Generation Adequacy Task Force Update to WMS November 18, 2009.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
Capacity Valuation.
Generation Adequacy Task Force Results of the 2012 Loss of Load Study January 18, 2013.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
NERC LTRA Update / CDR Capacity Counting Issues
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
RTWG Report to TAC August 5, 2010 Howard Daniels.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
Network Customer Meeting Access Metric Update November 16, 2006.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
1 Planning Reserve Margin Dan Egolf Senior Manager, Power Supply & Planning.
Generation Adequacy Task Force Update to WMS September 14, 2011.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Report to TAC December In Brief Working Group Reports Working Group Reports DSWG DSWG CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Task Forces Task Forces.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
2010 Work Plan Steering Committee January 29, 2010.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Bob Wittmeyer MIG TF Charter Examine and investigate the reliability, and market, impacts as well as the interconnection processes/procedures.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
1 TAC Report to the ERCOT Board February 16, 2005.
Report to TAC March In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
1 WMS Report TO TAC April 2007 (which is in March)
1 Project Update and Summary of Project Priority List (PPL) Activity November 12, 2015.
1 RTWG Report to TAC June 4, 2009 Henry Durrwachter.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Market Credit Working Group update to the Wholesale Market Subcommittee 03/04/
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 TAC Report to the ERCOT Board November 14, 2006.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
1 Commercial Operations Sub-Committee Update to RMS November 10, 2005.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
2006 Report on the Capacity, Demand, & Resources for the ERCOT Region Technical Advisory Committee June 1, 2006 Kenneth A. Donohoo. P.E. Manager, Transmission.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
2006 CDR Status Report Technical Advisory Committee May 4, 2006 Bill Bojorquez.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting March 11, 2008.
1 Project Prioritization Review May 14, Approved Revision Requests “Not Started” – Planned to Start in Future Months Revision Request Target Start.
LOLEv Methodology Details GATF April 5, Calculation of the Target Reserve Margin in the LOLEv study The reserve margin is calculated by the following.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
GATF Loss of Load Process (or How to Make Sausage) October, 2012.
Technical Advisory Committee Presentation to the ERCOT Board of Directors April 18, 2007.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Generation Adequacy Task Force Update to WMS
Status of the Planning Working Group’s (PWG) Efforts
Technical Committee Meeting January 27, 2012
Planning Reserve Margin
Resource Adequacy Steering Committee Meeting October 4, 2011
Presentation transcript:

Generation Adequacy Task Force Update to WMS November 18, 2009

GATF has met 3 times: Sept. 22, Oct. 13, and Nov. 3, 2009 Next meeting set for December 1 st. GATF Charter and Goals Developed and included in last month’s update: –Highlights of goals: Review all the findings and recommendations from the previous GATF reports. Thorough review of CDR Recommendation for EILS Recommendations for new technologies (solar, storage, etc.) Recommendation for new LOLP (target reserve margin) study (GATF input into assumptions, data sources, results, etc.). Complete a draft report by the December 2009 WMS meeting that provides ERCOT planning with recommendations on all the assumptions to use in the target reserve (LOLP) study and subsequent reserve margin calculations. Complete a final report for consideration and vote at the January 2010 TAC meeting Wind Historical Data Provided by Luminant: Meeting Updates

CDR: Thorough review will occur on December 3 rd. –Is 5 year horizon adequate? –Does it need high and low forecasts? –Flow diagram of processes –Why is county data needed? EILS methodology is still under development LOLP Study (Target Reserve Margin) Discussion –Inputs and assumptions were reviewed at Nov. 3 rd meeting. What will be the source of information for generation forced outage rate assumptions? What years will be studied? Will transmission topology be modeled? If so, to what level of detail? What assumptions will be used for scheduled maintenance of resources? What type of generation technology should be utilized when estimating the effective load carrying capability (ELCC) of wind resources? What resource technology types should be added to the study when determining reserve margins? What modifications, if any, should be made to the model’s input assumptions regarding wind resources? Should wind be modeled with different ELCCs based on their geographic location (west, coastal, etc.)? What assumptions should be made for other renewable technologies (solar, biomass, etc.)? What is the source of information for generation forced outage rate assumptions? Synopsis of Discussions and Issues

Luminant provided an overview of wind historical data –Indicated current 8.7% level in CDR may be too low. –ERCOT staff believes their studies will also indicate an increase in the ELCC for wind, primarily due to the increased wind generator quantities and more geographic diversity among wind farms today Synopsis of Discussions and Issues

Wind Data Supplied by Luminant

Impact of Revised ELCC on Reserve Margins Supplied by Luminant

Questions or Comments?