1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh.

Slides:



Advertisements
Similar presentations
LC Calorimeter Testbeam Requirements Sufficient data for Energy Flow algorithm development Provide data for calorimeter tracking algorithms  Help setting.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 News and preparation of the Semi-Digital Hadronic CALorimeter prototype Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
CALICE ECAL/AHCAL Electronics 5-6 July DESY L.Caponetto, H.Mathez 1 Developments and Planning towards 1 m 3 Technological DHCAL Prototype Didier.
Tracking within hadronic showers in the SDHCAL Imad Laktineh.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb Paris, 8 October 2010.
Pavel Šťavina, Bratislava 2004 Slovak contribution to experiment ATLAS  Even though Slovakia is small country with limited finances we have fulfilled.
SiW ECAL Technological Prototype Test beam results Thibault Frisson (LAL, Orsay) on behalf of the CALICE collaboration.
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
Progress towards a technological prototype for a semi-digital hadron calorimeter based on glass RPCs Nick Lumb International Linear Collider Workshop Beijing,
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
SD-HCAL technological prototype – Chamber and cassette production Nick Lumb Lyon, 3 February 2011.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
SDHCAL I.Laktineh TB strategy The PS TB was indented to validate the whole system (including the DAQ) and to select the right thresholds values.
Towards a 1m 3 Glass RPC HCAL prototype with multi-threshold readout M. Vander Donckt for the CALICE - SDHCAL group.
Developing Imaging Calorimeters for a SiD-Flavor Lepton Collider Jacob Smith Linear Collider Physics School Ambleside,England 2009.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
The Prototype Simulation of SDHCAL Ran.Han Gerald.Grenier Muriel.Donckt IPNL.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
1 Short Status of TB Analyses in SDHCAL Imad Laktineh.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
LAPP Introduction Catherine ADLOFF for Yannis KARYOTAKIS.
1 Update on the project - selected topics - Valeria Bartsch, Martin Postranecky, Matthew Warren, Matthew Wing University College London.
SDHCAL-GRPC Review I.LAKTINEH For the SDHCAL-GRPC groups.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
1 Construction of technological semi-digital hadronic calorimeter using GRPC Imad Laktineh CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua,
Nouvelles Récentes. 2 WWS WorldWide Study on Physics and Detectors for Future Linear Colliders  Recognize and coordinate studies on whole detector concepts,
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Manqi Ruan Status & plans for gaseous semi-digital HCAL in European.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Relations with concept groups
Final CALICE OsC meeting: Status and summary of project
Test Beam Request for the Semi-Digital Hadronic Calorimeter
The European DHCAL status
Enrique Calvo Alamillo DAEGU
CEPC 数字强子量能器读出电子学预研进展
A proposal to equip the high eta muon stations with High Rate GRPC
Status of Ecal(s) for ILD
(My personal) CALICE Report
The DHCAL: an overview José Repond Argonne National Laboratory
ECAL project in the future 2-3 years
Semi-Digital Hadronic CALorimeter
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Granular calorimeters Infrastructure
10/month is the present production rate 2 FTE + sporadic contributions
The DBD: Outline and Scope
Reports for highly granular hadron calorimeter using software compensation techniques Bing Liu SJTU February 25, 2019.
AIMS 1- Build SDHCAL prototype of 1m3 as close as possible to the one
Michele Faucci Giannelli
Calice Tile-HCal and Tail-catcher/Muon Tracker
LC Calorimeter Testbeam Requirements
Presentation transcript:

1 Semi-Digital Hadronic CALorimeter Prototype planning CIEMAT, Gent, IPNL, LAL, LAPP, LLN, LLR, LPC, Protvino, Tsinghua, Tunis I.Laktineh

2 Organization Planning Budget Manpower Expected tests Global Review

3 detector Coordination Electronics Acquisition Mecanics Simulation IPNL LLR Tunis LLR LAPP IPNL CIEMAT IPNL,LLR LAL IPNL LLR LAPP IPNL Gent,UCL Protvino Tsinghua UCL IPNL Validation test Organization 11 groups from 6 countries all are CALICE members

4 Coordination, detector, electronics board, cassette, ASIC test, DAQ SW, simulation ASICs design and production DIF design, production and test DAQ HW and SW, simulation Mechanical structure, design, production and control Simulation, detector and validation test Detector Simulation Detector Organization IPNL LAL LAPP LLR CIEMAT LLN Gent Tunis Protvino Tsinghua In addition to CALICE meeting we organize specific SDHCAL meeting (about 1 every month) to discuss R&D and analyses

5 Planning Our aim is to achieve the SDHCAL prototype before March 2011 so we can be able to take beam in 2011 and validate the concept in time for the DBD in In addition our ANR contract stipulates to have our electronics ready by end of The construction will take place in three sites essentially 1-IPNL( Lyon) : Detector construction, electronics and cassette assembling 2-CIEMAT (Madrid) : Mechanical structure 3-UCL(Louvan-La-Neuve) : validation test 4- Interface boards were/will be tested in LAPP/LLR

6

7

8

9

10

11 R&D was funded by different national funding agencies However the most important contribution was that of IN2P3. The prototype is funded essentially by an ANR (electronics), IN2P3 (detectors), and CIEMAT (mechanics). Validation test facility is funded by Belgian funding agencies Budget Detector Cassette Mechanical Structure Electronics Services Prototype cost Part of the components are already acquired, others are being ordered

12 Glass plates (2) 100 € Painting + silk screen printing 150 € Spacers : ceramics balls (81) 30 € Frame (plastic)+ glue + connectors 50 € Mylar(2) 30 € Total 360 € Detector : 1 m 2 GRPC detector For 50 GRPC detectors the detectors cost is 18 k €

13 Stainless Steel plates 316L (2mm+3mm) ≈ 350 € Machining costs : Holes (M1,M2) ≈ 400 € Frame: Alum. bars ≈ 30 € Fixation pieces ≈ 50 Total ≈ 780 € Cassette : 1 m2 GRPC detector For 50 cassettes the cost is 39 k €

14 Stainless Steel plates 3O4L 20 mm ≈1000 € Machining costs : Flatness(<50µ), Thickness(<250 µ) ≈ 2000 € Frame : Spacers ≈ 100 Total ≈ 3100 € Mechanical Structure For 40 cassettes the cost is 124 k €

15 ASICs (9000) ≈ € ASU (300) ≈ € Connectors: ASU-ASU (300) ASU-DIF (150) ≈ € ≈ € Cabling ≈ € DIFs (150) DCC (14) ≈ € ≈ € Total ≈ € Electronics For 50 detectors the cost is 300 k €

16 Gas distribution system € High Voltage Power supplies (40) ≈ € Low Voltage power supplies available Total ≈ € Services For 40 cassettes the cost is 56.6 k €

17 Total Cost costs excluding manpower and validation test Detectors 18 k€ Cassettes 39 k€ Mech. Structure 124 k€ Electronics 300 k€ Services 57 k€ Total 538 k€

18 Manpower : Physicists IPNL(6 physicists, 1 PhD) LLR (2 physicists, 1 PhD) CIEMAT( 2 physicists, 1 PhD) LLN (1 Physicist, 1 PhD) Gent (2 physicists) Tunis( 1 physicist) Tsinghua(2 physicists, 1 PhD) LPC (2 physicists)

19 Manpower : Technical staff Detector : 1 Eng. 2 Tech Glass preparation, spacers and frame gluing gas outlets and HV connectors installation IPNL,Gent,UCL,Tsinghua Cassette : 1 Eng. 2 Tech Frame and electronic board fixation, detector installation and quality control IPNL,LLR ASIC : 1 Eng., 1 Tech ASICs testing and calibration IPNL ASU : 2 Eng. 3 Tech Controlling ASUs after cabling, connecting and soldering ASU and controlling the 1m 2 electronic board IPNL DIF : 1 Tech Controlling the DIFs LAPP DAQ : 4 Eng HW and SW control, DAQ validation, database and event building LLR,IPNL Mech. Str.: 1 Eng. 2 Tech controlling the plate quality and mounting CIEMAT Validation test : 2 Tech Mounting and running the test bench UCL

20 Strategy : Test-Beam In 2012 the ILC community is to submit a DBD (Detector Base Design) document to the ICFA. This implies that each of the ILD and SiD concepts have already selected their sub- detectors baseline. We intend to demonstrate by 2011 that the SDHCAL solution we proposed in the 2009 LOI is qualified to be selected as a baseline for ILD. The technological prototype is expected to be completed by April Two months of commissioning are requested before to expose it to a particles beams. By June-July 2011 we hope to be ready to receive beam. For this we intend to submit a request to CERN authorities for two months of beam at SPS.

21 Our request will be a part of a global CALICE request. However, in order to fulfill our program we need a special movable and rotating stage capable of supporting up to 10 tons. We need also to use a TB line which provides low energy pions. These two conditions limit our choice. Contact with ATLAS Test Beam coordinator was established to see if we can use the ATLAS stage on the H8 line. This line is one of two lines able to provide hadron beam as low in energy as 2 GeV. It is very important to be ready in 2011 and to go to TB since no beam is available at CERN n 2012 Strategy : Test-Beam

22 First period ( between June and July): Three kinds of particles beams will be requested 1- Muons: To control the detectors and estimate their efficiency in situ. To align precisely the detectors inside the HCAL 2- pions: To study energy resolution in the GeV range. 3- Electrons : To study the HCAL response to a pure electromagnetic particles In addition to energy scan, there will be angle scan as well as a threshold scan. The latter allows to select the best values for a better energy resolution Test-Beam program

23 Second period (between October and November) : The aim of this test is to have a deep understanding of the hadronic shower behavior once the detector response is well understood. We would like to have by that time 48 units (as for the modules proposed for ILD (5  6 λ I )). We intend also to have a combined test with the CALICE ECAL detector which represents an additional λI In addition to studying the hadronic shower behavior we would like to study separation of two hadronic shower by increasing the beam intensity. The GRPC rate limitation is less an issue when particles start their interaction in the ECAL Test-Beam program

24 Conclusion During 4 years we followed an active R&D in the field of gaseous-detector-based calorimetry. We showed that we are capable of building large GRPCs fulfilling the request of ILC future experiments of efficiency and homogeneity. We developed a new semi-digital readout and tested it extensively. A 1 cm 2 lateral resolution is obtained. We conceived a cassette that allows to hold the electronics on the detector tightly. The cassette is designed to be part of the absorber. This allows to have a better transverse Sampling We carried many TB campaigns to validate not only the different Elements of our SDHCAL

25 Conclusion We succeeded to attract new groups to join our efforts and we have the needed manpower to realize the prototype and exploit it. Although we believe we have done what is necessary to succeed our project, we will still appreciate highly that experienced people could provide us with their invaluable recommendations to help us in our project.