WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: 2013-10-14/18 Agenda.

Slides:



Advertisements
Similar presentations
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Advertisements

WG PRO Progress Report at TP17 Group Name: oneM2M TP17 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
CURRENT STANDARDIZATION ACTIVITIES – ONEM2M GSC-18 Meeting, July 2014, Sophia Antipolis, France Document No: GSC(14)18_012 Source: ETSI Contact:
Method of Converting Resource definitions into XSD Group Name: WG3 (PRO) Source: Shingo Fujimoto, FUJITSU, Meeting Date:
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Thoughts on oneM2M resource tree Group Name: WG2 Architecture at TP#7 (Sophia, October 2013) Source: Nicolas Damour, Sierra Wireless
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
3GPP Rel-13 Interworking discussions
ITU-R Liaison Group Report - Session #76 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0061 Date.
App-ID Discussion Group Name: ARC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 31 July 2014 Agenda Item: TBD.
Guidelines for: Release Maintenance, Small Enhancement and Feature Work Items Group Name: TP15 Source: Mow Convenor, (Scarrone Enrico, Telecom Italia)
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
Response Status Codes Concepts for oneM2M Group Name: WG3 Source: Philip Jacobs, Cisco, Meeting Date: Agenda Item: TS-0004.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP-session62-agenda Title: m Session #62 Agenda Date Submitted: May 12, 2014 To be presented.
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Discussion on the problem of non- Blocking Synchronous mode Group Name: ARC WG Source: Yuan Tao, Mitch Tseng, Huawei Technologies Meeting Date: ARC 15.2.
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
IEEE Session # 3 Closing Plenary Mark Klerer, Jerry Upton Vice-Chairs 24 July 2004 IEEE /13r1.
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
3GPP Rel-13 Interworking discussions
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Authorization Architecture Discussion Group Name: SEC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 28 MAY, 2014 Agenda.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Possible options of using DDS in oneM2M Group Name: ARC Source: KETI, Huawei, Hitachi, China Unicom Meeting Date: Agenda Item: DDS binding.
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
Specifying the Address of Management Client of Managed Entity Group Name: ARC Source: Hongbeom Ahn, SK Telecom, Meeting Date: TP#21 Agenda.
3GPP Rel-13 Interworking discussions Group Name: TP #18 Source: Rejesh Bhalla, ZTE Corporation, Meeting Date: Agenda Item:
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
ATIS’ Machine-to-Machine (M2M) Activity
WG2 - ARC TP#29 Status Report
Possible options of using DDS in oneM2M
WPM ad-hoc group report TP#24
3GPP Rel-13 Interworking discussions
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Considering issues regarding handling token
GISFI #5 Meeting Report: FRN (Future Radio Networks)
Current standardization activities – oneM2m
IEEE MEDIA INDEPENDENT HANDOVER DCN:
ATIS’ Machine-to-Machine (M2M) Activity
Presentation transcript:

WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda Item: WG Reports

Issues for DECISION in TP None identified © 2013 oneM2M Partners 2

Issues for DISCUSSION in TP None identified © 2013 oneM2M Partners 3

Items for INFORMATION © 2013 oneM2M Partners 4

Highlights Progressed Work-Items – WI-0008 TR-0009v0.2.3 Protocol Analysis (to be available) – WI-0009 TS-0004v0.1.1 Protocols (on the portal) Decision in WG to reschedule approvals – WI-0008 TR-0009 until TP#10 TP – WI-0009 TS-0004 until TP#12 see TP Need to work on Management protocols with WG5 – Discussion on a WG5 Work-Item (possibility for shared responsibility & shared text in the Technical Specification) – Feasible in October TP.8 for shared room with WG-2 to avoid overlap. © 2013 oneM2M Partners 5

Open Issues Document oneM2M-PRO R03-Protocol_Segments – What are the differences between PS1 and PS2, why not the same protocols? – Why can we not allow all protocols on any interface? – No prohibitions or restrictions at that stage of development – why should we develop any at this point? – PS5, PS4, PS6 – what’s the difference according to what had been defined so far? – Picking up one protocol now is dangerous as each one has its characteristics. – The concept of protocol statements is very useful. Some reference points are not covered. Need a protocol segment for Mcn. – There are more reference points to be covered as in the diagram. – In most cases PS1 goes over larger network and PS2 goes over local area network – could justify different protocols. – More protocols should be considered. – No difference seen between PS 3 and PS5. – PS1 and PS2 are to be sorted at first, the others can come further. Most likely to support more than one option. – Choosing from the list of candidatures seems still premature before solidifying a portion of Architecture. © 2013 oneM2M Partners 6

Open Action Items None identified © 2013 oneM2M Partners 7

Next Steps Request contributions to complete analysis in the TR – Verticals utilization of protocols E.g. Energy, Residential – Protocol analysis E.g. Zigbee, IEEE Request contributions for preliminary work on TS – Attribute data types, segment protocols, etc. Progress TR and TS though conference calls © 2013 oneM2M Partners 8

Next Meetings / Calls Proposed Interim meetings between TP#7 and TP#8 (December 09) – PRO#7.1 Wednesday – 1:00 pm UTC, October 30 (NA daylight time - EU standard time) – PRO#7.2 Wednesday – 1:00 pm UTC, November 06 (World on standard time) – PRO#7.3 Wednesday – 1:00 pm UTC, November 13 (World on standard time) – PRO#7.4 Wednesday – 1:00 pm UTC, November 20 (World on standard time) – PRO#7.5 Wednesday – 1:00 pm UTC, November 27 (World on standard time) WG-3 sessions are expected in Stream 1 with WG-2 at TP#8 (09-14-December 2013) © 2013 oneM2M Partners 9