National Institute of Advanced Industrial Science and Technology Some topics from the OGF20 and the EUGrid PMA F2F Meeting Yoshio Tanaka Grid Technology.

Slides:



Advertisements
Similar presentations
National Institute of Advanced Industrial Science and Technology Asia Pacific Grid PMA Yoshio Tanaka APGrid PMA, Chair Grid Technology Research Center,
Advertisements

Resource WG Update PRAGMA 14 Mason Katz, Yoshio Tanaka, Cindy Zheng.
Resource WG Update PRAGMA 14 Mason Katz, Yoshio Tanaka, Cindy Zheng.
Demonstrations at PRAGMA demos are nominated by WG chairs Did not call for demos. We will select the best demo(s) Criteria is under discussion. Notes.
2 nd APGrid PMA F2F Meeting Osaka University Convention Center October 15 09: :20 # Participants: 26.
Introduction of Grid Security
Updates of the APGrid PMA Catania March 3, 2009 Yoshio Tanaka APGridPMA Chair, AIST, Japan.
International Grid Trust Federation Session GGF 20 Manchester, UK Wednesday, May CAOPS-WG session #2.
Template Profile Jens Jensen, STFC RAL GridNet2/ UK e-Science CA OGF22 Boston.
Status of Auditing Guidelines Document Oct. 15 Yoshio Tanaka, AIST.
© 2007 Open Grid Forum CAOPS-WG Christos Kanellopoulos - Yoshio Tanaka Security Area coordination & outreach OGF25, Catania March 2 nd – 3 rd, 2009.
© 2006 Open Grid Forum Interoperability Requirements for e/Cyber-infrastructure Workshop.
National Institute of Advanced Industrial Science and Technology Proposals for auditing Yoshio Tanaka Grid Technology Research.
Authorization WG Update David Kelsey EU Grid PMA, Copenhagen 27 May 2008.
4 th APGrid PMA F2F Meeting Academia Sinica, Taipei, Taiwan April 8, 2008 Agendahttp:// Call for note takers!
National Institute of Advanced Industrial Science and Technology Status and plans of the APGrid PMA Yoshio Tanaka Grid Technology.
INFSO-RI Enabling Grids for E-sciencE JRA3 2 nd EU Review Input David Groep NIKHEF.
2 nd APGrid PMA F2F Meeting Osaka University Convention Center October 15 Wireless LAN SSID: PRAGMA11 Wep key: PRAGMA11JAPAN.
National Institute of Advanced Industrial Science and Technology Auditing, auditing template and experiences on being audited Yoshio Tanaka
Updates of APGrid PMA 22 June, Members (15 + 1) 15 Accredited CAs AIST (JP) APAC (AU) ASGC (TW) CNIC (CN), SDG IGCA (IN) IHEP (CN) KEK (JP) KISTI.
National Institute of Advanced Industrial Science and Technology Self-audit report of AIST GRID CA Yoshio Tanaka Information.
National Institute of Advanced Industrial Science and Technology Updates of the APGrid PMA Yoshio Tanaka Grid Technology Research.
March 27, 2006TAGPMA - Rio de Janeiro1 Short Lived Credential Services Profile Tony J. Genovese The Americas Grid PMA DOEGridsATF/ESnet/LBNL.
National Institute of Advanced Industrial Science and Technology Brief status report of AIST GRID CA APGridPMA Singapore September 16 Yoshio.
Updates from the EUGridPMA David Groep, July 16 st, 2007.
Profile for Portal-based Credential Services (POCS) Yoshio Tanaka International Grid Trust Federation APGrid PMA AIST.
Sam Morrison APAC CA – APGridPMA - ISGC2010 APAC CA Self Audit and status update Sam Morrison ARCS.
RF Tracker Update April Other Oversight Activities: RF Monitoring  RF Monitoring Update –RF Tracker was opened for data entry on October.
ESnet RAF and eduroam ™ Tony J. Genovese ATF Team ESnet/Lawrence Berkeley National Laboratory.
National Institute of Advanced Industrial Science and Technology APGrid PMA: Stauts Yoshio Tanaka Grid Technology Research Center,
International Grid Trust Federation Session GGF 20 Manchester, UK Wednesday, May CAOPS-WG session #2.
Discussions on the Life Ray Portal and credential management David Groep, Oct 11 th, 2011.
Updates from the EUGridPMA David Groep, May 9 st, 2007.
National Institute of Advanced Industrial Science and Technology GGF12 Workshop on Operational Security for the Grid Cross-site authentication and access.
Lessons Learned from disaster recovery Jinny Chien April 20, th APGridPMA in Taipei.
NECTEC-GOC CA The 3 rd APGrid PMA face-to-face meeting. June, Suriya U-ruekolan National Electronics and Computer Technology Center, Thailand.
Opening Remarks and Updates of the APGrid PMA 5 th APGridPMA September 16, 2008 Yoshio Tanaka APGridPMA Chair, AIST, Japan.
APGrid PMA face-to-face meeting, 9/16/2008 PRAGMA-UCSD CA Team Pacific Rim Application and Grid Middleware Assembly
Security Policy Update WLCG GDB CERN, 14 May 2008 David Kelsey STFC/RAL
EGI-InSPIRE RI EGI EGI-InSPIRE RI Establishing Identity in EGI the authentication trust fabric of the IGTF and EUGridPMA.
0 NAREGI CA Status Report APGrid F2F meeting in Singapore June 4, 2007 Rumiko Masuko.
Kento Aida, Tokyo Institute of Technology Joint Meeting Grid activities committee and Grid working group Jan. 28 th, 2004 Honolulu.
JSPG Update David Kelsey MWSG, Zurich 31 Mar 2009.
Update of APGridPMA APGridPMA Meeting Academia Sinica, Taiwan 22 March,
NIIF CA Status Update and Self-Audit Results 15 th EUGridPMA meeting Nicosia Tamás Máray NIIF Institute.
APGridPMA Update Eric Yen APGridPMA August, 2014.
The Americas Grid Policy Management Authority TAGPMA Update Derek Simmel 35 th EUGridPMA Meeting Amsterdam, Netherlands.
TR-GRID CA Self-Auditing Results and Status Update EUGridPMA Meeting September 12-14, 2011 Marrakesh Feyza Eryol, Onur Temizsoylu TUBITAK-ULAKBIM
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Security aspects (based on Romain Wartel’s.
Summary of Poznan EUGridPMA32 September EUGridPMA Poznan 2014 meeting – 2 David Groep – Welcome back at PSNC.
18 th EUGridPMA, Dublin / SRCE CA Self Audit SRCE CA Self Audit Emir Imamagić SRCE Croatia.
Update of APGridPMA Eric Yen 25 th EUGridPMA & IGTF All Hands Meeting KIT, Germany 7 May, 2012.
The Americas Grid Policy Management Authority TAGPMA Update Derek Simmel (delivered by David [Groep|Kelsey]) 31 th EUGridPMA Meeting Tartu, Estonia May.
Updates of APGrid PMA 18 th EUGridPMA Meeting 18 th EUGridPMA Meeting 18 January, 2010 Eric Yen ASGCCA Taiwan.
15-Jun-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the LCG Security Group) CERN 15 June 2004 David Kelsey CCLRC/RAL, UK
Updates from the EUGridPMA David Groep, Oct 17 st, 2007.
16 th EUGridPMA Meeting An Update from the TAGPMA Vinod Rebello Zurich, Switzerland 11th May 2009 The Americas Grid Policy Management Authority.
29 th EUGridPMA meeting, September 2013, Bucharest AEGIS Certification Authority Dušan Radovanović University of Belgrade Computer Centre.
Agenda Status of CAOPS-WG – Darcy (1’) Status of Documents – Darcy (5’) OCSP Requirements for OCSP – Olle (20’) Authentication Profiles – Tony (20’) Auditing.
Self-Audit & Status Report for KEK GRID CA Hiroyuki Matsunaga KEK (High Energy Accelerator Research Organization), Computing Research Center APGridPMA.
International Grid Trust Federation Session GGF 19 Chapel Hill, NC, USA Thursday, Feb CAOPS-WG session #1.
IGTF in 10 years enabling the interoperable global trust federation Nikhef, Amsterdam supported the Dutch national e-Infrastructure funded and coordinated.
IRAN-GRID CA Self Audit IRAN-GRID CA Self Audit Report Shahin Rouhani IRAN-GRID Tehran Iran Shahin Rouhani Grid Computation Group IPM, Tehran, Iran May.
AEGIS Certification Authority
Classic X.509 AP updates (v4.1)
Updates of the APGrid PMA
GridRPC Working Group 13th Meeting
HellasGrid CA & euGridPMA
Emir Imamagić University Computing Centre (Srce)
KISTI CA Report Status & Self-Audit
Presentation transcript:

National Institute of Advanced Industrial Science and Technology Some topics from the OGF20 and the EUGrid PMA F2F Meeting Yoshio Tanaka Grid Technology Research Center, AIST, Japan

Highlights of the OGF21 Dates: May 7 th to 11 th Place: Manchester, UK More than 900 participants, co-located with EGEE User ’ s meeting IGTF Session Agenda Updates from regional PMAs (15 ” ) APGrid PMA (Yoshio) EUGrid PMA (David) TAGPMA (Darcy) Problems in compliance with the new Authentication Profile (20 ” ) Authentication Profiles (20 ” ) Member Integrated Credential Services AP (Darcy) Portal-based Credential Services AP (Yoshio) Hardware Tokens (20 ” ) Robots (Jens)

Highlights of the EUGrid PMA F2F Dates: May 30 th to June 1 st Place: Istanbul, Turkey About 30 participants Long time spent for discussions about self- auditing and compliance with the new Classic AP. Results are in the next slide.

Results of the discussion All members should do a self-audit at least once a year, based on the audit guidelines document At least once every two years, the results of the self-audit, together with all supporting documentation, should be submitted to two independent peer reviewers endorsed by the PMA -- one experienced one and a novice, for example, as long as there are novices. The reviewers should independently verify the self-audit, and rate the issues on the scale A, B, C to D and iterate with the authority under review to reach a final conclusion. This conclusion is open for the PMA. The Authority should make a plan to address the issues found in the review, and correct all issues on which Advice ("D") was given. The reviewers and the PMA verify that these changes are implemented in a 6-month time frame (at least for "D" advices). If, after six (6) month, for some very unlikely reason, the issues are still not corrected, the PMA will discuss the issue in the next plenary meeting. This discussion will include considering withdrawing the CA certificate from the distribution.