Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

Al McBride MANAGER, AREA TRANSMISSION PLANNING Existing Import Interfaces: Transmission Transfer Capabilities and The Calculation of Tie Benefits DECEMBER.
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.
ROLE OF RPS CALCULATOR IN >33% RPS STATEWIDE TRANSMISSION PLANNING? 1.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
System Strength Discussion
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
1 R : LTPP Track II Workshop – Operating Flexibility Modeling Results Patrick Young Analyst, Generation & Transmission Planning California Public.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
OVERVIEW OF RPS CALCULATOR FUNCTIONALITY 1. Model Specification Model developed to provide plausible portfolios to CPUC LTPP and CAISO TPP to facilitate.
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
IOU LEAST COST-BEST FIT (LCBF): ALIGN WITH RPS CALCULATOR? 1.
Update on the 2015 Special Study June 29, 2015 Arne Olson, Partner Nick Schlag, Managing Consultant Gabe Kwok, Senior Consultant.
California Energy Commission Workshop Nuclear Power Plant Issues
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
IMPERIAL VALLEY CONFERENCE July 21, SOLICITATION RENEWABLES PORTFOLIO STANDARD.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Results of Geothermal Power Survey of Electric G&T Cooperatives Robert Putnam, CH2M HILL Bob Gibson, NRECA Steve Lindenberg, Lindenberg Consulting.
SAN MATEO COUNTY CCA TECHNICAL STUDY: OVERVIEW Community Choice Energy Advisory Committee June 25 th,2015.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Distributed Generation Benefits and Planning Challenges CREPC/SPSC Resource Planners’ Forum October 3, 2012 Arne Olson.
0 CPUC / CEC Workshop Reporting and Tracking GHG Emissions for a Load Based Cap PG&E Reporting Emissions and Estimating Emissions from Unspecified Purchases.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
Northwest Power and Conservation Council Slide 1 Direct Use of Natural Gas Economic Fuel Choices from the Regional Power System and Consumer’s Perspective.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
1 CPUC Avoided Cost Workshop Introduction and Overview.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Transmission for a 33% RPS Keith E. Casey Vice President Market and Infrastructure Development California ISO The Independent Energy Producers Association.
Transmission Planning at the California ISO September 10, 2015.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
BI Marketing Analyst input into report marketing Report TitleElectricity in California Report Subtitle State profile of power sector, market trends and.
Benefits of a Multi-year Resource Adequacy Program May 20, 2014 Karl Meeusen, Ph.D., Market Design and Regulatory Policy Lead Market and Infrastructure.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
SOUTHERN CALIFORNIA EDISON SM REC cost estimation April 23, 2010 Eric Lavik.
Ramping and Demand Shifting: A Case Study Tim Mount Dyson School of Applied Economics and Management Cornell University Demand Response.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
1 August 3, 2015 Environmental Considerations in RPS Calculator CEC IEPR Workshop.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Monterey Plaza Hotel October 8-10, 2007
Renewable Energy Transmission Initiative 2.0 Organizational Structure and Work Plan California Energy Commission and California Public Utilities Commission.
. PANC Annual Conference May 16, 2012 Progress on the California RPS.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
PacifiCorp & CAISO Regional Transmission Organization Presented by Scott Gutting President, Energy Strategies, LLC Independent Energy Producers Annual.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
1 NAESB Standards Request R04016 Summary of Strawman Proposal of The New Jersey Companies January 24-25, 2005.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Atcllc.com Using CEMS Data to Estimate Coal-Fired Plant FORs and Scheduled Maintenance Chris Hagman
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
RETI Workshop March 16, 2015 Arne Olson, Partner Lakshmi Alagappan, Sr. Managing Consultant Identifying High Value Renewable Resources.
TRMAC Meeting April 14, 2015 TRM EUI Measure Development Project.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
SM SOUTHERN CALIFORNIA EDISON® RETI 2.0 Workshop 03/16/2016 IOU Panel.
1 PLANNING CONFERENCE ON MARYLAND’S ENERGY FUTURE WILLIAM GAUSMAN VICE PRESIDENT ASSET MANAGEMENT JULY 25 – 26, 2007.
Status of the Planning Working Group’s (PWG) Efforts
Planning Tools Overview
Planning Tools Overview
Planning Reserve Margin
Presentation transcript:

Implications of Energy-Only Procurement on Transmission Planning CPUC Workshop: Revisions RPS Calculator v6.0 Robert Sparks Manager Regional Transmission - South February 11, 2015

Implications of Energy-Only Procurement on Transmission Planning The ISO fully supports procurement and planning for energy only generation We have been asked to comment on the potential implications of this, so that we ensure successfully meeting the renewable goal Page 2

Deliverability Overview FCDS generation –assumed to displace other remotely located FCDS –does not mean that the new generation can be delivered to the major load pockets. –still expected to result in congestion. EO generation –generation displacing other nearby generation. –expected to substantially add more congestion to the system FCD S Loa d FCD S EO Loa d All Resources Fully Deliverable Combination of Fully Deliverable & Energy Only Resources 3

Transmission Planning Traditionally, transmission planning in California focused on the summer peak load level with all transmission facilities in-service Allows transmission facilities to be removed from service for maintenance or upgrades during lower load period It also allows local generation capacity to be unavailable for maintenance conditions during the lower load period Transmission and generation capacity planning have been closely aligned. Generation planning appears to be changing direction Realigning transmission planning adds considerable complexity to the already complex transmission planning challenge. 4

Energy Only Transmission Planning Need much more focus on studies of the transmission system under lower load periods with transmission facilities out for routine maintenance or upgrades. Deliverability study process assumes all lines are in- service. Production simulation studies do not monitor the underlying subtransmission system. Reliability studies focus on worst case conditions which in the past are a much more limited set of system operating conditions than what can be expected in a future where generation planning is based on energy Page 5

Transmission Planning and System Operations The ISO market and system operating procedures have been proven to work very well under the conditions as they are currently planned Transmission planning is typically based on the assumption that the market and system operating procedures will be able to accommodate the system that will exist in the future The ISO and transmission and generation operators obviously need to ensure that this happens Page 6

33% Transmission Plan Based on renewable generation also contributing to capacity needs, and we have done that successfully to plan on getting to 33% Resulted in the need for much less new transmission than many in the industry expected 7

Energy Planning & Procurement Adds considerable complexity ISO is committed to supporting this approach. Expected to be iterative. Production simulation models are reasonably accurate only when they are analyzing system operating conditions that have been thoroughly studied using detailed powerflow and stability study models Generation needs to be studied as a portfolio to reasonably estimate how much of the energy can be expected to be delivered from a particular zone 8