Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during 2011-12.

Slides:



Advertisements
Similar presentations
1 Process of Data entry in Budget Proformae. 2 Outline General Instructions Proforma – A:Receipts Proforma – B1:Expenditure Non Plan Proforma – B2:Expenditure.
Advertisements

1 Emerging communities for collective innovation: ICT Operational tool and supporting methodologies for SME Associations 2010 January,
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
FREQUENCY SPECTRUM FROM AUGUST 06 TO OCT 06 (UPTO 20 TH OCT 06) < 49.0 HZ< 49.5 HZ< 50.0 HZ HZ>50.2HZ>50.5 HZ Aug
OPEN ACCESS IN INTER-STATE TRANSMISSION. DEFINITION OF “ OPEN ACCESS ” IN THE ELECTRICITY ACT, 2003 “The non-discriminatory provision for the use of transmission.
Maharashtra State Load Despatch Centre Role of SLDC in RRF Implementation & Issues By MSLDC.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
Largest sized hydro unit (180 MW at Chamera) in the country Salient Features Northern Regional Power System Welcome Reforms Within The State, Trading And.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
1.Meter installation database and its up-dating on a regular interval. 2.Meter testing details and last testing done 3.Downloading of data and transmission.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
IEGC PROVOSIONS FOR RENEWABLE GENERATION SCHEDULING & UI SETTLEMENT 1.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Billing, Collection and Disbursement Procedures
SCHEDLING MECHANISM AND RELATED ISSUES T. SRINIVAS MANAGER,SRLDC BANGALORE.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
Shared Generators-LTOA customers WRLDC,Mumbai. NSPCL---NTPC&SAIL JOINT VENTURE,BHILAI.
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
23 rd Commercial sub-committee meeting on
THE RIGHT TO INFORMATION ACT, SECTION 3 Subject to the provisions of this Act, all citizens shall have the right to information.
1 EURO REPORTING – Doing Business With The EC –. 2 Index  Relationship Overview  The FAFA Principles  Gain/Loss Scenarios  Financial Risk  Possible.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
14 TH Commercial sub-committee meeting UI &REC Audit Talcher II scheduling SEM DATATransmission pricing AMR Others.
Commercial Points for 93 rd OCC meeting. Change in Bank a/c New Account for Deviation Settlement opened in Axis Bank Name of the A/C : Power System Operation.
Open Access for Renewables New initiatives. Scheduling and OA of RE Open Access through LTA/ MTOA/ STOA route envisaged Applicable to Wind and Solar without.
Queries raised by Director (Tariff) on ARR and Tariff Application of OPTCL for FY on
SCHEDULING METHODOLOGY The station-wise (Ex-bus) capability would be submitted by the ISGSs in the specified format. ISGSs would declare the capability.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
Commercial Issues Yet to open LC for UI payment delays : TN default in UI& Reactive charges Tamilnadu to pay 100Crs. as UI charges and 2Crs. as Reactive.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
Congestion regulations. Definitions and Interpretation “Available Transfer Capability (ATC)” means the transfer capability of the inter- control area.
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
Renewable Regulatory Fund (RRF):- Implementation Mechanism
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
CONFIRMATION OF MINUTES (AMENDED PARA) Director (Transmission ), KPTCL stated that on account of DC current entering the neutrals of various transformers.
Electricity pricing Tariffs.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
UI POOL FINANCIAL SETTLEMENT & PAYMENT SECURITY OPTIONS.
Philippine Feed-In Tariff System Implementation 1.
Availability Based Tariff (ABT) in Northern Region.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Transmission Tariff V.Balaji Chief Manager SRLDC.
SYSTEM OPERATION AVG, MAX & MIN DRAWAL SHARE ALLOCATION INTER-REGIONAL IMPORTS 3D FREQ OCT-03 3D SR DEMAND FREQ COMPARISION OCT-02 & OCT-03 GENERATION.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
Extract from Annexure-1 on ‘Complementary Commercial Mechanisms of Indian Electricity Grid Code ’12(a) Weekly bills shall be issued to the constituents.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
OPEN ACCESS EXPERIANCES AND WAY-AHEAD V K Agrawal, General Manager, SRLDC WORKSHOP ON GRID SECURITY AND MANAGEMENT 28 th and 29 th April, 2008.
Commercial Issues for 73 nd OCC TN opened LC for Rs.5Crs for UI payment delays during TN to enhance the LC amount to 32.84Crs as per their liability.
LINKS ACHIEVEMENT SELF STARTING STATIONS SYNCHRONISING SUB-STATIONS SYNCHRONISING SUB-STATIONS.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
19 TH Commercial sub-committee meeting UI &REC reconciliation STOA reconciliation LC statusSEM Outstanding UI/Rec Others POC RRF.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 2 nd SRPC MEETING 30 TH OCTOBER 2006 HYDERABAD GRID EVENTS AND ISSUES.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
OPEN ACCESS IN INTER-STATE TRANSMISSION. INTRODUCTION Open Access is necessary for utilization of short time surpluses. Open Access will also create options.
Open Access.
UNIFIED LOAD DESPATCH SCHEME IN THE SOUTHERN REGION
Open Access.
Scheduling of Collective Transactions Through Power Exchange
Hon’ble Commission has issued Interim order dated 19/ directing :
IN INTER-STATE TRANSMISSION
GRID STATUS – PRE - ABT Very wide Frequency fluctuations
Presentation transcript:

Commercial Issues Yet to open LC for UI payment delays : TN default in UI & Reactive charges Tamilnadu still to pay 74Crs. as UI charges during Due to shortage Wk 10 &11 UI disbursement not done UTILITY LC AMOUNT (Rs.Crs) Default for year AP Puducherry TN32.84Current year TALCHER II1.4Current year

DELAY IN WEEKLY SEM DATA RECEIPT DURING OCT 2011 AndhrapradeshKarnatakaKeralaTamilnadu Stations No.of occass ions Stations No.of occass ions Statio ns No.of occassi ons Statio ns No.of occass ions Kothaguda m 3Kadakola1Idukki1 Udumal pet 3 Mamidipal ly 1Bellary1 SV chatram 2 Mehboobn agar 1Sedam1 Arni1 KTPP1 Yerandana hally 1 Kalpaka 1

Time drift report receipt status: ANDHRAPRADESH: No station is sending KARNATAKA: Only Nelamangala sending – not regular TAMILNADU Only Gumdipundi, Hosur & Kuzhithurai sending regularly. PONDICHERRY Resumed sending ISGS STATIONS: NTPC: RSTPS not regular NLC : NLC II and Expansion I not regular. MAPS : Not sending

Mock Exercise for the implementation of the RRF CERC directed to start mock exercise for the implementation of RRF w.e.f SLRDC wrote to Beneficiaries on requesting to make arrangements Letter dt Letter dt

Actions to be taken by states States to furnish: a list of the wind farms and solar farms eligible for RRF provision. details of Contracts along with contracted price to the concerned RPC and RLDC through the respective SLDC Forecasting data for wind and solar generation to the concerned SLDC/RLDC and RPC 15-minute block-wise data of schedule and actual generation from wind farm generation/ Solar Generation plants as recorded in the Special Energy Meters on a weekly basis

Solar Schedules vetting Solar generators may be advised to give availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve etc. so as to enable SRLDC to vet the Generation schedules

Identify Nodal Officer Furnish Details of Nodal developer who shall be responsible for coordinating for the collective capacity on behalf of the group of developers on issues like SCADA, metering, scheduling, UI charges, RRF, forecasting data with the concerned SLDC/RLDC. States to identify a nodal officer for coordinating on the above matters.