MARsite kickoff meeting December 19-20, 2012, Istanbul INGV contribution to WP5 Tasks 2 & 4 Alessio Piatanesi.

Slides:



Advertisements
Similar presentations
Time Domain Moment Tensor & Finite Fault Solution for the Aquila Earthquake (2009/04/06 01:32) Elisa Tinti and Laura Scognamiglio Preliminary results,
Advertisements

Time Domain Moment Tensor & Finite Fault Solution for the Aquila Earthquake (2009/04/06 01:32) Laura Scognamiglio and Elisa Tinti Preliminary results.
Dmitry A. Storchak & Domenico Di Giacomo Prof. Ambraseys contribution to the ISC Event Bibliography March 19, 2014Ambraseys.
Generation of the 2004 Sumatra-Andaman Tsunami WHIO, 30 Oct., 2006.
Vertical Crustal Motion in the North Pacific and Implications for Tide Gauge Records and Sea Level Rise Jeff Freymueller and Christopher F. Larsen Geophysical.
10/09/2007CIG/SPICE/IRIS/USAF1 Broadband Ground Motion Simulations for a Mw 7.8 Southern San Andreas Earthquake: ShakeOut Robert W. Graves (URS Corporation)
MARSITE - ISTANBUL. MARSITE started on November 1 st, It is a three-year project. MARsite has been funded for about 6M€. The first months are dedicated,
Ground motion simulations and site effect estimation for Istanbul, Turkey Mathilde Bøttger Sørensen 1, Nelson Pulido 2, Sylvette Bonnefoy-Claudet 3, Kuvvet.
Prague, March 18, 2005Antonio Emolo1 Seismic Hazard Assessment for a Characteristic Earthquake Scenario: Integrating Probabilistic and Deterministic Approaches.
Numerical simulation of seismic cycles at a subduction zone with a laboratory-derived friction law Naoyuki Kato (1), Kazuro Hirahara (2), and Mikio Iizuka.
EPOS use case: High-resolution seismic tomography of Italy
Tom Heaton Caltech Geophysics and Civil Engineering.
Scheduling with Optimized Communication for Time-Triggered Embedded Systems Slide 1 Scheduling with Optimized Communication for Time-Triggered Embedded.
Modeling Emerging Magnetic Flux W.P. Abbett, G.H. Fisher & Y. Fan.
11/02/2007PEER-SCEC Simulation Workshop1 NUMERICAL GROUND MOTION SIMULATIONS: ASSUMPTIONS, VERIFICATION AND VALIDATION Earthquake Source Velocity Structure.
2009 AGU Fall Meeting S33D. Research and Development in Nuclear Explosion Monitoring II Implementation of tsunami early warning using earthquake rupture.
Earthquakes Susan Bilek Associate Professor of Geophysics New Mexico Tech How to figure out the who, what, where, why… (or the location, size, type)
Paleoseismic and Geologic Data for Earthquake Simulations Lisa B. Grant and Miryha M. Gould.
WARM UP BIKE SAFETY: You live near a mountain bike trail. You can rent a mountain bike a safety helmet for $10 an hour. If you have your own helmet, the.
Antonella Cirella 1, Paul Spudich 2 1 INGV, Rome, Italy 2 USGS, Menlo Park, CA Aleatory and Epistemic Uncertainties in Interpolated Ground Motions Example.
Comparison of Recorded and Simulated Ground Motions Presented by: Emel Seyhan, PhD Student University of California, Los Angeles Collaborators: Lisa M.
New earthquake category Nature 447, (3 May 2007) | doi: /nature05780; Received 8 December 2006; Accepted 26 March A scaling law for slow.
MARsite kickoff meeting December 19-20, 2012, Istanbul WP5 - TASK 2 Near real-time determination of the earthquake finite-fault source parameters and models,
FEASIBILITY STUDY OF A REGIONAL EEW SYSTEM FOR THE EASTERN CARIBBEAN REGION ZUCCOLO Elisa, SALAZAR Walter, DI SARNO Luigi, FARRELL Anthony, GIBBS Tony,
Real-time application of Coulomb stress modelling and related issues By Suleyman S. Nalbant, Sandy Steacy & John McCloskey Geophysics Research Group, University.
Tsunami-prone Areas Japan, 2011 Sumatra, 2004 Mentawai, 2010
The global seismic energy to moment ratio: a tool for basic research and real-time identification of “Tsunami Earthquakes” Jaime Andres Convers Dr. Andrew.
FFCUL, PORTUGALBologna Oct 2006 NEAREST Coordinator: Maria Ana V Baptista NEAREST PARTNER - FFCUL PORTUGAL.
EARLY-EST EArthquake Rapid Location sYstem with EStimation of Tsunamigenesis Alberto Michelini and Anthony Lomax.
Large Earthquake Rupture Imaging Using the Back-Projection Technique and Improving the Array Response Function Student Researcher: Kevin Kwong Thesis Advisor:
Tide gauge stations: requirements, status, and issues Mark Merrifield University of Hawaii Sea Level Center.
NEAREST 2nd year Meet ing – Berlim 8 -9oct 08 WP7 Modelling of tsunami impact in SW Portugal Berlim 8-9 October 2008 NEAREST FFCUL Rachid Omira Maria Ana.
SHARE WP 3 Task 3.3 European crustal strain-rates INGV, NORSAR Salvatore Barba Istituto Nazionale di Geofisica e Vulcanologia, Rome.
Complex earthquake directivity during the 2009 L’ Aquila mainshock Tinti E., Scognamiglio L., Cirella A., Cocco M., and A. Piatanesi Istituto Nazionale.
Zadonina E.O. (1), Caldeira B. (1,2), Bezzeghoud M. (1,2), Borges J.F. (1,2) (1) Centro de Geofísica de Évora (2) Departamento de Física, Universidade.
Disputable non-DC components of several strong earthquakes Petra Adamová Jan Šílený.
SCEC Workshop on Earthquake Ground Motion Simulation and Validation Development of an Integrated Ground Motion Simulation Validation Program.
Massimo Cocco INGV Rome INGV The First EarthScope Institute on the Spectrum of Fault Slip Behaviors October 11-14, 2010, Portland, Oregon.
Large Earthquake Rapid Finite Rupture Model Products Thorne Lay (UCSC) USGS/IRIS/NSF International Workshop on the Utilization of Seismographic Networks.
High Resolution Finite Fault Inversions for M>4.8 Earthquakes in the 2012 Brawley Swarm Shengji Wei Acknowledgement Don Helmberger (Caltech) Rob Graves.
Sources and scenarios for tsunami hazard assessment in the Mediterranean A very preliminary view.
CISN: Draft Plans for Funding Sources: OES/FEMA/ANSS/Others CISN-PMG Sacramento 10/19/2004.
A1 A2 Standard scenario Ground motions are calculated for a standard scenario earthquake. Afterwards, source parameters are varied one by one, and the.
Models for Fault Behavior
Antonella Cirella, Alessio Piatanesi, Elisa Tinti, Massimo Cocco Ground Motion and Source Process of the 6 th April 2009 L’Aquila, central Italy, Earthquake.
Present / introduce / motivate After Introduction to the topic
Ground motion simulations in the Pollino region (Southern Italy) for Mw 6.4 scenario events.
WP8 - From hazard to risk assessment LIST OF PARTICIPANTS.
GROUND MOTION SIMULATIONS AT RAPID RESPONSE SITES IN ISTANBUL, TURKEY Mathilde Bøttger Sørensen 1, Nelson Pulido 2, Anibal Ojeda 3, Kuvvet Atakan 1, Mustafa.
California Institute of Technology
Earthquake source modelling by second degree moment tensors Petra Adamová Jan Šílený Geophysical Institute, Academy of Sciences, Prague, Czech Republic.
SUSHI II Long-term stress modelling: Implications for large earthquake forecasting Suleyman S. Nalbant, John McCloskey, Shane Murphy, Nuno Simao and Tony.
2002/05/07ACES Workshop Spatio-temporal slip distribution around the Japanese Islands deduced from Geodetic Data Takeshi Sagiya Geographical Survey Institute.
GeoFEM Kinematic Earthquake Cycle Modeling in the Japanese Islands Hirahara, K. (1), H. Suito (1), M. Hyodo (1) M. Iizuka (2) and H. Okuda (3) (1) Nagoya.
Shaking and Flooding by the Tohoku-Oki earthquake Shengji Wei*, Rob Graves**, Don Helmberger*, Jean-Philippe Avouac* and Junle Jiang* * Seismological Lab,
Tsunami. What is a Tsunami December 26th Tsunami hits the Indian Ocean. December 26th Tsunami hits the Indian Ocean. Indonesia, Sri Lanka,
A brief introduction to NERA – NA3 work package ‘Networking accelerometric networks and strong- motion data users’ Sinan Akkar On behalf of entire NERA-NA3.
Jiancang Zhuang Inst. Statist. Math. Detecting spatial variations of earthquake clustering parameters via maximum weighted likelihood.
On constraining dynamic parameters from finite-source rupture models of past earthquakes Mathieu Causse (ISTerre) Luis Dalguer (ETHZ) and Martin Mai (KAUST)
Cabled systems for near-field tsunami early warning: An observation system simulation experiment (OSSE) offshore Portugal A. Babeyko1, M. Nosov2 and.
Earthquake & Tsunami Hazard
Motion of Bering Plate? Jeff Freymueller.
NEAREST FFCUL WP7 Modelling of tsunami impact in SW Portugal
Kinematic Modeling of the Denali Earthquake
Douglas Dreger, Gabriel Hurtado, and Anil Chopra
Douglas Dreger, Gabriel Hurtado, and Anil Chopra
SICHUAN EARTHQUAKE May 12, 2008
MHD Simulation of Plasmoid-Induced-Reconnection in Solar Flares
Real-Time Feedback Control System for ADITYA-U Tokamak Plasma Position Stabilisation ROHIT et al. Development of transfer function models for the fast.
Presentation transcript:

MARsite kickoff meeting December 19-20, 2012, Istanbul INGV contribution to WP5 Tasks 2 & 4 Alessio Piatanesi

Personnel working in the group Contributors: - Alessio Piatanesi, researcher - Antonella Cirella, researcher - Elisa Tinti, researcher - Laura Scognamiglio, researcher - Stefano Lorito, researcher - Fabrizio Romano, researcher

Main involvements: Tasks Task Near real-time determination of the earthquake finite-fault source parameters and models, based on GPS and strong motion data Task Creating a scenario database for earthquake triggered tsunamis and Testing of the routine with well-studied events

Main involvements: Deliverables D5.3 - Performance assessment of finite-fault inversion codes in the Marmara configuration Delivery date: 30 D5.4 - Near real-time estimation of most relevant earthquake source parameters Delivery date: 30 D5.7 - Tectonic origin tsunami scenario database for the Marmara region Delivery date: 36

Specific contributions: Task 5.2 “Two finite-fault inversion programs will be developed, tested and compared. The first code implements a linear technique to invert strong motion and GPS data: it is very fast and produces a model of the earthquake rupture process in term of heterogeneous slip distribution, uniform rise time and constant rupture velocity.” CPU TIME: 10s to 2hours depending on how many constant rise times and rupture velocities are tested Scognamiglio et al. 2010, SRL

Specific contributions: Task 5.2 “Two finite-fault inversion programs will be developed, tested and compared. The second code is based on a simulated annealing technique: it is slower than the former, but it may handle very complicated rupture model with heterogeneous slip, rise time and rupture velocity, other than several kind of source time function.” CPU TIME: about 15 hours Cirella et al., GRL, 2009

Specific contributions: Task 5.4 “The goal of the present task is to build up a detailed scenario database for all possible earthquakes in the Marmara Sea with a tsunamigenic potential.” Tsunami scenario in the Marmara sea