Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall.

Slides:



Advertisements
Similar presentations
BEB Transport und Speicher Service GmbH, Hannover Capacity Development NW Region Capacity Development in the North-West.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Developments Transmission Workgroup 3rd November 2011.
15 th September 2013 Enagás and TIGF Information to NRAs.
1 Open Season Development of new capacities between France and Luxembourg NW-GRI, September - 21 st, 2010.
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
26 November th Stakeholder Group Meeting of the Gas Regional Initiative North-West (GRI NW) Brussels, 26 November 2010 Mark Hobbelink Wiekens, GTS.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
Transparency Workstream Gas Regional Initiative North West Region By: Cemil Altin Workstream Leader Bonn Workshops 8-9 February 2007 NRA logo.
European Transparency Requirements – Draft Mod Transmission Workstream 4 th September 2008.
GRI NW TRANSPARENCY PROJECT Olaf Islei OFGEM RCC 13 May 2009.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
NW GRI Investment Project Virtual Test Case Adam Cooper - EFET.
Sound Investment Climate? Jacques Laurelut GTE President CEO of GRTgaz Bratislava, 28 September 2006.
Aggregate Balancing November 17, Current Process Multiple Contracts, Multiple Nominations, Multiple Imbalances and the potential for Multiple Cashouts.
Review Group 291 – Balancing Arrangements Default Cashout Workshop 3 – 21 st June 2010.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
New tariffs system in France GTE 23 rd October 2003 Jacques Laurelut.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
TNC Realization of Transmission Contracts Warsaw, 16 October 2012 the system, that connects.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Transparency GRI SSE -- 7th Stakeholder Group Meeting Vienna, 16 October 2009 Andrea Ćirlićová GTE+ Senior Adviser.
Gas Regional Initiative North West Region - Short Term Capacity 7th Stakeholder Group Meeting The Hague – 6 and 7 May 2010.
Bonn Workshops 8 and 9 Feb Balancing workstream.
The next steps for regional co-operation GRI NW Stakeholder Group 25 November 2011.
Gas Regional Initiative North-West Transmission Transparency Second Mini Transparency Workshop Transmission Transparency Project GRI North-West Operators‘
Gas Regional Initiative North-West Transmission Transparency Transmission Transparency Project GRI North-West Operators‘ Group Stakeholder Group Meeting.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
Vienna, 24 november GRI SSE: work done so far 1. Assessment summary on selected transportation routes ongoing 2. Preliminary paper on hubs as regional.
GRI NW Investment Cross border investment Dublin 19 May Bid Capture Process Adam Cooper & Mike Young.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
Gas balancing interactions: Proposal for case studies Cemil Altin (Ofgem)
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
GRI NW TRANSPARENCY PROJECT Transparency Workshop 31 March 2009.
1 GTE Transparency Platform GIE Annual Conference Madrid, 22/23 November 2007 Paolo Mosa GTE Vice President.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project (I1) Conclusions workshop Dublin.
Gas Regional Initiative – North West Region Paris Workshop 11 May 2007 Workshop on Interconnections & Primary Capacity Market Kick-off Meeting on IP 14.
Gas Regional Initiative North-West Transmission System Operators Page 1Transmission Transparency, Transmission Transparency Project GRI North-West.
North West Region Gas Regional Initiatives Regulatory Co-ordination Workshop 23 rd April 2007.
Click to edit Master title style 1 Neta Meidav Manager, Ofgem GRI NW 9 th Stakeholder Group Meeting 25 November 2011, Rotterdam GRI NW Transparency Project.
Bonn Workshops 8 and 9 Feb Gas Regional Initiative North West Region Balancing workstream Workstream leader: Cemil Altin (Ofgem)
1 Open Seasons between France and Belgium GRTgaz Fluxys Gas Regional Initiative North-West Stakeholders Meeting 7 May 2010.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
The Regional Initiatives deliver concrete results in the regions but will the regions join up? Ms Asta Sihvonen-Punkka ERGEG’s Electricity Focus Group.
1 Dublin 23/24 April CONCLUSIONS Regulatory Co-ordination Responses to Deliverables 3 and 4 due by 8 th May Papers redrafted to take comments into account.
European Developments Transmission Workgroup 3 rd May 2012.
7th Stakeholder Group meeting The Hague – 07 May 2010 Gas Regional Initiative Region North-West Secondary Markets Betsy Annen, CRE Bernhard Schaefer, E.ON.
Work Plan and Key Deliverables 2 November WORK PLAN.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative North-West
New transparency guidelines
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
GIE Annual Conference Recent developments in Transparency in the EU
Nordel's comment on transparency Juha Kekkonen Fingrid
2009 TSO Transparency Gas Regional Initiative North-West
GRI NW TRANSPARENCY PROJECT
GTE Transparency Platform
Transparency Project GRI NW Region.
European Transparency Requirements
EURELECTRIC transparency requirements
Gas European Network Code Implementation
Presentation transcript:

Gas Regional Initiative North-West Gas Balancing Dublin Workshop 24 th April 2007 Steve Pownall

Agenda Introduction Approach Objective Gas Balancing – Information Templates General considerations Next steps

Introduction NW GRI Gas Balancing discussions at Bonn identified key areas for further consideration; gas balancing interactions between adjacent networks provision of gas balancing-related information Gas Balancing Enabler Group has initiated work in both key areas; gas balancing interactions led by stakeholders information provision (templates) led by lead operator

Approach GTE operators agree in principle that information pertaining to gas balancing is important to shippers and the wider market Guidelines for Good Practice for Gas Balancing (GGPGB) used as the basis for this approach GTE operator sub-group: Fluxys (Belgium), GRTgaz (France) and National Grid (UK) have considered their existing information provision to the market and shippers Operator sub-group has identified several categories of information that could be provided by other operators

Information is already available!!! A wide range of gas balancing information is already available to the market, for example, please access the following operator websites: Fluxys: GRTgaz: National Grid: …. but operators need the full co-operation of the stakeholders to identify further improvements

Proposal – Objective (1) To enhance and improve gas balancing data provision and its availability to the GRI NW market; Increase transparency Apply consistency Provide access

Proposal – Objective (2) Stakeholders and Operators need to agree on the principles of Gas Balancing information templates Agreement of principles will ensure a consistent approach across NW GRI Detailed requirements/publication of the templates to be defined and agreed between the market and operators (or other data owners) Reporting parameters/publication are dependent on individual operator balancing regime/periods and ownership of the primary source data

Proposal - Information Templates Market-related (1) - for each TSO network; Commercial information standard contract information, for example, generic transportation agreements Gas balancing tariffs / charging mechanisms Derivation/application of cashout prices / tariffs

Proposal - Information Templates Market-related (2) - for each TSO network; Total System Network Imbalance (aggregate) Date/time (publication date, balancing period) Aggregate network supply Aggregate network demand Aggregate network net imbalance Aggregated data would include (but not disclose) all relevant system network entry/exit points

Proposal - Information Templates Market-related (3) - for each TSO network; Total System Network Demand (aggregate) Date/time (publication date, balancing period) Aggregate system network demand (consumption) Forecast Aggregate system network demand (consumption) Aggregated data would include (but not disclose) all relevant system network exit points

Proposal - Information Templates Market-related (4) 6h Total System Network Demand (Forecast) Total System Network Demand (Actual) Total System Network Imbalance 1) Aggregated Supply 2) Aggregated Demand 3) Aggregated Net imbalance

Proposal - Information Templates Shipper-specific (1) - for each TSO network; Shipper aggregated imbalance Date/time (publication date, balancing period) Aggregate of shipper entry (supply) points + exit (consumption) points and net imbalance Aggregated imbalance information might be based on shipper nominations (renominations), and/or allocations For the avoidance of doubt, this confidential data would only be published to the relevant shipper

Proposal - Information Templates Shipper-specific (2) - for each TSO network; Shipper Demand (consumption) Date/time (publication date, balancing period) Forecast Demand * Actual Demand For the avoidance of doubt, this confidential data would only be published to the relevant shipper * Only where TSOs undertake demand forecasting on behalf of shippers

Proposal - Information Templates Shipper-specific (3) – for each TSO network Shipper charges Imbalance charges Scheduling charges Other balancing penalties For the avoidance of doubt, this confidential data would only be published to the relevant shipper

Proposal - Information Templates Shipper-specific (3) - for each TSO network 6h Shipper Demand (Forecast)(*) Shipper Demand (Actual) (*) Total System Network Imbalance 1) Aggregated Supply of shipper (∑ of Entry-points) 2) Aggregated Demand of shipper (∑ of Exit-points) 3) Aggregated Net imbalance of shipper ( Entry – Exit ) (*) where TSOs undertake demand forecasting on behalf of shippers Imbalance charges Scheduling charges Other penalties Day of Month M Month M+1

General considerations Reporting parameters Frequency of publication, units (GWh, TWh, kWh) Presentation of information (report, data centric) Details to be agreed on an individual operator/market basis Technical Type of delivery platforms (web-based, public and/or private) Linkages/interfaces Data refresh/validation IS development/implementation timescales Funding of IS development/ongoing costs Market access to information free, subscription or alternative funding Confidentiality and potential liability issues

Next steps Gain support from the NW Stakeholder Group that the proposal for the information template(s) is appropriate Enabler Group / GTE operator sub-group to investigate further provision for the market within the NW region Enabler Group, in conjunction with GTE operators to establish project / implementation plans for the progression of bench marked templates