By: Derk-Jan de Grood, Collis Date: 3rd Test Management Summit 2009, London Result-driven testing Business alignment in order to show our added value.

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Strategic Value of the HR Function Presentation by
UNSW Strategic Educational Development Grants
1 The UK Debt Management Office – Borrowing on behalf of Government Mike Suffield – UK National Audit Office INTOSAI Public Debt Committee Meeting Lisbon,
It’s Time to Talk About Risk and Control
The High Cost of Low Performance PMIs Pulse of the Profession Presented by Rene Ramirez, PE, PMP.
IFRC Shelter Technical Training Yverdon-Les-Bains, Switzerland | 3 rd – 7 th March 2008 This session describes the benefits of developing a strategic plan.
OECD STUDY ON GOOD PUBLIC GOVERNANCE: THE ROLE OF SAIS Ishat Reza Portfolio Manager (Audit and Internal Control), OECD Meeting of the INTOSAI Subcommittee.
Lynn Stockley & Associates Introduction to Behavioural Change Lynn Stockley.
Unit Slides by UK Versity.  Unit aims:  This unit aims to help the learner with an opportunity to develop their project management and research skills.
Marketing research and Marketing Planning at Tesco.
Copyright © 2014 ASTQB Presented by Rex Black, CTAL Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further.
The Banking Sector 2005 / 2006 Skills Audit – The Process, Results and Possible Debate.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
Opportunities & Implications for Turkish Organisations & Projects
MANAGING STRATEGY INTRODUCTION TO STRATEGIC MANAGEMENT.
Training and Learning Needs Analysis (TLNA) a tool to promote effective workplace learning & development Helen Mason, Project Worker, Unionlearn Representing.
Developing an IS/IT Strategy
Shelter Training 08b – Belgium, 16 th –18 th November, 2008 based on content developed by p This session describes the benefits of developing a strategic.
ISO 9000 and Total Quality: The Relationship
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Counseling Practice in Schools The Transformed School Counselor Chapter 3 ©2012 Cengage Learning. These materials are designed for classroom use and can.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
University of Palestine software engineering department Testing of Software Systems Testing throughout the software life cycle instructor: Tasneem Darwish.
Unit 18: The Business of Diving The diving industry Marketing Prospecting and recruiting Customer/student follow-up Fundamentals of retailing Budgeting,
P4.
1 February 2005 Briefing Sessions Draft Regulations Using Water for Recreational Purposes.
TEN-T Experts Briefing, March Annual Call Award Criteria.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Slide 1. 1 Exploring Corporate Strategy, Seventh Edition, © Pearson Education Ltd 2005 Exploring Corporate Strategy 7 th Edition Part I Introduction Gerry.
Agriculture today and tomorrow: The need for vision and visibility - The view of the EU Court of Auditors -
NEUROGEN CORPORATION Alliance Management: View from the Smaller Side of the Alliance Thomas A. Pitler, Ph.D. VP Business Development.
The common structure and ISO 9001:2015 additions
Or How to Gain and Sustain a Competitive Advantage for Your Sales Team Key’s to Consistently High Performing Sales Organizations © by David R. Barnes Jr.
Fundamentals of Governance: Parliament and Government Understanding and Demonstrating Assessment Criteria Facilitator: Tony Cash.
33 3. IS Planning Issues Scope of IS planning Barriers in IS planning Overview of IS planning Inputs to IS planning Process of IS planning Outputs from.
AgilTech, LLC RETURN-ON-INVESTMENT ROI In the Context of ISO 9000 INTERNATIONAL STANDARDS REQUIREMENTS AND GUIDANCE JOM / Prepared By Dr. J.O.
Teaching slides Chapter 2. Chapter 2 Software Engineering Methodologies Introduction Why a methodology? Agile methodologies Waterfall model Rational Unified.
Project Management Institute, Northeast Florida Chapter Learning Materials PMI PMBOK(R) Guide A Guide to the Project Management Body of Knowledge Rita.
Develop a Marketing Plan.  Your marketing plan gives you a guide on which to base decisions and ensures that everyone is working together to achieve.
Communication and effective presentations Module 6 INSTRUCTIONS This template is designed for projected presentations and printed handouts only. The template.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Grant Timms Senior Examiner Assignment brief December 2013 / March 2014 Marketing Leadership & Planning.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
COBIT. The Control Objectives for Information and related Technology (COBIT) A set of best practices (framework) for information technology (IT) management.
CMMI Certification - By Global Certification Consultancy.
Valorisation: getting added value from projects Elli Georgiadou Middlesex University School of Science and Technology.
12-CRS-0106 REVISED 8 FEB 2013 EDM (Evaluate, Direct, and Monitor) CDG4I3 / Audit Sistem Informasi Angelina Prima K | Gede Ary W. KK SIDE
Module 9: Transition and Exit Strategy ASEAN Training of Trainers (TOT) on Disaster Recovery.
Digital Marketing Strategy
Sample Fit-Gap Kick-off
GKR 2113: INTRODUCTION TO DESIGN PROCESS
Steve Barfoot, President Advantage International Registrar, Inc.
LO1 - Analyse the impact and influence which the macro environment has on an organization and its business strategies 1. P1 Applying appropriate frameworks,
Human Resource Management
Fundamentals of Ethics
Audit & Risk Management
Chapter 16 Implementing HR Strategy: High-Performance Work Systems
Assurance: the Evolution of Test Management?
Following Up on Internal Audit Reports Workshop on IIA Standard 2500
Teaching slides Chapter 1.
Internal Audit Strategy Survey Results & Discussion
Introducing ISTQB Agile Foundation Extending the ISTQB Program’s Support Further Presented by Rex Black, CTAL Copyright © 2014 ASTQB 1.
Presentation to the INTOSAI Working Group on IT Audit Systems assurance and data analytics for continued audit quality and improved efficiency of audits.
Human Resource Management
Building a talent strategy from your company’s strategic plan
Some Practical Considerations for Systems Engineers in a Lean-Agile Airborne Weapons System Program June 12, 2018 Ken Garlington.
Developing a shelter strategy
Rural Partnerships between Small Farmers and Private Sector
Internal Audit’s Role in Preventing Fraud and Corruption
Presentation transcript:

By: Derk-Jan de Grood, Collis Date: 3rd Test Management Summit 2009, London Result-driven testing Business alignment in order to show our added value

2 Aim of this session?  Introduce result-driven testing  Explain why I think it has relevance  Learn from each other how we can implement it

3 Rational maturity Maturity Information Low High Rational Emotional Knowledge Experience Maturity  Test policy  Test strategy  Test plan  Test design Techniques  Test scenario’s  Intake reports  Entry criteria  Audit reports  Etc.. Where do we go from here ? Where do we go from here ?

4 Mind-set business manager New Markets Turn over Market share Increasing efficiency Legal obligation Politics New Markets Turn over Market share Increasing efficiency Legal obligation Politics IT-Project !!

5 Result driven testing Know and understand the anticipated result. Carry out only those activities that contribute to the intended result, or give insight to the measurement in which this result has been achieved. Inform stakeholders on time with coherent information.

6 Success factor  Not the method, but the way the method is applied, determines the success of the project  How to ensure that the method is applied in an effective manner?

7 Test principles

Test process Result Review (intake Test base) Test design Setting up environment Test execution Release advice Test plan & strategy WishRequiremen ts DesignCodin g TestingDeployme nt The number of tester using a waterfall model is the same as the number using agile, with the V-model the most popular. [EuroSTAR survey 2007]

9 Test Risk Analysis A good testing story helps selling both the Exploratory testing as the traditional tester to bridge towards stakeholders.

10 For the benefit of your boss I Know - the system is ‘fit for purpose‘ - what issues remain unresolved - that these will be dealt with adequately Take away uncertainties Ensure trust in technology Take away uncertainties Ensure trust in technology

11 For your own benefit

12 Summary Maturity Information Low High Rational Emotional Knowledge Experience Maturity For maximum added value combine:  Result driven attitude  Test experience & knowledge  Test method