Mid of April ~ End of April: Debugging software, combine software with hardware and finalize the project 20

21