WMS Investigation: Travel Time Variability with Method, Area, and Slope Ryan Murdock May 1, 2001.

Slides:



Advertisements
Similar presentations
Runoff Analysis of the Watersheds “El Arroyo El Chilito” and “La Presa Bernardez” Guadalupe, Zacatecas, Mexico Nathan Lowe, Shawn Stanley and Jeffery Crump.
Advertisements

Application of the FEWS Stream Flow (SF) Model to the Limpopo Basin, Mozambique Final Report Tanya Hoogerwerf.
Standard watershed and stream delineation recipe - Vector stream (ex. NHD data) fusion into DEM raster (burning in) - Sink removal - Flow direction - Flow.
53rd ANNUAL MEETING OF THE ARIZONA-NEVADA ACADEMY OF SCIENCE UNIVERSITY OF ARIZONA TUCSON, AZ APRIL 4, rd ANNUAL MEETING OF THE ARIZONA-NEVADA ACADEMY.
CURVE NO. DEVELOPMENT STEP 8 Soils data, land use data, watershed data, and CN lookup table are used to develop curve numbers for use in the SCS Curve.
PrePro2004: Comparison with Standard Hydrologic Modeling Procedures Rebecca Riggs April 29, 2005.
N ON- P OINT S OURCE P OLLUTION Analysis and Prediction in ArcView David Munn Texas A&M University/Dept. of Civil Engineering CVEN 689 Applications of.
Application of HEC- HMS for Hydrologic Studies Texas A&M University Department of Civil Engineering CVEN689 – Applications of GIS in CE Instructor: Dr.
By Jennifer VerWest. Differences between Flat and Average/Steep Terrain Flat Terrain Steep/Average Terrain.
CVEN 689 Instructor: Dr. Francisco Olivera Estimating Salt Concentration at Ungaged Locations from Parameters derived using GIS Ganesh Krishnamurthy Water.
CRWR-PrePro Francisco “Paco” Olivera, Ph.D. Center for Research in Water Resources University of Texas at Austin Francisco Olivera 1998 ESRI User Conference.
Processing Geospatial Data with HEC-GeoRAS 3.1
Flood Analysis of Scioto River Using HEC-RAS/GIS Converting HEC-2 Data for HEC-RAS /ArcView GIS Analysis and Inundation Mapping (A pilot using Big Darby.
Non-Point Source Pollutant Modeling Analysis and Prediction David Munn.
Hydrological Modeling FISH 513 April 10, Overview: What is wrong with simple statistical regressions of hydrologic response on impervious area?
Texas A&M University Department of Civil Engineering Cven689 – CE Applications of GIS Instructor: Dr. Francisco Olivera Logan Burton April 29, 2003 Application.
Urban Storm-Water Management Plan Utilizing Arc View and HEC-HMS College Station, Texas Kara Corcoran CVEN 689.
“Flood monitoring and mapping for Emergency Response in San Antonio-Texas” Part I by Silvana Alcoz Source photo Term.
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
DEM’s, Watershed and Stream Network Delineation DEM Data Sources Study Area in West Austin with a USGS 30m DEM from a 1:24,000 scale map Eight direction.
Time of Travel. American Water Charleston intake on the Elk River Charleston 1,000, ,984 = 1880 seconds or 31 minutes.
ACWQ Austin Canopy & Water Quality Progress Report: Austin Tree-Canopy Resource, Phase II Spring 2012, Geography 4427, Texas State University April 2,
by David M. Beekman and Vito A. Cimino
HEC-HMS Runoff Computation.
Watershed delineation and data preparation for groundwater modeling using GIS in the Savannah River Site GIS term project presentation November 25, 2003.
DIGITAL ELEVATION MODELING GEOG 421: DR. SHUNFU HU, SIUE Project One Steve Klaas Fall 2013.
Time of Concentration and Lag Time in WMS Ryan Murdock CE 394K.2.
Section 5. New England SPARROW River Reach Network Assembling the stream network Generation of reach catchments Estimation of Stream-flow and velocity.
The Effects of Vegetation Loss on the Two Elk Creek Watershed as a Result of the Proposed Vail Category III Ski Area Development CE 394 K.2 By Dave Anderson.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
1 Integrating Water Resources Engineering and Geographic Information Systems (GIS) National Weather Service NWSRFS International Workshop October 21-23,
Long Valley Creek: A Rainfall-Runoff Modeling Story Rob Thompson Hydrologist U.S. Army Corps of Engineers Sacramento District
Building an OpenNSPECT Database for Your Watershed Shan Burkhalter and Dave Eslinger National Oceanic and Atmospheric Administration (NOAA) Office for.
CE 3354 Engineering Hydrology Lecture 9: Rational Equation Method Introduction to HEC-HMS.
ARC GIS IN THE SANTA RIVER BASIN IN PERU GIS in Water Resources Fall 2006 Professor: Dr. David Maidment Presented by Presented by Eusebio Ingol.
The Effect of Urbanization to the surface-water runoff The comparison between the urbanized and undeveloped zones.
Determining Watershed Parameters for Water Rights in the Cypress River Basin By: Hema Gopalan GIS in Water Resources (C E 394K) Fall 2001.
General Introduction. Developed by USGS Freely available via Internet
The Effects of Impervious Cover on a Hydrologic System BRUSHY CREEK WATERSHED By Ruth Haberman.
HEC-PrePro Workshop GIS Research Group Center for Research in Water Resources University of Texas at Austin Francisco Olivera HEC-PrePro v. 2.0 Workshop.
Water Availability Modeling in the State of Texas CE 394 K.2 - Surface Water Hydrology University of Texas at Austin David Mason.
1 Byung Sik, Kim Kangwon National University Advanced Hydrology and Water Resources Management.
Sanitary Engineering Lecture 4
BUILDING AND RUNNING THE HYDROLOGICAL MODEL
Graduate Students, CEE-6190
watershed analysis of Oak Ridge
Introduction to GIS David R. Maidment
Innovation Through GIS
Week 1.
Digital model for estimation of flash floods using GIS
Modified Rational Method for Texas Watersheds
Modified Rational Method for Texas Watersheds
DES 606 : Watershed Modeling with HEC-HMS
Lauren Schneider CE394K.2 Surface Water Hydrology Dr. Maidment 4/28/05
Nathan Lowe, Shawn Stanley and Jeffery Crump
Cristina Nelson, Term Project, CEE 6440, Fall 2007
Lecture 22: Using ArcToolbox Tools in Python
GIS and SMS in Numerical Modeling of Open Channel Flow
GIS FOR HYDROLOGIC DATA DEVELOPMENT FOR DESIGN OF HIGHWAY DRAINAGE FACILITIES by Francisco Olivera and David Maidment Center for Research in Water Resources.
Modeling a Spatially Distributed Water Balance Using TOPMODEL
Hydrologic Analysis of the Hyrum Reservoir watershed
Regional Hydraulic Model for the City of Austin
Provo River Watershed Modeling with WMS Ryan Murdock.
Analysis of the Snow Water Equivalent (SWE) in the Logan River Watershed Paul Ackerson CEE 6440.
From GIS to HMS U.S. Army Corps of Engineers Hydrologic Engineering Center University of Texas at Austin Center for Research in Water Resources Francisco.
Rainfall Runoff in the Guadalupe River Basin
Development of a Hydrologic Model for the Wichita Falls District
Creating Watersheds and Stream Networks
HEC-HMS Runoff Computation Modeling Direct Runoff with HEC-HMS Empirical models Empirical models - traditional UH models - traditional UH models - a.
Hydrologic modeling of Waller Creek
Presentation transcript:

WMS Investigation: Travel Time Variability with Method, Area, and Slope Ryan Murdock May 1, 2001

Data Collection USGS DEMs –30m resolution –UTM projection –3 locations Cuyahoga River: Cleveland, Ohio Provo River: Provo, Utah Town Creek: Johnson City, Texas DRG background maps

Watershed Delineation Smooth DEM Flow directions & flow accumulations Convert raster streams to feature arcs Choose outlet Set accumulation threshold Delineate basin boundaries Convert basin to polygon Compute basin data

Choosing Accumulation Threshold

Cleveland, Ohio

Johnson City, Texas

South Fork of Provo River, Utah

Land Use/Land Cover & Soils Data BASINS Coverages Geographic Coordinates

Projecting and Clipping ArcView –Project land use and soils data to UTM Zone 12 using the Projector Utility –Export basin boundary from WMS –Clip themes using Spatial Analyst Geoprocessing Wizard

Coverages in WMS Import shapefiles into WMS Assign land use and soil type coverages

Automated CN Calculation Import CN table Composite CN=0.5? Estimated CN=75

Flow Data USGS gaging station at watershed outlet Use 1963 peak flow of 500cfs

HEC-1 Calibrate to measured peak flow by changing precipitation Basin average precipitation, type II-24 hr series SCS curve number method SCS unit hydrograph

Hydrographs! P=1.22 in, CN=65

Travel Time Calculator

Assumptions/Simplifications Each basin –Same % impervious –Same CN –Same roughness –Changed slopes in calculator, not re-delineated

Analysis More dispersion of results in larger basins Increasing slope causes the standard deviations to decrease No strong trends with slope in the coefficient of variation Different sized basins with the same slope have similar coefficients of variation

Equation Evaluation Pretty Robust –Putnam, Kerby, Denver Touchy –Fort Bend County –Taylor SCS method predicts longer travel time Remember the conditions under which the equations were developed

Time is Running Out… Revisit the composite CN process –Confidence in HEC-1 calibration Include Cuyahoga River travel time results Look at the equivalent velocities represented by each equation/method

That's the end of today’s modeling adventures, kids.