ATF2 Kiyoshi KUBO 2013.05.27. Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.

Slides:



Advertisements
Similar presentations
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Advertisements

July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
Y. Ohnishi / KEK KEKB-LER for ILC Damping Ring Study Simulation of low emittance lattice includes machine errors and optics corrections. Y. Ohnishi / KEK.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Status Towards Goal1 and Future Plans Glen White, SLAC 15 th ATF2 Project Meeting, KEK January
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Future ATF Plans beyond JFY2012 (From JFY2013) After this, we have to submit final proposal to KEK directorates in May The approval process at KEK.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Report ALCW Kiyoshi KUBO, for ATF2 Collaboration.
Main Linac Tolerances What do they mean? ILC-GDE meeting Beijing Kiyoshi Kubo 1.Introduction, review of old studies 2.Assumed “static” errors.
Plans for Laser-wire System Grahame Blair 21 st June 2005 Brief overview of UK LW programme ATF Extraction line LW Plans for this year ATF2.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Wakefield effect in ATF2 Kiyoshi Kubo
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
LAL-IHEP collaboration on the linear collider final focus & ATF2 prototype Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
ATF2 Status Background for the installation planning of Collimator
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ATF2 Status N.Terunuma, KEK
Intensity dependence of Beam size at IP and Wakefield in ATF2
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
ATF collaboration activity and 2016 beam schedule
Oversea collaborators
Coupling Correction at the Australian Synchrotron
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
First Look at Nonlinear Dynamics in the Electron Collider Ring
Junji Urakawa (KEK) for ATF International Collaboration
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
CLIC damping rings working plan towards the CDR
Proposal for a CESR Damping Ring Test Facility
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

ATF2 Kiyoshi KUBO

Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical emittance (  y  ~4 pm,  y  ~10 nm) – R&D of various instrumentations. ATF2 – Extended part of ATF designed for testing Final Focus of ILC (Local Chromatic Correction Scheme). – Goal 1: Small vertical beam size, ~ 40 nm – Goal 2: Stable beam position (with feedback), ~2 nm

Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode RF Gun Focal Point Accelerator Test Facility (ATF) at KEK

Goals of ATF2 project Goal1: Produce and Confirm Small Beam Size 37 nm (sigma) (Emittance 12 pm, beta* 0.1 mm) Single bunch Goal2: Produce and Confirm Stable Beam 2 nm RMS position jitter at focal point (As required in ILC Interaction Point) – Tail bunch(es) in multi-bunch beam with fast feedback.

Optics of ATF2 and ILC-BDS Figure from G.White, ATF2 Technical Review, Same Local Chromatic Correction Chromaticity ~ L*/  * ~ Momentum spread ~ 0.1% Different Beam energy 1.3GeV/250GeV Length 38m/700m Emittance 12pm/0.08pm  * 0.1mm/0.5mm Beam size 40nm/6nm Same method Similar difficulty

ATF2, International Collaboration Design, Construction and Operation CERN Germany DESY France IN2P3; LAL, LAPP, LLR UK Univ. of Oxford Royal Holloway Univ. of London STFC, Daresbury Univ. of Manchester Univ. of Liverpool Univ. College London Italy INFN, Frascati Spain IFIC-CSIC/UV Russia Tomsk Polytechnic Univ. Japan KEK Tohoku Univ. Univ. of Tokyo Waseda Univ. Nagoya Univ. Kyoto Univ. Hiroshima Univ. China IHEP Korea PAL KNU India RRCAT USA SLAC LBNL FNAL LLNL BNL Cornell Univ. Notre Dome Univ. ATF Main Institutes

International Contribution, Construction Concrete Base Stand (KEK) Magnet Mover (SLAC) Cavity BPM (KEK,PAL) Q magnet (KEK,SLAC,IHEP) BPM electronics (SLAC) (2008/6) Magnets (IHEP/SLAC/KEK) Magnet Power Supply (SLAC/KEK) Final Doublet Supports and Table (LAPP) Cavity BPM System (KNU / PAL / KEK / RHUL / SLAC) Beam Size Monitor (TokyoU./KEK)

Daily Operation Meeting in ATF Control Room S. Araki Dec. 2012

Measurement of Beam Size at Focal Point Shintake-monitor, Interference of two laser beams Scan interference fringe position. Measure modulation.  (IPBSM)

Increase Laser Crossing Angle As Electron Beam Size being Squeezed Sensitive beam size region With each crossing angle. Beam tuning with 2-8 deg.  30 deg.  174 deg.

Tuning knobs Corrected coupling Linear knobHorizontal move of sextupole magnets yy’ vertical move of sextupole magnets Ey x’y Non-linear knob Strength change of sextupole magnets x’yy’ Eyy’ Strength change of skew sextupole magnets xxy Exy EEy yy’y’ 5 sextupole magnets (on movers) and 4 skew-sextupole magnets

Example of tuning knob scan

Example of fringe scan

<70 nm beam size confirmed first in Dec. 2012, and continuously observed Beam size evaluated assuming no systematic error of the beam size monitor.

History of measured beam size Modulation With 30 deg. mode Modulation With 174 deg. mode Modulation With 2~8 deg. mode

Multi-pole field problem and cures Magnets have multi-pole field errors and affect beam size at focal point. Especially final h-focus magnet. Adopted optics of large beta-x at focal point (small beam size in the magnets and reduce effect of multi-pole field). Replaced final h-focus magnet (small aperture, large multi- pole field error) by a magnet with large aperture and small multi-pole field Add multi-pole field correctors (skew sextupoles)

Intensity dependence Small beam size was observed only at low intensity. Strong intensity dependence. Wakefield in the final focus line is suspected. Low energy compared with ILC Long bunch length High beta-function as same as ILC BDS Cannot exclude other effects: E.G., Intra-beam scattering in the damping ring (increase horizontal emittance and momentum spread) + non-linear coupling in ATF2 beam line.

Ref. Cav. Bellows Wakefield source on mover for study and compensation

Shield of Bellows Shields were inserted for most of bellows in high-beta region in May 2013.

Beam size (IPBSM modulation) vs. position of wakefield source on mover Cavity BPM Reference cavity Bellows without shield Effect of wakefield is still under investigation

Possible reason of larger size than design Non-linear field – Which cannot be corrected by our tuning knobs Imperfection of tuning knob set ? Higher order fields than 6-poles? (No corrector) Wake field Beam position jitter Systematic error of the beam size monitor All can have significant effects. Still under investigation.

Goal2: Beam position control in 2 nm by intra-pulse feedback BPM resolution must be 2 nm, much better than required in ILC (~ micron). ILC intra-pulse Feedback e+ e- ATF2 intra-pulse Feedback (FONT) Fig. by P.Burrows ATF2 Review 2013 IP BPM at Focal Point Kicker Amplifier Processor Electronics 3 bunches/pulse 150 ns spacing or 2 bunches/pulse 230 ns spacing Diffracted beam

Feedback Tested and Demonstrated (BPM resolution ~ micron) Feedback at Focal Point is being prepared (BPM resolution ~ nm) FONT, Burrows 2013 ATF2 Review ATF2 Intra-pulse orbit feedback Damping ring

Summary ATF2 Goal 1 (small beam size) – Achieved and continuously observed < 70 nm vertical size beam at low intensity. – For smaller size, and understanding intensity dependence, we are studying Effect of higher order multi-pole field Effect of wakefiled Beam position jitter Systematic error of beam size monitor ATF2 Goal 2 (stable beam) – Intra-pulse feedback demonstrated in middle of beam line. – Test of stabilization at focal point is being prepared and starting in this autumn.

ATF/ATF2 Plan Continued studies for making small beam size (Goal 1) – Program for even smaller beam size proposed (~CLIC) Studies for stable beam as main program of ATF (Goal 2) R&D on critical instrumentation and accelerator physics for e+e- colliders. Other proposals – R&D for gamma-gamma collider – High field physics –,,,

ATF Control Room