SELECTING TASK OR OTHER OPTIONS Module 7 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."

Slides:



Advertisements
Similar presentations
Unit III Module 3 - On Condition Task
Advertisements

DATA CONSIDERATIONS Module 3 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Unit III Module 6 - Developing Age Exploration Tasks
Unit I Module 1 - Introduction to RCM
PROGRAM AND PROJECT MANAGEMENT
STEP 1 Develop/update RCM Program Plan STEP 2 New Equipment Design Recommended STEP 2B Complete Level 2 Breakdown STEP 4 Complete Levels 3 and 4 Breakdowns.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
Decision Making, Learning, Creativity, and Entrepreneurship
" Copyright 2002, Information Spectrum, Inc. All Rights Reserved." RCM DECISION LOGIC Module 5 UNIT II RCM PROCESS.
Overview of Key Rule Features
McGraw-Hill Technology Education © 2006 by the McGraw-Hill Companies, Inc. All rights reserved CHAPTER SYSTEMS ANALYSIS AND DESIGN McGraw-Hill/Irwin.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
System Implementation
Unit III Module 4 - Hard Time Task
Auditing A Risk-Based Approach To Conducting A Quality Audit
6-1 Managerial Decision Making and Information Technology Copyright © 2006 by South-Western, a division of Thomson Learning. All rights reserved. Chapter.
Information Technology Project Management
HARDWARE PARTITIONING Module 3 UNIT II RCM PROCESS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Information Technology Project Management by Jack T. Marchewka Power Point Slides by Jack T. Marchewka, Northern Illinois University Copyright 2006 John.
Introduction ► This slide deck provides a suggested framework for the financial evaluation of an investment project. When evaluating any such project,
Chapter 10.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill Technology Education Logic and Problem Solving Advanced Computer Programming.
Condor Technology Solutions, Inc. Grace RFTS Application Extension Phase.
Problem Solving Professor: Dr. Miguel Alonso Jr..
Unit I Module 2 - NAVAIR RCM Policy and Organization
Definitions, Goals and Objectives
From Research Prototype to Production
Job Offer/Continuing Education Evaluation Labor CostsHoursRate($10.30/Hr) Luke195 $ 2, Stephanie175 $ 1, Matt185 $ 1, Randy205 $ 2,
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Chapter 5 Internal Control over Financial Reporting
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
TASK PACKAGING Module 1 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
MODULE 1: INTRODUCTION. OBJECTIVES Explain the purpose and use of the Communication Model and the Quick Access Prefire Plan in tactical operations at.
Common Activities Activities and Tasks in the WBS.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
1 Module 8 UNIT III " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." HOW TO PERFORM RCM ANALYTICAL METHODS.
David Baglee Dr. David Baglee. School of Computing & Technology E: T: Reliability Centred Maintenance.
UNIT II RCM PROCESS Module 2 PLANNING AND PREPARATION " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
SUSTAINING THE ANALYSIS Module 2 UNIT IV ADDITIONAL TOPICS " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Ch 4 - Learning Objectives Scope Management You should be able to: n Discuss the relationship between scope and project failure n Describe how strategic.
UNIT III HOW TO PERFORM RCM Module 1 RCM SOFTWARE REVIEW " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Teaching Students with Special Needs in General Education Classrooms, 8e Lewis/Doorlag ISBN: © 2011 Pearson Education, Inc. All rights reserved.
SERVICING AND LUBRICATION TASKS Module 2 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Unit II Module 1 - RCM Process Overview
ON CONDITION TASK Module 3 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
1 Fundamentals of RCM Analysis R ELIABILITY C ENTERED M AINTENANCE.
Problem Solving Skills
Information Technology Project Management – Fourth Edition By Jack T. Marchewka Northern Illinois University Power Point Slides by Gerald DeHondt Grand.
FAILURE FINDING TASK Module 5 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
Managing Company Tactical Objectives Tactics Module 1: Introduction.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
Definitions, Goals and Objectives Embry-Riddle Aeronautical University Chapter 3.
Data Analytics & Advisory Services Ann C. Dzuranin, PhD Associate Professor, Accountancy Northern Illinois University 2016 Deloitte Foundation/FSA Faculty.
Continuously Pushing the Limits of Innovation, Technology & Conventional Thinking For Official Use Only RCM Theory and Concepts Workshop RCM Theory and.
Continuously Pushing the Limits of Innovation, Technology & Conventional Thinking For Official Use Only RCM Theory and Concepts Workshop RCM Theory and.
Failure Modes, Effects and Criticality Analysis
Stracener_EMIS 7305/5305_Spr08_ Reliability Centered Maintenance Analysis (RCMA) Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering.
FAILURE MODE EFFECTIVE ANALYSIS. Introduction Failure Mode Effect Analysis is an analytical technique that goes in for combining Technology and Experience.
ON “SOFTWARE ENGINEERING” SUBJECT TOPIC “RISK ANALYSIS AND MANAGEMENT” MASTER OF COMPUTER APPLICATION (5th Semester) Presented by: ANOOP GANGWAR SRMSCET,
1 ME Spring 2015 Systems Engineering, Part II Session 8 5 February 2015 Mr. Larry Hopp, CPL © Copyright 2013.
Internal Control Chapter 7. McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 7-2 Summary of Internal Control Definition.
Capital Planning & Risk Management
RCM Theory and Concepts Workshop Module 1 – Introduction
Causal Analysis & Resolution (CAR) Support Category
Submission Title: [Kodak - High Rate PHY Proposal]
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Information Technology Project Management
Facilities Planning and Design Course code:
Unit I Module 3 - RCM Terminology and Concepts
Presentation transcript:

SELECTING TASK OR OTHER OPTIONS Module 7 UNIT III HOW TO PERFORM RCM " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."

Module Preview: IntroductionIntroduction Introduction Introduction Choosing the Best Solution Choosing the Best Solution Review and Summary Review and Summary HOW TO PERFORM RCM

Module Objective: IntroductionIntroduction This module will provide information on selecting preventive maintenance tasks for implementation after applicable tasks have been identified: 1. Introduce methods of performing PM task cost analysis 2. Identify methods to evaluate the operational consequences of various PM tasks 3. Describe the process used to select appropriate PM tasks for implementation. HOW TO PERFORM RCM

1. Identify Team and responsibilities 4. Identify and document Review Process 2. Identify analysis items 5. Orientation/Training 3. Prioritize Items 6. Ground Rules and Assumptions PLANNING AND PREPARATION ANALYSIS RCM Process Analysis Approac h/ RCM Plan Analysis MaintenanceRequirementsMaintenanceRequirements MaintenanceProgramMaintenanceProgram DataData 1.Equipment Kick-off Meeting 2.Initial Data Gathering 3.Hardware Partition 4.Function 5.Functional Failure 6.Failure Mode 7.Failure Effects 8.Failure Consequences 9.Task Evaluation 10.Task Selection 1.Package Maintenance Task 2.Implement Other Actions Results IMPLEMENT RESULTS 1.Emergent Issues 2.Age Exploration 3.Hardware Changes 4.Trend/degrader analysis 5.Document Reviews SUSTAIN Choosing Best Solution

Options:Options: Best solution for reducing consequences of failure to an acceptable level may be achieved by: Performing one of the five PM tasks Performing one of the five PM tasks Perform combination of two or more tasks Perform combination of two or more tasks Allow failure mode to occur Allow failure mode to occur Take some other action Take some other action HOW TO PERFORM RCM

Basis for Decisions: Choosing Best Solution At this point in analysis each option has already been shown to reduce the consequences of failure to an acceptable level At this point in analysis each option has already been shown to reduce the consequences of failure to an acceptable level A solution that contains any of these options will meet the organization’s criteria A solution that contains any of these options will meet the organization’s criteria Safety and mission were addressed in the task evaluation Safety and mission were addressed in the task evaluation HOW TO PERFORM RCM

Considerations:Considerations: Choosing Best Solution Operator/Maintainer opinion: Buy-in Operator/Maintainer opinion: Buy-in Risks: New technology, etc. Risks: New technology, etc. Data Sensitivity and accuracy Data Sensitivity and accuracy HOW TO PERFORM RCM

Basis for Decisions: Choosing Best Solution The best solution at this point will be determined by evaluating: The cost of executing that solution and…. The cost of executing that solution and…. The consequences the solution will have on the organization’s operations The consequences the solution will have on the organization’s operations HOW TO PERFORM RCM

There are several methods of determining cost Develop cost/availability comparison methods Develop cost/availability comparison methods IRCMS (contains cost equations) IRCMS (contains cost equations) Look at cost of similar existing tasks Look at cost of similar existing tasks Different Organizations may use different equations or methods Cost:Cost: Choosing Best Solution HOW TO PERFORM RCM

Choosing Best Solution Operational:Operational: A less expensive option may not be best solution when operational factors are considered A less expensive option may not be best solution when operational factors are considered A less expensive option may require more down time or administrative resources A less expensive option may require more down time or administrative resources The best overall option should be chosen The best overall option should be chosen Decision may be subjective Decision may be subjective HOW TO PERFORM RCM

Review and Summary IntroductionIntroduction Choosing the best Solution Basis for Decisions – Basis for Decisions – Cost – Operational Consequences 3 Fly-ins Module Objective HOW TO PERFORM RCM

End of Module up next…….. Analytical Methods End of Module up next…….. Analytical Methods