EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian.

Slides:



Advertisements
Similar presentations
Status Report on Task Team of Drought Management Sandor Szalai Membet of TT-DM Szent Istvan University, Hungary
Advertisements

Ensemble Forecasting of High-Impact Weather Richard Swinbank with thanks to various, mainly Met Office, colleagues High-Impact Weather THORPEX follow-on.
Norwegian Meteorological Institute met.no LAMEPS – Limited area ensemble forecasting in Norway, using targeted EPS Marit Helene Jensen, Inger-Lise Frogner,
Trond Iversen met.no & Univ. Of Oslo
Meteorological Training Course, 20 March /25 Using Combined Prediction Systems (CPS) for wind energy applications European Centre for Medium-Range.
COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
SIPR Dundee. © Crown copyright Scottish Flood Forecasting Service Pete Buchanan – Met Office Richard Maxey – SEPA SIPR, Dundee, 21 June 2011.
COSMO General Meeting September 2012 Gergely Bölöni C-SRNWP: Coordination on Short Range Numerical Weather Prediction EUMETNET C-SRNWP Programme:
C ontacts: Marit Helene Jensen, Norwegian Meteorological Institute, P.O.Box 43 Blindern, N-0313 OSLO, NORWAY. HIRLAM at met.no.
© Crown copyright /0XXX Met Office and the Met Office logo are registered trademarks Met Office FitzRoy Road, Exeter, Devon, EX1 3PB United Kingdom.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Improving COSMO-LEPS forecasts of extreme events with.
COSMO General Meeting, Cracow C-SRNWP PROGRAMME 18 September, EUMETNET/C-SRNWP PROGRAMME: STATUS and PLANS Responsible member: Hungarian Meteorological.
CLIMAG LESSONS LEARNED AND FUTURE CHALLENGES A CLIMATE SCIENCE PERSPECTIVE By Hartmut Grassl Max Planck Institute for Meteorology Hamburg, Germany.
WWRP JSC meeting-Geneva Febrary 2011 TIGGE LAM Report Tiziana Paccagnella.
LAMEPS Development and Plan of ALADIN-LACE Yong Wang et al. Speaker: Harald Seidl ZAMG, Austria Thanks: Météo France, LACE, NCEP.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
Expert Team on System Aspects and Interoperability Programme Glenn Greed, UKMO, Project Manager Interoperability Ulrich Schättler, DWD, Chairman of the.
SESAR Single European Sky Air traffic management Research
THEME[ENV ]: Inter-operable integration of shared Earth Observation in the Global Context Duration: Sept. 1, 2011 – Aug. 31, 2014 Total EC.
ESA DA Projects Progress Meeting 2University of Reading Advanced Data Assimilation Methods WP2.1 Perform (ensemble) experiments to quantify model errors.
Interoperability between the European NWP modelling systems Ulrich Schättler, François Bouttier, Xiaohua Yang, Radmila Brozkova, Alan Radford A Report.
PRIMET - Association of Private Meteorological Services Re-use of Meteorological Information held by the Public Sector: The European Experience Daniel.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
Page 1© Crown copyright 2007SRNWP 8-11 October 2007, Dubrovnik SRNWP – Revised Verification Proposal Clive Wilson Presented by Terry Davies at SRNWP Meeting.
Page 1© Crown copyright 2005 SRNWP – Revised Verification Proposal Clive Wilson, COSMO Annual Meeting September 18-21, 2007.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
How can LAMEPS * help you to make a better forecast for extreme weather Henrik Feddersen, DMI * LAMEPS =Limited-Area Model Ensemble Prediction.
A.Montani; Eurorisk-Preview COSMO meeting, Zurich, September 2005 PREVIEW in some words (PREVention, Information and Early Warning) A project funded.
SRNWP meeting, Dubrovnik OMSZ PROPOSAL October, OMSZ proposal for becoming responsible member of the C-SRNWP programme ANDRÁS HORÁNYI
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
Celeste Saulo and Juan Ruiz CIMA (CONICET/UBA) – DCAO (FCEN –UBA)
TIGGE LAM PLAN Eighth meeting of the GIFS-TIGGE Working Group Geneva, 22 to 24 February 2010 Tiziana Paccagnella.
European Cooperation on Nowcasting Yong Wang, ZAMG.
Norwegian Meteorological Institute met.no GLAMEPS: GLAMEPS GLAMEPS: Grand Limited Area Model Ensemble Prediction System Overview of activities EWGLAM –
© Crown copyright Met Office Met Office activities related to needs of humanitarian agencies Anca Brookshaw.
9th COSMO General Meeting September 2007 Athens (Greece) Programme Short-Range NWP Report of the Programme Manager.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
Interoperability at INM Experience with the SREPS system J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF –
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
TIGGE LAM Report WWRP JSC meeting-Geneva Febrary th WWRP JSC meeting Geneva April 2012 TIGGE LAM Report Tiziana Paccagnella with contributions.
Science plan S2S sub-project on verification. Objectives Recommend verification metrics and datasets for assessing forecast quality of S2S forecasts Provide.
Trials of a 1km Version of the Unified Model for Short Range Forecasting of Convective Events Humphrey Lean, Susan Ballard, Peter Clark, Mark Dixon, Zhihong.
Short-Range NWP Programme 8th COSMO General Meeting Organisation: Romanian National Meteorological Administration September 2006 Bucharest (Romania)
J N MUTEMI University of Nairobi & IGAD Climate Prediction and Applications Centre Geneva, 8-10 May 2012 The Observing System Research and Predictability.
A study on the spread/error relationship of the COSMO-LEPS ensemble Purpose of the work  The spread-error spatial relationship is good, especially after.
Fly - Fight - Win 2 d Weather Group Mr. Evan Kuchera HQ AFWA 2 WXG/WEA Template: 28 Feb 06 Approved for Public Release - Distribution Unlimited AFWA Ensemble.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Figures from “The ECMWF Ensemble Prediction System”
TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek, Manuel Fuentes (ECMWF)
© Crown copyright Met Office EUMETNET- SRNWP verification programme -Met Office Responsible member Clive Wilson – Project manager 31st EWGLAM/16th SRNWP.
Responsible member: Hungarian Meteorological Service Period:
Meteorological applications and numerical models becoming increasingly accurate Actual observing systems provide high resolution data in space and time.
Communication of weather information – National Weather Service role – single voice principle – European cooperation Eric Petermann, Executive Director.
Scanning the environment: The global perspective on the integration of non-traditional data sources, administrative data and geospatial information Sub-regional.
GIFS-TIGGE project Richard Swinbank, and Young-Youn Park,
Preliminary test for the development of a 2.8km ensemble over Italy
Linking operational activities and research
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.4 Protecting citizens from environmental hazards European.
2nd Workshop on Short Range EPS 7th–8th April 2005, Bologna
R.J. Graham, The Seasonal Modelling and Prediction Group,
42h forecast HIRLAM 50km 24h accumulated precipitation.
SRNWP-PEPS COSMO General Meeting September 2005
AGREPS – ACCESS Global and Regional EPS
PREVIEW in some words (PREVention, Information and Early Warning)
the performance of weather forecasts
Development and pre-operational testing of a European Flood Alert System (EFAS) Ad de Roo EC, DG Joint Research Centre, Ispra (I)
Presentation transcript:

EurEPS The Realization of an Operational LAM-EPS in Europe A SRNWP Project under EUMETNET Proposed to the EUMETNET Council at its 30 th meeting by Norwegian Meteorological Institute

Norwegian Meteorological Institute met.no Redaction Team Prof. Trond Iversen (Norway – HIRLAM); Leader Andras Horanyi (Hungary – ALADIN) Chiara Marsigli (Italy - COSMO) Ken Mylne (UK – Met Office UM) Yong Wang (Austria – LACE)

Norwegian Meteorological Institute met.no The Overall Aim of EurEPS is to understand and quantify the benefits of the combination of a multi-centre ensemble of ensemble systems (grand ensemble), and to investigate the practical and technological feasibilities for real-time combination of several decentralized ensemble forecast systems, for the purpose of guiding real-time operational short-range probabilistic weather forecasting over Europe.

Norwegian Meteorological Institute met.no Ensemble forecasts Complete description of weather prediction in terms of a Probability Density Function (PDF) Forecast time Temperature Initial condition Forecast Ensemble mean Deterministic control Ensemble members

Norwegian Meteorological Institute met.no Why EPS and Probabilistic forecasting? Valuable information on weather components with rudimentary predictability – thus impossible to give deterministically – can be forecasted Smaller scales of free flows lose predictability first these scales are frequently associated with high-impact weather due to the associated potential loss, even small forecasted probabilities can be highly valueable. Hence EurEPS is proposed to help met services to protect life and property from weather-related hazards by exploiting existing technology and established methods in a cost-efficient way.

Norwegian Meteorological Institute met.no Forecast uncertainty - i.e. Predictability - varies from day to day High predictability low predictability Source: ECMWF Forecast uncertainty - i.e. Predictability - varies with spatial scale Small scalesplanetary scales Day 3.5 Day 5 Day 7 beyond Day 10

Norwegian Meteorological Institute met.no Deterministic forecasts provides single solutions. The simplest way to provide probability information is to add an error distribution to a deterministic forecast, e.g.gaussian or some observed distribution. Ensemble forecasts provide case-dependent probability distributions accounting for the meteorological information available to the ensemble and model uncertainty.

Norwegian Meteorological Institute met.no Schematic illustration of the effect of non-linearity on an ensemble forecast. In the early stage of a forecast, ensemble members diverge quasi-linearly. In later stages, even when one member predicts severe weather, most members can be expected to be drawn towards model climatology. Forecasting high-impact weather requires a probabilistic approach

Norwegian Meteorological Institute met.no The Purpose  in a two-year perspective, is to establish potentials and identify practical obstacles for a pan-European grand short-range ensemble system,  compared to the alterative of using several sub- European and less populated ensemble systems which single NMSs could run on their own.  before taking decisions for an operational pan-European grand ensemble system, both the implied operational challenges and the benefits for operational probabilistic forecasting need to be investigated

Norwegian Meteorological Institute met.no The Multi-centre approach  The distributed multi-centre approach permits to  increase the population of the ensemble  account for a larger diversity of uncertainties  reduce each centre’s computational effort and the time required to produce a probabilistic forecasts.  The intention is to enable increased benefits for similar total cost, since resources are used to produce complementary information in parallel.

Norwegian Meteorological Institute met.no Pro and cons of a Multi-centre approach large common domain frequent and swift real-time exchange of large data amounts increase population and diversity reduce computational effort and time required cons pros

Norwegian Meteorological Institute met.no Objectives  To co-ordinate LAM-EPS within SRNWP to avoid duplication of efforts  To develop a prototype setup for a multi-centre European grand LAM-EPS based on existing developments in the consortia.  To establish the practical feasibility of real-time collection of LAM-EPS data for combination into grand LAM-EPS forecasts to be disseminated to all EurEPS participants.  To demonstrate the skill and value of the grand LAM-EPS for probabilistic prediction of high-impact events,  compared to smaller, single-centre LAM-EPS

Norwegian Meteorological Institute met.no Deliverables  a document defining a set of verification methods, weather parameters and thresholds to be verified, and a set of cases or periods for verification to allow the objectives to be answered  a database of a range of ensemble forecasts and observations, some of which to be combined to a grand ensemble. Population of this database is likely to be completed after the project  a report on the benefits of a grand LAM-EPS for the prediction of high-impact weather events, as opposed to benefits of running simpler distributed systems at single NMSs  definition of a European contribution to TIGGE-LAM

Norwegian Meteorological Institute met.no EurEPS data centre  The LAM-EPS planned in EurEPS basically combines existing systems in European NWP consortia and countries;  A EurEPS data centre should be established.  ECMWF with one fully dedicated person is proposed (128'000 euro per year)

Norwegian Meteorological Institute met.no EurEPS Status  Positive moral support from Eumetnet Council  No financial support from Eumetnet Statements:  Interoperability regarded so far as more urgent  EurEPS may depend on progress in Interoperability

Norwegian Meteorological Institute met.no EurEPS Status Can we follow up, and how?  The GLAMEPS work continues as a HIRLAM-ALADIN co- operative effort RT data-exchange in particular  The full EurEPS project will need support from Eumetnet.  Co-operation with SRNWP  and the Interoperability project to ensure that EurEPS needs are urgently considered  TIGGE-LAM link  EurEPS should follow guidelines from and work in co- operation with TIGGE-LAM.