ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.

Slides:



Advertisements
Similar presentations
F October 4, 2001David Finley to FARDOG at FermilabSlide 1 Status of X-Band Structures Fabrication Our First X-Band Structure Progress of RF Factory at.
Advertisements

ENGINEERING DESIGN OF RF STRUCTURES
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) CLIC Workshop 2014 CLIC choke mode structure and X-band activities.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
ABSTRACT We report on the suppression of long-range wakefields in the main linacs of the CLIC collider. This structure operates with 2π/3 phase advance.
INVESITGATION OF AN ALTERNATE MEANS OF WAKEFIELD SUPPRESSION IN CLIC MAIN LINACS CLIC_DDS.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
18/6/2007 M.Taborelli, TS-MME Structure fabrication techniques and possibilities M.Taborelli Disk structures Quadrant structures ….most of it inspired.
CLIC RF structure master schedule and CERN production
INVESITGATION OF AN ALTERNATE MEANS OF WAKEFIELD SUPPRESSION IN CLIC MAIN LINACS CLIC_DDS.
Status of the 201 MHz Cavity and Coupling Coil Module Steve Virostek Lawrence Berkeley National Laboratory MICE Video Conference March 10, 2004.
ABSTRACT A damped detuned structure (DDS) for the main linacs of CLIC is being studied as an alternative design to the present baseline heavily damped.
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /13 CLIC_DDS study
CLIC MAIN LINAC DDS DESIGN AND FORTCOMING Vasim Khan & Roger Jones V. Khan LC-ABD 09, Cockcroft Institute /14.
Wakefield suppression in the CLIC main accelerating structures Vasim Khan & Roger Jones.
Design of Standing-Wave Accelerator Structure
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /21 CLIC_DDS_HPA study
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /24 CLIC_DDS study
ABSTRACT The main accelerating structures for the CLIC are designed to operate at 100 MV/m accelerating gradient. The accelerating frequency has been optimised.
2 nd collaboration meeting on X-band Accelerator Structure Design and Test-Program Structure fabrication Comparative analysis of disk and quadrant manufacture.
Walter Wuensch CLIC project meeting, 31 March 2015 Accelerating structure program: design and testing.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
Investigation threads on fabrication technologies for the CLIC X-band Accelerating Structures C. Rossi on behalf of the CLIC X-band Activity Thanks for.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
Structures design R&D program Alessandro D’Elia-UMAN/CI and CERN On behalf of Roger M. Jones 1.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
1.3GHz Input Coupler for ILC
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
The CLIC accelerating structure development program Walter Wuensch CARE05 23 November 2005.
MICE RF Cavity Measurements Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory July 8, 2010 Rutherford Appleton Laboratory, UK.
PASI OsC meeting 12th July 2012
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
5 th CLIC-ACE Structure production in laboratories and industries G. Riddone, 02/02/2010 (contribution from KEK/SLAC colleagues) 1.
Progress of X-Band Accelerating Structures LINAC10, Tsukuba 17 Sep T. Higo (KEK)
Bellerophon on Pegasus S. Atieh RF structure development meeting.
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
CLIC accelerating structures: study of the tolerances and short range wakefield considerations R. Zennaro CERN.
TD26CC PLANS FROM CIEMAT Laura Sánchez on behalf Electrical Engineering Group of CIEMAT.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Optimization of CLIC-G structure & Design of CLIC open structure Hao Zha, Alexej Grudiev (CERN) Valery Dolgashev (SLAC) 27/01/2015.
Tolerances coming from RF Alexej Grudiev 24 Nov 2014 X-band accelerating structure review.
MICE RFCC Module Update Steve Virostek Allan DeMello Lawrence Berkeley National Laboratory MICE CM27 at RAL, UK July 8, 2010.
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
Damped and Detuned Structures for CLIC The University of Manchester The Cockcroft Institute 4/10/2013I.Nesmiyan1 Acknowledgements to colleagues at CERN,
A. D’Elia 1,2,3, T. Higo 4, V. F. Khan, R.M. Jones 1,2, A. Latina 3, I. Nesmiyan 1,2, G. Riddone 3 1 School of Physics and Astronomy, The University of.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Two-beam module layout
ISTCInternational Science and technology Center, MoscowOfficial Coordinator BINPBudker Institute of Nuclear Physics of Siberian Branch of Russian Academy.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC_DDS study
Physics design on Injector-1 RFQ
Summary of the test structure design
Update of CLIC accelerating structure design
Recent high-gradient testing results from the CLIC XBoxes
Presentation transcript:

ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A. D’Elia²³⁴, V. F. Khan³⁴, R. M. Jones³⁴ 1 – JINR, Dubna, Russia; 2 - CERN, Geneva, Switzerland; 3 – University of Manchester, UK; 4 – Cockroft Institute, UK. Abstract A Damped Detuned Structure (DDS), known as CLIC_DDS_A [1], has been designed and is presently under construction. The wakefield in DDS structures is damped using a combination of detuning the frequencies of beam-excited higher order modes and by light damping, through slot-coupled manifolds. The broad principles of the design are similar to that used in the NLC/GLC [2]. This serves as an alternative to the present baseline CLIC design which relies on heavy damping. CLIC_DDS_A is conceived to be tested for its capacity to sustain high gradients at CERN. This structure operates with a 120 degrees phase advance per cell. We report on fabrication details of the structure consisting of 24 regular cells plus 2 matching cells at both ends, diffusion bonded together. This design takes into account practical mechanical engineering issues and is the result of several optimizations since the earlier CLIC_DDS designs. REFERENCES [1] V. F. Khan, A. D’Elia, R. M. Jones, A. Grudiev, W. Wuensch, R. Zennaro “Recent Progress on a Manifold Damped and Detuned Structure for CLIC”, IPAC10 [2] R.M. Jones, et al., 2006, Phys. Rev. STAB, 9, [3] Juwen W. Wang et al. “Fabrication Technologies of the High Gradient Accelerator Structures at 100MV/m Range”, IPAC10. RF Design Inputs Mechanical Design of RF Disks Cooling System Tuning System Main features - Thick cylindrical copper disks; - Four radial holes; - Elliptical profiled iris diaphragm; - Sharp edge blending with variable radius. Input Disk Matching Disk #1. Regular Disks. Matching Disk #2 Output Disk Push-Pull - Integrated tuning system; - Push-Pull Principle [3]; - 4 tuning studs inside each RF disk. - Two parallel cooling circuits; - 2 twin cooling blocks each of 250 mm long; - Cooling block is being pre- assembled with tubes and cap by the use of vacuum brazing; - Pre-assembled cooling blocks are brazed directly onto the accelerating structure body. Water IN Water OUT Assembly sequence (bonding and brazing) Diffusion bonding of high- precision RF disks under H 2 at about 1035°C. Disk set Tuning Hammer Tuning Stud Vacuum Cell volume RF parameters table and diagram [1] ∆T 35*Sc Esur Eacc Pin Dashed curves : Unloaded condition Solid curves: Beam loaded condition 1. Disk stack 2. Couplers -Vacuum brazing of two parts of the coupler at about 1045°C; - Machining of brazed coupler surface for installation of RF flanges; - Vacuum brazing of stainless steel adapter, RF and vacuum flanges at about 1035°C. 3. Final Assembly Vacuum brazing of the bonded disk stack, couplers subassemblies, cooling blocks and tuning studs at about 1020°C. Vacuum Flange Beam Pipe RF flange Coupler Body Coupler Cover Manufacturing Strategy ACKNOWLEDGMENT The development described in this paper is the result of the international collaboration. The authors wish to thank all of the members of the collaboration for their valuable contribution. The manufacturing of the accelerating structure is proceeding in two steps. The fist step is the production of four prototypes of the regular RF disk. Three of these disks are passing the bonding test and the last prototype disk undergoes the dimensional control. Based on test results the whole structure is being produced in the second step. Section cut Reverse side Top side Tolerancing - Cell shape accuracy mm; - Flatness accuracy mm; - Cell shape roughness Ra Cooling Block Cooling Tube Cap Dimensional control results (provided by VDL ETG ). On the left: Iris profile accuracy. Measured with 3D CMM, Zeiss UPMC 850 Carat. On the right: Surface roughness. Measured with White light Interferometer, Zygo NewView 5032 Iris area and profile Crucial geometries Drawing of Regular RF Disk