ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK,

Slides:



Advertisements
Similar presentations
J. Branlard ALCPG11 – March 2011 – Eugene OR, USA Results from 9mA studies on achieving flat gradients with beam loading P K |Q L studies at FLASH.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
April SCRF Meeting FNAL08 S.Fukuda 1 HLRF Summary and Work Assignment S. FUKUDA KEK.
SCRF Monthly WebEx Meeting June 2, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Marc Ross Nick Walker Akira Yamamoto XFEL – based HLRF scheme 07 Sept 2010 BAW 1 - Backup HLRF 1.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
John Carwardine 5 th June 2012 Developing a program for 9mA studies shifts in Sept 2012.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
Plan for SCRF BTR January , 2012 Akira Yamamoto, Marc Ross, and Nick Walker (PMs) Jim Kerby, and Tetsuo Shidara (SCRF-APMs) Presented and discussed.
ILC-BAW1 Interim Summary and Further Plan Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 9, ,
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
John Carwardine 21 st October 2010 TTF/FLASH 9mA studies: Main studies objectives for January 2011.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
ILC-BAW1 Summary and Recommendations Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 10, ,
19-May-11 PAC Mtg - Taiwan Global Design Effort 1 Barry Barish PAC Meeting Academia Sinica, Taiwan 19-May-11 GDE Director’s Report Grooved Insert for CesrTA.
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
John Carwardine 13 th April, 2011 Report on the 9mA program.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
John Carwardine (Argonne) First Baseline Allocation Workshop at KEK September 2010 Experience from FLASH ‘9mA’ experiments Gradient and RF Power Overhead.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
GDE meeting Beijing (Mar.27, 2010) 1 DRFS LLRF system configuration Shin MICHIZONO KEK LLRF lack layout for DRFS DRFS cavity grouping HLRF requirements.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
1 LLRF requirements/issues for DRFS Shin MICHIZONO (KEK) BAW1 (Sep.8, 2010)
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Nan Phinney SLAC ILC Worldwide Event, Fermilab, June 12, 2013 (Many slides courtesy of Marc Ross, Akira Yamamoto, Barry Barish) ILC Accelerator A 25-year.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
SCRF WebEx Monthly Meeting Agenda and Reports from PM
SCRF Monthly WebEx Meeting May 6, 2010
dependence on QL can not longer be seen
SCRF Monthly WebEx Meeting Sept. 22, 2010
Studies Leader Report: 9mA webex meeting, 15th March 2011
RF operation with fixed Pks
BAW Prep S1 Global Status Pilot Plant Status
Yamamoto WG3: ML-SCRF Parallel Session,
2. SCRF General Preparation for the AD&I Preparation for AAP Review
WG3: Main Linac SCRF(cavity,cryomodule)
Nick Walker (DESY) EU GDE Meeting Oxford
Barry Barish Paris ICHEP 24-July-10
Summary of the maximum SCRF voltage in XFEL
Presentation transcript:

ILC-BAW1 ML Accelerator Operational Gradient Introduction Akira Yamamoto, Marc Ross and Nick Walker GDE Project Managers Reported at BAW1, held at KEK, Sept. 10, , A. YamamotoBAW1 ML Cavity Op. Gradient1

, A. Yamamoto BAW1 ML Cavity Op. Gradient 2 Baseline Assessment WorkShops WhenWhereWhat WAB 1Sept. 7-10, 2010 KEK1.Accelerating Gradient 2.Single Tunnel (HLRF) WAB 2Jan 18-21, 2011 SLAC3.Reduced RF power 4.e+ source location Baseline Assessment Workshops Face to face meetings Open to all stakeholders Plenary

Time-Table / Agenda (Sept. 9) Day Am/pm SubjectConvener/presenter 9/9Cavity: Gradient R&D and ML Cavity Gradient R. Geng/A. Yamamoto 9:00Introduction and Current Status - Technical address for the 2 nd part of WS - Overview from RDR to R&D Plan 5 - Progress of cavity gradient data-base/yield Chair: M. Ross - A. Yamamoto - R. Geng - C. Ginsburg 10:45 R&D Status and further R&D specification - Fabrication, testing, & acceptance for XFEL/HG - R&D expected in cooperation w/ vendors - R&D w/ a pilot plant w/ vendor participation Chair: K. Yokoya - E. Elsen - M. Champion - H. Hayano 13:30Short-tem R&D and Specification - Field emission and R&D strategy - Gradient, Spread, Q0, Radiation: R&D specification, standardization Chair: C. Pagani - H. Hayano - R. Geng 15:45Long-term R&D ACD subjects and goals - Seamless/hydro-forming, Large Grain, Cavity shape variation, VEP, Thin Film, - Further R&D toward TEV/ML - Discussions for Cavity R&D and Recommendations Chair: A. Yamamoto - R. Rongli to lead discussions , A. YamamotoBAW1 ML Cavity Op. Gradient3

Cavity Gradient Progress ILC-GDE Cavity Database Team Progress report – C. Ginsburg et al. – as of June 30, , A. YamamotoBAW1 ML Cavity Op. Gradient4

Gradient Spread and Standard Deviation , A. YamamotoBAW1 ML Cavity Op. Gradient5 As of June 30, 2010 Average: ~ 36 MV/m at gradient cut at 25 MV/m Standard deviation: ~ 5 MV/m gradient cut at 25 MV/m

, A. YamamotoBAW1 ML Cavity Op. Gradient6 Basic R&D Efforts in TDP-2 VEP

Time-Table / Agenda (Sept. 10) DayAm/pmSubjectConvener/presenter 9/10 ILC accelerator gradient and operational margin A. Yamamoto and J. Kerby 9:00 Gradients from VTS to Operation - Introduction: Overview on ILC gradient specification at each testing / operation step - Terminology definition - Operational results from VT/HTS/CM tests in data base - Operational results from STF VT/CM tests at KEK Chair: H. Hayano - A. Yamamoto - M. Ross - C. Ginsburg - E. Kako 10:30 Operational margin - Lorentz Force Detuning and Effects on op. margin - Comments from LLRF and Beam Dynamics - Comments onAcceerator Operation gradient margin Chair: N. Toge - E. Kako - (K. Kubo/C. Michizono) - N. Walker 13:30 Cost Impacts - Reminder on cost effects - List of systems / technical components affected by gradient specification change - A plan to prepare for communication w/ industries Chair: N. Walker - P. Garbincius - J. Kerby - A. Yamamoto 15:15 General Discussion and recommendation - General discussions - Summary and recommendations Chair: A. Yamamoto - All 17:00 - End , A. YamamotoBAW1 ML Cavity Op. Gradient7

ILC ML Cavity Gradient R&D Milestones and ML operational Specification , A. YamamotoBAW1 ML Cavity Op. Gradient8

R&D Milestone in RDR revised in Rel-5 StageSubjectsMilestones to be achieved Year S09-cell cavity 35 MV/m, max., at Q0 ≥ 8E9, with a production yield of 50% in TDP1, and 90% in TDP2 1), 2) 2010/ 2012 S1Cavity-string 31.5 MV/m, in average, at Q0 ≥ 1E10, in one cryomodule, including a global effort 2010 S2 Cryomodule- string 31.5 MV/m, in average, with full-beam loading and acceleration , A. YamamotoBAW1 ML Cavity Op. Gradient9

ILC Accelerator, Operational Gradient Strategy for Average Accelerating Gradient in the ILC operation: – Overview and scope of 'production yield' progress and expectations for TDP, including acceptable spread of the gradient needed to achieve the specified average gradient, – Cavity Gradient, Q0, and Emitted Radiation in vertical test, including the spread and yield, – Cryomodule Gradient, Cryogenic-load and Radiation, including the gradient spread and operational margin with nominal controls, – ILC Accelerator Gradient, Cryogenic-load and Radiation, including the gradient spread and the operational margin with nominal controls – Strategy for tuning and control, including feedback, control of ‘Lorentz force detuning’, tolerances and availability margin, – Impact on other accelerator systems: CFS, HLRF, LLRF, Cryogenics, and overall costs , A. Yamamoto10BAW1 ML Cavity Op. Gradient

A possible balance in ILC ML Accelerator Cavity Specification , A. YamamotoBAW1 ML Cavity Op. Gradient11 Single 9-cell cavity gradient String Cavity gradient in cryomodule w/o beam String cryomodule gradient in accelerator with beam 35 MV/m, on average w/ spread above a threshold > 33 MV/m, on average (or to be further optimized) 31.5 MV/m, on average (or to be further optimized)

ILC-ML SCRF Cavity Gradient Specifications proposed, based on R&D Effort and Milestone/Goals Cost-relevant design parameter(s) for TDR ML cavity gradient Specification R&D Mile-stone Relevant R&D Programme Mass production distribution (models) S0 9-cell Cavity Gradient in vertical test 35 MV/m, average - Spread: 28 – 42 MV/m (+/- 20 % or less) 35 MV/m at 90 % yield including 2 nd pass, (eq. > 38 MV/m, average: TBD) S0 Cryomodule Operational Gradient > 33 MV/m, average34 MV/m, average Oprational margin = 3 %** S1 ML Operational Gradient 31.5 MV/m avg - Spread: 25 – 38 MV/m (+/- 20 % or less: TBD) 31.5 MV/m, average Op. G. limit = 1.5 MV/m** Control margin = 3 %** S2 (S1*) Required RF power overhead for control 10% (TBD)S2 (S1*) , A. YamamotoBAW1 ML Cavity Op. Gradient12 Important input will also be gained from S1 program ** as starting points for the discussions

Gradient and Spread as of June, , A. YamamotoBAW1 ML Cavity Op. Gradient13

BAW1 ML Cavity Op. Gradient 14 Quench Gradient Feed-back Limit Feed-back Time Gradient Highest Gradient Operation From S. Nogichi Operating Gradient One Cavity – One Klystron Best Configuration Beam Timing , A. Yamamoto

Subjects to be further studied in TDP-2 Further Studied in TDP-2 – How wide cavity gradient spread may be acceptable in balance of HLRF power source capacity and efficiency? – How large operational margin required and adequate in cryomodule and accelerator operation? , A. YamamotoBAW1 ML Cavity Op. Gradient15

Discussions toward Common understanding/recommendation Observation – Challenging operational margin in accelerator operation to be reliable enough for sufficient availability for physics run. Our Strategy Proposed – Make our best effort with forward looking position to realize the accelerator operational gradient to be 31.5 MV/m, on average with reasonable gradient spread (> ~ 20 %), – Keep cost containment concept. – Prepare for the industrialization including cost and quality control. – Ask physics/detector groups to share our observation and forward looking strategy , A. YamamotoBAW1 ML Cavity Op. Gradient 16

Summary Tasks in each day/session DateMain ThemeTasks Sept. 7Introduction KCS: Design and R&D RDR: Technical Make the workshop tasks clear Process for the reality including cost Feasibility as a backup solution Sept. 8DRFS: Design and R&D LLRF/Control Discussions Process for the reality including cost R&F operation margin for cavity/accelerator Recommendation Sept. 9Cavity Gradient R&D Discussions Strategy for cavity gradient improvement Short-term and long-term strategy to be clear Sept. 10ML Accelerator Gradient Discussions Accelerator gradient including spread, Appropriate balance of gradient in cavity/cryomodule/accelerator, and Adequate margin in accelerator operation Recommendation , A. YamamotoBAW1 ML Cavity Op. Gradient17

Back-up , A. YamamotoBAW1 ML Cavity Op. Gradient18

, A. YamamotoBAW1 ML Cavity Op. Gradient 19 SB2009 Themes N Walker

Global Plan for SCRF R&D Year Phase TDP-1TDP-2 Cavity Gradient in v. test to reach 35 MV/m  Process Yield 50%  Production Yield 90% Cavity-string to reach 31.5 MV/m, with one- cryomodule Global effort for string assembly and test (DESY, FNAL, INFN, KEK) System Test with beam acceleration FLASH (DESY), NML (FNAL) STF2 (KEK, extend beyond 2012 ) Preparation for Industrialization Production Technology R&D , A. Yamamoto20BAW1 ML Cavity Op. Gradient

21 Quench Gradient Feed-back Limit ( LLRF ) V-Sum Feed-back Margin Time Gradient Highest Gradient Operation 1 ~ 2 MV Lorentz Detuning Compensation Error Q L = 3x10 6, Δf = 50 Hz, ψ = 13° ーー  ΔV = - 5 % QL = 2.0x10 6, Δf = 50 Hz, ψ = 8.7°  ΔV = % Operating Gradient , A. Yamamoto

BAW1 ML Cavity Op. Gradient 22 Higher Gradient Operation with Better Electric Power Efficiency Small Tuning Range & Less DLD Effect Cavity Grouping with Over-Coupling , A. Yamamoto

BAW1 ML Cavity Op. Gradient 23 How should we do for Degraded Cavity ? To Save other Good Cavities, We should have Tunability for RF Power & Coupling , A. Yamamoto

Summary from S. Michizono 24 BAW1 ML Cavity Op. Gradient (1)LLRF overhead ~5% (2)Cavity gradient tilt (repetitive) ~5% (3)Pulse-to-pulse gradient fluctuation ~1%rms RDRDRFS (PkQl)DRFS(Cavity grouping) Operation gradientMax. 33 MV/mAverage 31.5 MV/mMax. 38 MV/m RF source10 MW800 kW Waveguide loss8% power2% power Static loss (Ql, Pk)2% power Kly Hv ripple2.5% power Microphonics2% power Reflection0% power14% power0% power Other LLRF margin10% power 5%~10% power Ql tolerance3% (2) Pk tolerance0.2dB (2) Detuning tolerance15Hz rms(3)20Hz rms (3) Beam current offset2% rms (3) We have to examine these numbers experimentally. Tolerance should be discussed with cavity and HLRF group. If the tolerance is smaller, better gradient tilt would be possible , A. Yamamoto

Ideally, all cavities reach their respective quench limits at the same forward power 25.7 MV/m 28.5 MV/m 4.6 MW klystron power (est.) 5.5 MW klystron power (est.) 23.0 MV/m 26.1 MV/m ACC6 C2 will quench first (artifact of RF distribution forward power ratios) Reality: errors in power ratios due to manufacturing tolerances of rf attenuators (In this case: tolerances are of the order +/-0.1dB) Avg Emax: 31.4 MV/m Avg Emax: 28.6 MV/m Avg Emax: 27.9 MV/m Avg Emax: 23 MV/m 25BAW1 ML Cavity Op. Gradient , A. Yamamoto