Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Workshop on Inventories and Projections of Greenhouse Gas Emissions from Waste under WG 1 and 2 of the Climate Change Committee Presentation of UNFCCC.
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
Will CO2 Change What We Do?
ww.neprisoe.org CDM Methodologies Carbon Markets – CDM project development 8. August 2011 Jørgen Fenhann.
Task Force on National Greenhouse Gas Inventories Tier 3 Approaches, Complex Models or Direct Measurements, in Greenhouse Gas Inventories Report of the.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Baseline Methodologies for Industrial End-Use Efficiency World Bank Workshop (Montreal, 3 December 2005) “CDM Methodologies & Technical Issues Associated.
Northwest Power and Conservation Council Effects of Alternative Scenarios on Sixth Power Plan Northwest Power and Conservation Council Whitefish, MT June.
The Case for Early Action Pew Center Early Action Conference September 13-14, 1999 Dale Landgren Asst. Vice President, Business Planning.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
A Greenhouse Gas Mitigation Guide for Electric Utilities Bren School of Environmental Science and Management 02 November 2004.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP IPCC Good Practice Guidance Simon Eggleston Technical.
Baseline methodologies for grid- connected electricity – Context and Introduction to the Combined Margin Baseline Calculation Martina Bosi, World Bank.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
Introduction 10 minutes Objectives 30 minutes Example, Case Study 10 minutes Group Discussion 30 minutes Exercise 10 minutes Conclusions 10 minutes.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
A. N. Gichu Kenya Forest Service REDD+ and REDD Readiness.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #4 July 30, 2008 SCAQMD Diamond Bar, California.
Baseline Methodology ARNMB0010 Xiaoquan Zhang and Bernhard Schlamadinger.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Expertise everyday, everywhere Verifying Sinks and Bio-energy Projects Irma Lubrecht Société Générale de Surveillance.
CDM Methodology World Bank Carbon Finance: Interpretations and Approaches to Baselines, Monitoring and Calculation of Emission Reductions Bonn, 6 June.
LULUCF Concepts Training Seminar for BioCarbon Fund Projects February 8 th 2008 Timothy Pearson and Sarah Walker Winrock International.
Challenges for district heating methodologies Worldbank Workshop on CDM Methodologies 5 December 2005 Lambert Schneider.
CDM Project Developers Workshop.  Boundaries & Leakage  Calculating emissions reductions  Any other issues Session II.
CDM Project Developers Workshop.  Baselines – what, types of baselines, baseline scenarios, baseline emissions.  Additionality – what, why, how  Establishing.
World Bank - Forest Carbon Partnership Facility: REDD+ Readiness and Country Needs Alexander Lotsch Forest Carbon Partnership Facility The World Bank
1 Holly Krambeck, Carbon Finance Unit; World Bank 27 May 2010 Using Inventory Tools to Support Energy Efficient Cities Citywide Methodology Transport Module.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
1 Methodologies, Technical Resources and Guidelines for Mitigation Festus LUBOYERA and Dominique REVET Programme Officers UNFCCC secretariat
CDM - PDD- Thu duc Plant Sep., 11, 2003 Preliminary findings of PDD– CDM model project for Thuduc fuel switching plant Master Nguyen Thi Kim Lien International.
Practical Experience with Small-scale Projects: Issues and Suggestions Johannes Heister, Lasse Ringius Carbon Finance Unit, World Bank Bonn, 9-10 March.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
1 The Combined Margin Approach: Issues and Options Michael Lazarus, SEI/Tellus World Bank Power Sector Workshop Caesar Park Hotel, Buenos Aires December.
Case Study2: Reforestation Project Using Native Species Around AES-Tiete Reservoirs ARNM0002 Comments on Baseline Methodology Fourth Regional Workshop.
AIT Baselines and Additionality Sudhir Sharma Asian Institute of Technology Bangkok, Thailand 24 th March 2004.
EMMER INTERNATIONAAL ARWG tools and consolidation of methodologies Igino Emmer.
Economics of electricity production and competitiveness of nuclear energy Prof. Dr.-Ing. Alfred Voß Institute of Energy Economics and the Rational Use.
WMO UNEP INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE NATIONAL GREENHOUSE GAS INVENTORIES PROGRAMME WMO UNEP Real Emissions Estimates William Agyemang-Bonsu.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
1 Basics of CDM Development Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
UNEP Collaborating Centre on Energy and Environment Capacity Development for CDM - Egypt, Second National Workshop - Phase II - Cairo, January 2004.
Permit supply from the CDM Nico van der Linden ECN Policy Studies, the Netherlands.
El Gallo Hydroelectricity Project PDD Analysis
Guatemala: El Canada Hydroelectric Project Meth Panel decision on its proposed baseline methodologies May 2003.
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
CD4CDM Philippines Salvador da Bahia Landfillgas Project (PDD Presentation)
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. UNDP MDG Carbon RBEC EFP.
Summary of the Harvested Wood Products Workshop Rotorua, New Zealand, February 2001 Justin Ford-Robertson and Angela Duignan.
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, Capacity Development for CDM Cairo, March 31 & April 1,
29-Mar-2011 Working Group on Environmental Accounts Climate Change: Reflection about the role of Eurostat in EU mitigation and adaptation policies Working.
Some open questions in power sector methodology Sandra Greiner Carbon Finance Unit The World Bank World Bank methodology event Dehli,
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Case Study: Gemina Rice Husk Project Nicaragua (Scenario Analysis and Small-Scale Simplified Methodologies) Carbon Finance Unit The World Bank 22 October.
EU Workshop on Uncertainties in GHG inventories Uncertainty estimation of MS Anke Herold, ETC-ACC Suvi Monni, VTT Technical Research Centre, Finland Sanna.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Case study 1 Review comments on Baseline Methodology Waste heat use project Prepared by Nguyen Van Hanh Vietnam.
Conservativeness in baselines WB workshop for CDM project developers Buenos Aires, 5 December 2004 Lambert Schneider.
India project not used. Summary: Areas of Potential Cooperation to Realize Sinks Potential Perform pilot project analyses: issues. Stimulate development.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Carbon Neutrality – A Competitive Advantage International Congress ‘Environmental and Energy Principles of the Sustainable Development’ Sofia, May 7, 2012.
Baseline approaches and methodologies: interpretation of Para 48(a)-(c) M&P Buenos Aires, – December 5 th, 2004 Johannes Heister – World Bank, Carbon Finance.
Presentation title Methodological tool and data for the development of a SB for the emission factor of an electricity system CDM Standardized Baselines:
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
ARNM0002 REFORESTATION OF GRASSLANDS WITH NATIVE SPECIES
Perspective on consolidated methodologies & additionality tool
Meeting with Member State experts on Life Cycle Assessment of fuel in relation to Article 7a of proposal COM 2007(18) 17 July 2007 European Commission.
Presentation transcript:

Case Study 1: Comments on Transparency and Conservativeness Alan Silayan klima-Climate Change Center

Transparency and Conservativeness In the calculation of baseline values In the calculation of baseline values In assumptions and uncertainties relating to these calculations In assumptions and uncertainties relating to these calculations Operating assumptions Operating assumptions

Transparency of Case I Method is relatively simple compared to other methodologies (ie. Afforestation and Reforrestation). Method is relatively simple compared to other methodologies (ie. Afforestation and Reforrestation). Baseline I uses a simple ‘Average Operation Margin’ calculation. (instead of simple OM, Simple adjusted OM, Dispatch Data Analysis OM as other options suggested by ACM0002) Baseline I uses a simple ‘Average Operation Margin’ calculation. (instead of simple OM, Simple adjusted OM, Dispatch Data Analysis OM as other options suggested by ACM0002) Use of existing actual or historical emissions (assumption: calibrated instruments) Use of existing actual or historical emissions (assumption: calibrated instruments) For baseline 1: all data taken from steel operations / power plants and IPCC data guidelines For baseline 1: all data taken from steel operations / power plants and IPCC data guidelines For baseline 2: data taken from public database and IPCC guidelines and steel operations For baseline 2: data taken from public database and IPCC guidelines and steel operations

Transparency of Case I Only one source of data for steel operations data and power plant data. Only one source of data for steel operations data and power plant data. Comment: Preferable third party data Comment: Preferable third party data Comment: Operation Margin and Build Margin inadequately defined therefore baseline II is not as intuitive as baseline I. Comment: Operation Margin and Build Margin inadequately defined therefore baseline II is not as intuitive as baseline I. Assumption: data is readily available and is reliable for use by the validator / verifier. Assumption: data is readily available and is reliable for use by the validator / verifier.

Conservativeness of Case I Ultimate effects of the CDM project is uncertain. Thus, conservative assumptions that are likely to underestimate rather than overestimate project reductions should be adopted. Ultimate effects of the CDM project is uncertain. Thus, conservative assumptions that are likely to underestimate rather than overestimate project reductions should be adopted. Conservativeness also depends highly on accuracy of data provided. Conservativeness also depends highly on accuracy of data provided. Project assumes that steel mill will operate with a consistent supply of BOF waste gases - ie. BOF gas stored in the Gas Holder will be able to consistently supply the fuel demands of the existing power plant and/or proposed power plant. Project assumes that steel mill will operate with a consistent supply of BOF waste gases - ie. BOF gas stored in the Gas Holder will be able to consistently supply the fuel demands of the existing power plant and/or proposed power plant.

Conservativeness of Case 1 Net Calorific Value (TJ/10 3 tons); Carbon Emission Factor (tC/TJ) and Oxidation Factors taken from IPCC guidelines Net Calorific Value (TJ/10 3 tons); Carbon Emission Factor (tC/TJ) and Oxidation Factors taken from IPCC guidelines “All values of the parameter to be used for computation of emissions should be taken as maximum, minimum or 95% of spatial and temporal values in a way that demonstrates that the emission reduction value is conservative and not overstated/ doubly accounted” – NMB sec. G “All values of the parameter to be used for computation of emissions should be taken as maximum, minimum or 95% of spatial and temporal values in a way that demonstrates that the emission reduction value is conservative and not overstated/ doubly accounted” – NMB sec. G Potential impacts of uncertainties must be at least qualitatively understood (ie. Economic factors) – appropriate decisions in the interest of conservatism be made – NMB sec. F (assessment of uncertainties) Potential impacts of uncertainties must be at least qualitatively understood (ie. Economic factors) – appropriate decisions in the interest of conservatism be made – NMB sec. F (assessment of uncertainties)

Conservativeness of Case I From ACM0002: possible leakage From ACM0002: possible leakage Power plant construction Power plant construction Fuel handling (extraction, processing and transport) Fuel handling (extraction, processing and transport) Land inundation Land inundation “Project participants need not consider these emission sources as leakage in applying this methodology”. “Project participants need not consider these emission sources as leakage in applying this methodology”.

Thank You