LHC Beam Operation Comitte24. April 20111 INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Status of ABT beam tests preparation 9-Oct-14. Preparation of sector test without beam I MKI: – Open valves, conditioning to 55 kV, softstart – Check.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
First Collision of BEPCII C.H. Yu May 10, Methods of collision tuning Procedures and data analysis Luminosity and background Summary.
Friday 2 nd November 08:45 Stable beams Fill 3253 Initial luminosity ~7.3e33 cm-2s-1 09:45 Increase RF voltage from 10 MV to 12 MV 12:00 ADT to wideband.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
LHC Injection Sequencing MD 16/23/2009 Injection sequencing / BCM R, Giachino, B. Goddard, (D. Jacquet), V. Kain, M. Meddahi, J. Wenninger.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
MPP Workshop: Injection System C. Bracco on behalf of ABT Acknowledgments: STI, ABP, BI,LHC and SPS OP.
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
Aperture measurements during LHC commissioning 2017
LHC Wire Scanner Calibration
Floating MD week 28 summary
1st LHC MD Period Started
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
SPS extraction, transfer lines, injection
Transfer line test: Beam stability measurements
Emittance growth AT PS injection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
LHC injection W. Bartmann, M.J. Barnes, C. Bracco, F. Burkart, E. Carlier, B. Goddard, V. Kain, R. Steerenberg, L. Stoel, F. Velotti, C. Wiesner, C. Xu.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Monday 14th March Second fill with pilot + 3 nominal bunches
FCC-hh injection group 7
Thursday morning – optics correction
Monday 6th August & night
CNGS Primary Beam Results 2010
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Wednesday 8th August & night
CNGS Proton beam line: news since NBI2002 OUTLINE 1. Overview
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
Planning at 5 o’clock meeting Friday
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
MSWG Report – SPS OP Crew
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
CNGS Primary Beam Results 2011
Thursday – Morning Energy matching at injection with H CODs
Collective effects in the SPS and LHC (longitudinal plane)
TI8 analysis / J. Wenninger
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Thursday 22nd March 00:20 – 02:40 on longer squeeze function, orbit and chroma correction at 4 TeV 2:40 – 5:30 second cycle with long squeeze 5:46 – 7:00.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Friday 15th February - morning
Monday 27th August & night
31/3/2010 Difficult day… but at the end stable beams.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team

LHC Beam Operation Comitte24. April Stability issues Shot-by-shot trajectory stability Bunch-by-bunch trajectory variations Transfer line drifts

LHC Beam Operation Comitte24. April : Large shot-by-shot variations 60 fills in summer 2011: Large Horizontal variations, Vertical is good TI 2 TI 8 Avg. = mm Max = mm Avg. = mm Max = mm Avg. = mm Max = mm Avg.= mm Max = mm

LHC Beam Operation Comitte24. April : Sources of instability TI 2: 1 source matching the MSE  initiated investigations on power converter  power converter ripple reduced to half end of 2011 TI 8: 2 sources – MSE and MKE

LHC Beam Operation Comitte24. April stability Horizontal TI 2 reduced, Vertical worse?; TI 8 the same. TI 2 TI 8 Avg. = mm Max = mm Avg. = mm Max = mm Avg. = mm Max = mm Avg.= mm Max = mm

LHC Beam Operation Comitte24. April Stability study March 2012 TI 2: Source matching the MSE – strength reduced by factor 2 TI 8: MSE –same as before, MKE source is not present (study done at beginning of year). MKE for TI 8 back again however now (CNGS?)

LHC Beam Operation Comitte24. April MKE 4 waveform Bunch-by-bunch variations in the horizontal plane of TI 8 are caused by a large ripple on the MKE 4 waveform  Kicker delay changed for 2012: 54  s  53.1  s  Waveform not flat, but 12 bunches more representative 12 bunch injection is more representative

LHC Beam Operation Comitte24. April Injection oscillations TI 8 H 3 April 2012 – first 144 bunch injections: Injection oscillations are good, small ripple 2 weeks later: MKE waveform ripple much more extreme  needs further investigation (Influence of CNGS cycles?)

LHC Beam Operation Comitte24. April  Model Independent Analysis (MIA) to search for sources: Fill 2458 (first 144 bunch injections) to 2539 (MD start), INJPHYS injections ~1 month Use saved YASP trajectories, effect of applied corrections are calculated and removed MIA is applied on the difference trajectories for stability study Studies are still ongoing.. Transfer Line Drifts

LHC Beam Operation Comitte24. April Long term variations: Many sources!! MSE is only one of them Large drifts also in the vertical plane! Preliminary TI 2 results

LHC Beam Operation Comitte24. April Preliminary TI 8 results Possible matches in horizontal plane: MKE, MSE, MBHA Search for sources ongoing.. Large drifts also in the vertical plane!

LHC Beam Operation Comitte24. April The 2012 newcomer: MSI point 2 Symptom: Trajectory bump at the end of the line(collimators), which is only correctable by the MSI Cause: Hysteresis? (FMCM test)  precycle will be prepared on pilot cycles Cause: Is there also noise? Logged current variations sometimes larger than at other times – corresponding kick in the order of our corrections MSI logged current Trim of ~ 10 urad Was removed again Noise introduced by what?

LHC Beam Operation Comitte24. April IQC BLM applied thresholds 1-12 bunches injected: IQC Ref x 12/288 > 12 bunches injected: IQC Ref x nBunches/288 } From 2011  2012: Same for 144 bunches Tighter for fewer bunches Noticed: not all types of losses scale with number of bunches, will be monitoring it

LHC Beam Operation Comitte24. April Summary Stability of the MSE in TI 2 has been improved Power converter team is continuing the effort: goal decrease ripple by another 50 %. Any results will be finally also moved to TI 8 MSE. Shot-by-shot stability issue of the MKE in TI 8 not present in stability study in March, but seems to have returned  further studies necessary MKE delay changed  steering on 12 bunches is now more representative for 144 bunch injection First drift studies show drifts in both planes, many sources  under investigations Problems at MSI point 2 discovered  will be pre-cycled. Noise investigations ongoing