1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.

Slides:



Advertisements
Similar presentations
CEOS WGISS & Subgroup Meeting, Budapest, May CCSDS Liaison Consultative Committee on Space Data Systems Wyn Cudlip BNSC/QinetiQ
Advertisements

CESG, Fall 2011, 5 th November 2011 Stuart Fowell, SciSys Device Virtualisation and Electronic Data Sheets.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) October.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
31 st October – 4 th November 2011 Fall 2011 Meeting Agenda Boulder, Colorado, USA SOIS Application Support Services WG Conclusions & Actions.
ESA UNCLASSIFIED – For Official Use Workshop #23 Pasadena, USA 23-27Mar15 Mario Merri, ESA/ESOC SM&C WG Plenary.
12006 MAPLD International ConferenceSpaceWire 101 Seminar CCSDS Standard On-Board InterfaceS (SOIS) Rick Schnurr NASA – Goddard Space Flight Center CCSDS.
ESA UNCLASSIFIED – For Official Use Spring CCSDS meetings Opening Plenary Chris Taylor ESA Estec April 2012.
Chris Taylor TEC-EDS 1 SOIS Prototyping Activities CCSDS SOIS Berlin 2008 C. Taylor ESA- ESTEC.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
May11-cesg-1 status:OKCAUTIONPROBLEM comment: Very Good SOIS Area Report Wireless WG Goals for the spring meeting Complete the discussions and agree on.
CCSDS Fall Meeting From Bespoke to Standard Solid State Mass Memories Aitor Viana Sánchez Data Handling Systems ESTEC, 27 th Oct 2009.
16 th – 19 th April 2012 Spring 2012 Meeting Agenda Darmstadt, Germany SOIS Application Support Services WG.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Data Systems Division TEC-EDS SOIS – SpaceWire Working Meeting Estec April 2007 Chris Taylor ED-EDS Stuart Fowell SciSys UK Ltd Dai Stanton Keltik.
SOIS Plenary Session Spring 2015 Meeting Chris Taylor ESA.
ESA UNCLASSIFIED – For Official Use SOIS Evaluation by the Primes F. Torelli (ESA) Software Reference Architecture - Focus on the Execution Platform ADCSS.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
1 SOIS Plenary Washington March 2008 Chris Taylor.
Real-Time Systems Presented by: Stuart D Fowell SciSys SOIS Prototyping Activities CCSDS Spring 2008 Meeting, Washington D.C, USA.
SOIS APP Working Group Overview. Presentation Overview Application Support Services Electronic Datasheets ESA Project History and Plans Standards Documentation.
ESA UNCLASSIFIED – For Official Use Recap of SOIS Evaluation by the Primes F. Torelli (ESA) CCSDS Spring Meeting, 23/03/2015.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 10) StatusComment ProgressGood Progress overall, especially on the.
Nov11-cesg-1 SOIS Area Report Wireless WG Primary Objectives for the fall meeting Establish lessons learned from the Asset Management (AM) Magenta Book.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
23 rd October 2009 Stuart Fowell SciSys and Astrium SOIS Projects - CCSDS Fall 2009 Meeting.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
10-Dec-2012-cesg-1 SLS AREA REPORT SLS-OPT: Optical Communications Working Group (1 of 6) StatusComment ProgressGood Progress overall, especially on the.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
SOIS EDS and Onboard Architectures. ESA ‘de-facto’ Architecture PUS Services Mission Applications Data Handling PUS TM/TC Internal Datapool API System.
CCSDS SOIS Working Group Meeting – Berlin, Germany 14th of October 2008 Prototyping of CCSDS SOIS services on 1553 Bus Sev Gunes-Lasnet, Olivier Notebaert.
1 SOIS P&P input. 2 Introdcution As part of the work to standardise onboard communication services, the CCSDS SOIS WG has recently delivered new draft.
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
SOIS Application Support Service WG and SOIS Plug-and-Play BoF Spring 2008 Report.
1 09 October SOIS Report to CESG/CMC 9 October 2007 Patrick Plancke, C. Taylor.
Standard Onboard interface Services – Overview and status Chris Taylor Stuart Fowell October 09.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Real-Time Systems Presented by: Stuart D Fowell SciSys AMS Prototyping CCSDS Spring 2008 Meeting, Washington D.C, USA.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
SOIS Services Version 3, with post 19 Jan 2016 Telecon mods.
Spacecraft Onboard Interface Services Application Support Services Working Group (SOIS-APP WG) CCSDS Spring 2013 Meeting.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
Chris Taylor TEC-EDS 1 Communication Management CMD & Data Acquisition Services Time Access Service File & Packet Store Services Message Transfer Service.
The CCSDS Spacecraft Onboard Interface Services (SOIS) Standards An Introduction Stuart Fowell 6th October 2009.
SOIS APP Working Group Overview
SciSys SOIS Prototyping Activities
SOIS Prototyping Activities
SOIS Application Support Services WG – Fall 2009 Meeting
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
From Bespoke to Standard Solid State Mass Memories
SOIS-APP Working Group Report Jonathan Wilmot (WG Chair)
Recap of SOIS Evaluation by the Primes
TECH SESSION #1 ELECTRONIC DATA SHEETS
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
Presentation transcript:

1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007

2 Agenda Meeting Overview for the week Status since last meeting Supporting activities AOB Joint working group meeting…..

3 Overview of the Week Monday (all day) –Status since last meeting –Supporting developments –Rid Processing……… Tuesday (all day) –Plug and Play discussion –Use cases –Agreement on approach Wednesday (morning) –Joint AMS - Apps service meeting –Agreement on SOIS subset Thursday (morning) –Apps service WG Friday (Morning +) –Plenary –Consolidation and action assignment

4 Status Recap At the last meeting we achieved general consensus on the overall architecture, services and approach to be taken for development Several draft recommendations and a supporting Green book were delivered by the working group After discussion the CESG agreed to release the Draft books for Agency review with a decision pending on Magenta or Blue Rids have been received and will be processed during the meeting (includes input from dedicated SOIS/SpaceWire working group) Draft Red books are still pending on the Application support layer in relation to plug and play – topic of dedicated meeting this week Note that SOIS is mainly tasked with developing services to which other standards bodies will develop protocols

SOIS overall Architecture Data Link Layer UserApplications SpaceWireEthernetIEEE1394CAN1553 Denotes service access point Network Protocol Transport Protocol Transfer Layer USB ONE Wire IEEE Packet Service Memory Read/Write Service Time Distribution Service Device Discovery Service Test Service Sub- Network Layer Data Link Convergence Functions Device Enumeration Service Application Support Layer Time Access Service File Services Message Transfer Service Cmd & Data Acquisition Services Network Management Services Plug and Play Services

SOIS – Software Context

7 Status Recap The following books have been released for Agency review: –Green Book –APP Device Access Service APP Device Data Pooling Service APP File Access Service APP Time Access Service –Subnetwork Packet Service Subnetwork Test Service RID Subnetwork Time Distribution Service Subnetwork Device Discovery Service Subnetwork Memory Access Service The following books still need to be developed: –Message Transfer service –Device Enumeration service

8 Supporting activities (ESA) At ESA we have several supporting activities that are SOIS related: –SpaceWire working group has been tasked to develop SOIS compliant protocols –ECSS (European Cooperation for Space Standardisation) Mil bus working group tasked with developing SOIS compliant protocol (WG draft available) –ECSS work item initiated for SOIS compliant CAN bus protocol –We have held several meetings with European industry with a view of harmonising the flight data handling system, this will result in a standard reference architecture for which SOIS will be used as the communication element –An ITT has been released for SOIS prototyping, the results of which will be integrated into an Estec reference test bed (output mid 2008) –Several additional ITT’s are under preparation to be released in 2008

9 Supporting activities (ESA)

10 Supporting activities (ESA)

11 Summary Although developments have moved slower than we would of wished, there are a number of background activities giving support and emphasis Missions are also interested with SOIS based implementations being offered by industry What is needed now is more prototyping based on real use-cases to show the benefit of SOIS and consolidate the specifications Main goal of the week is to complete the RID process and develop the requirements for plug and play to a point where the remaining red books can be drafted

12 AOB Personal changes –Glen Rakow (NASA) adopted as deputy lead for the Subnetwork Services WG –Max Ciccone (ESA) proposed as deputy lead for the Applications Service s WG Any more? ….

13 RID Processing Application Support services – Lead Stuart Subnetwork Services – Lead Dai