NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
S Y S T E M S E N G I N E E R I N G.
Software Quality Assurance Plan
More CMM Part Two : Details.
Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
Overarching Roles of Critical Partners In A Project 9:30 – 10:00 Rob Curlee, FMO Joseph Dominque, OCISO Mike Perry, EA.
School of Computing, Dublin Institute of Technology.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Chapter 9. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Miguel Nunes Information Systems Project Management IS Project Resources.
Effective Methods for Software and Systems Integration
© 2005 Prentice Hall14-1 Stumpf and Teague Object-Oriented Systems Analysis and Design with UML.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Introduction to Software Quality Assurance (SQA)
CLEANROOM SOFTWARE ENGINEERING.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
1/18/2005Module 41 How the NCSX Project Does Business Work Planning & Design Review Processes.
Software Inspection A basic tool for defect removal A basic tool for defect removal Urgent need for QA and removal can be supported by inspection Urgent.
Software System Engineering: A tutorial
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Chapter 11. Intro  What is Project Management?  Project Manager  Project Failures & Successes Managing Projects  PMBOK  SDLC Core Process 1 – Project.
Project Life Cycle.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
12/2/04Module 2D1 The NCSX Engineering Web – An Overview Part IV Engineering Management & Systems Engineering and Other.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
Maintaining and Sustaining System Integrity Configuration Management for Transportation Management Systems Configuration management (CM) describes a series.
NCSX Data Management Plan Peer Review Bob Simmons March 31, 2003.
 CMMI  REQUIREMENT DEVELOPMENT  SPECIFIC AND GENERIC GOALS  SG1: Develop CUSTOMER Requirement  SG2: Develop Product Requirement  SG3: Analyze.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
How the NCSX Project Does Business
Project Management Why do projects fail? Technical Reasons
September 10, FY 2003 Plans Bob Simmons. September 10, Introduction Overview of Project and Engineering Plans Project Plans Engineering Plans.
NCSX Interface Control Management Plan and Implementing Procedure 003 Peer Review December 19, 2002.
NCSX Document and Records Plan Peer Review Bob Simmons March 14, 2003.
Preparations for working on Station 1 November 22, 2005.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Cmpe 589 Spring Fundamental Process and Process Management Concepts Process –the people, methods, and tools used to produce software products. –Improving.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
CMMI for Services, Version 1.3 Speaker: Business Excellence Date:
Chapter 11 Project Management.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Accelerator Readiness Review October 31, 2006
Software Engineering (CSI 321)
Chapter 6: Database Project Management
Development Projects / Analysis Projects / On-site Service Projects
Level - 3 Process Areas (CMMI-DEV)
Description of Revision
Engineering Processes
ISO/IEC IEEE/EIA Software Life Cycle Processes Supporting Life Cycle Processes IEEE Supporting Processes.
EMIS 7307 Chapter 6.
HART Technologies Process Overview
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Portfolio, Programme and Project
Engineering Processes
DOE Review of the LCLS Project October 2006
{Project Name} Organizational Chart, Roles and Responsibilities
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003

2 NCSX Data Management Plan Peer Review Review Committee – Charlie Neumeyer, Chair – Bob Simmons, Cog – Wayne Reiersen, RLM – Judy Malsbury – Mike Williams – Larry Dudek – Brad Nelson

May 15, Review Objectives Have the appropriate systems been established for the implementation of an effective systems engineering management program for NCSX? Do these systems provide an appropriate level of detail, yet are sufficiently flexible to meet the tailored approach philosophy for NCSX,including the work being accomplished at ORNL? What plans are in place to train the NCSX personnel in the various systems engineering programs and systems (e.g., configuration management, interface control, document management, etc.)? Still work in Progress

May 15, Relationships to Other NCSX Plans and Procedures The NCSX NCSX Systems Engineering Management Plan (SEMP) is consistent with the requirements of the Project Execution Plan (PEP) and the Quality Assurance Plan (QAP) The SEMP is the top-level engineering plan and all other NCSX Engineering Project Plans support and expand the programs and systems outlined in the SEMP – Configuration Management Plan (CMP) – Interface Control Management Plan (ICMP) – Data Management Plan (DMP) – Document and Records Plan (DOC) – Pro/INTRALINK Users Guide

May 15, Systems Engineering (SE) is Central to the NCSX Engineering Processes Defines the processes for technical planning and control Defines the systems engineering processes Defines the engineering specialty integration processes

May 15, How Does the Systems Engineering Program Fit? ORNL has committed to follow NCSX plans and procedures Unless specifically modified or supeceded by NCSX-specific plans and procedures, NCSX is committed to following existing DOE and PPPL plans and procedures – In no instances are the NCSX plans and procedures in conflict or a dilution of the existing PPPL plans and procedures – Where NCSX is more rigorous, specific note will be made

May 15, Technical Program Planning and Control Work Breakdown Structure (WBS) provides the overall architecture for the systems engineering work – NCSX team structure has been aligned with the WBS NCSX Engineering Manager has overall responsibility for implementing the SE program on NCSX – Systems Engineering Support Manager and Design Integration Manager provide staff support to the Engineering Manager

May 15, Technical Program Planning and Control Four Project Engineers report directly to the Engineering Manager in the line organization – Stellarator Core (WBS 1) – Ancillary Systems (WBS 2-6) – Assembly Operations (WBS 7) – Operations (Testing, Ops and Maintenance Procedures, Prep for Ops)

May 15, Technical Program Planning and Control Systems Integration Team (SIT) – Consists of project personnel to facilitate integration of project work – Provides a forum for discussion of requirements interpretations, potential areas of risk, system level trade studies, coordination of processes, and resolution of issues – Intended to facilitate obtaining decisions through line management that are best for the project as a whole

May 15, Technical Program Planning and Control Work is organized Work is planned and costs and schedules are estimated and integrated – Use of SEML more rigorous during design process than existing PPPL procedures (e.g., WP as specified in ENG-032) – WP will govern any site work Work is authorized Work is tracked

May 15, Work Authorization Process

May 15, Cost Performance Reporting

May 15, NCSX Project Cycle

May 15, Requirements Documentation Hierarchy

May 15, Specification Types

May 15, Systems Engineering Processes Design Definition and Integration – Point where a design concept is created to satisfy a given set of requirements – Includes evaluation of alternatives – Eventually culminates in a final design for the entire NCSX Risk Management – Responsibility lies with NCSX line management – SIT will facilitate the identification of areas of risk, coordinating the development of risk mitigation plans, and the monitoring of performance against those plans

May 15, Systems Engineering Processes System Build – Starts with a concept and evolves in detail until the system is constructed and ready for integrated systems testing – Naturally an extension of the requirements analysis and design tasks for all components and subsystems – Intend to utilize construction techniques familiar to PPPL technicians System Test and Verification – Combination of inspection, demonstration, test, and analysis techniques

May 15, Systems Engineering Processes Configuration Management, Interface Control, and QA already subject of peer reviews Design Reviews – External design reviews conducted by DOE in support of Critical Decision milestones – Internal design reviews scheduled and planned in accordance with ENG-033 – usually at the subsystem level

May 15, Engineering Specialty Integration Reliability, Availability, and Maintainability (RAM) – RAM Plan will be prepared prior to final design review Value Engineering/Management (VE/VM) – Will apply to NCSX using a graded approach – Already have implemented several VE/VM studies

May 15, Engineering Specialty Integration Parts, Materials, and Process Standardization and Control – Plan to develop a Master Parts List and Vacuum Materials List – by time of PDR Manufacturability – Manufacturing, Inspection, and Test Plan (MITP) shall be produced for each configuration item

May 15, Engineering Specialty Integration Constructability – Under the leadership of the Assembly Operations Project Engineer, although all WBS Managers have this responsibility Space allocations Access for assembly Required assembly sequence Early identification and mitigation of constructability issues Design features to reduce construction costs Training – Safety and project-specific

May 15, Engineering Specialty Integration Technical Publications (O&M Manuals, etc.) – Electronic or hard copy data bases available (depending on material) ES&H – ISM policies and practices followed – ES&H review of technical documentation throughout the life of the project

May 15, SEML (PROC-004) The Systems Engineering Master Logic is the key planning document during the design phase – Defines the logic for design development and the necessary activities and deliverables for the Preliminary and Final Design Reviews – Used as guide when developing the WAFs Work Planning (WPs) shall be used for planning all field work, including on-site R&D during the design phases

May 15, SEML (PROC-004) This procedure lays out the process for – Identifying configuration items (CI) and for aligning the specifications, design reviews, and acquisition plans with that CI – Developing the SEML (generic example) for both Preliminary and Final Design Reviews

May 15,

May 15,

May 15,

May 15, Questions?