Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An.

Slides:



Advertisements
Similar presentations
M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
Advertisements

A “BTeV” Hybrid Pixel Telescope for MTest David Christian May 4, 2007.
1 Status of the CMS Pixel project Lorenzo Uplegger RD07 Florence 28 June 2007.
Using the EUDET pixel telescope for resolution studies on silicon strip sensors with fine pitch Thomas Bergauer for the SiLC R&D collaboration 21. May.
November 3-8, 2002D. Bortoletto - Vertex Silicon Sensors for CMS Daniela Bortoletto Purdue University Grad students: Kim Giolo, Amit Roy, Seunghee.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Status and outlook of the Medipix3 TSV project
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
3D chip and sensor Status of the VICTOR chip and associated sensor Bonding and interconnect of chip and sensor Input on sensor design and interconnection.
Plans for Demonstrator Flip Chip Bonding GTK meeting 9/12/08 1.
Status and Future of Fermilab Test Beam Facility Erik Ramberg LCWS07 Performance of New Beamline Tracking, Cerenkov and TOF CALICE and MINERVA tests Potential.
Recent Activity at the Upgraded Test Beam Facility Erik Ramberg AEM 16 April, 2007 Open House and ILC Workshop New Test Beamline Layout and Performance.
EUDET Annual Meeting, Munich, October EUDET Beam Telescope: status of sensor’s PCBs Wojciech Dulinski on behalf.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
FPIX_flip_chip_test module calibration tests November 14 th 2012.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
1 BTeV Status  Collaboration Status New Groups  University of Iowa - C. Newsom (Pixels)  Institute of High Energy Physics (IHEP - Protvino) - A. Derevschikov,
Pixel Upgrade Status and Plan G.M. Bilei Firenze Mar. 6 th 2013.
Gerd J. Kunde - LANL1 The FVTX Technology  Outline Overall Picture Silicon Detector –Geometry, Layout, Process Readout Chip –FNAL Chips, New Chip PHX.
Pixel Pilot system Simon Kwan November 8, 2011 Pixel Upgrade Parallel Session CMS Upgrade Week, Nov 7-10,
Annual Meeting WP2- Sensors Heinz Pernegger / CERN 20 November 2013.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
2 Silicon pixel part Done and to be written Written! Under way To be done Introduction 1.Hybrid Pixel Assembly Concept 2.Silicon sensor 1.First thinned.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Some thoughts on Tracking System for Stage 1 HPS Simon Kwan Fermilab 09/19/2011.
The BTeV Pixel Detector David Christian Fermilab June 17, 2010.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
1 JRA2-SITRA status report Z. Doležal, A. Savoy-Navarro for JRA2-SITRA partners (LPNHE Paris, Ch.U. Prague, Helsinki, Santander) and associates (CNM Barcelona,
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
IEEE October 16-22, 2004 First Look at the Beam Test Results of the FPIX2 Readout Chip for the BTeV Silicon Pixel Detector First Look at the Beam Test.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
Test of Single Crystal Diamond Pixel Detector at Fermilab MTEST Simon Kwan Fermilab April 28, 2010.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
Lehman Review April 2000 D. Bortoletto 1 Forward Pixel Sensors Daniela Bortoletto Purdue University US CMS DOE/NSF Review April 12,2000 Progress.
Transition to cables Staves Services IP Underside of stave: IBL modules IBL Design.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
MTest Pixel Telescope – Status Update David Christian January 8, 2008.
David M. Lee Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs.
September 7, 2004Si VTX Strip Overview1 Overview of VTX Strip Group Activities Abhay Deshpande SUNY-SB For Si Strip Group.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Irradiated 3D sensor testbeam results Alex Krzywda On behalf of CMS 3D collaboration Purdue University March 15, 2012.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
FBK 3D CMS pixel sensors preliminary lab measurements E. Alagoz 1, A. Krzywda 1, D. Bortoletto 1, I. Shipsey 1, G. Bolla 1, and G. F. Dalla Betta 2, M.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
An Overview of the FPIX Detector Upgrade – CMS Experiment
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
QCG Report Francesco Forti University and INFN, Pisa.
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Si Sensors for Additional Tracker
Testsystems PXD6 - testing plans overview - by Jelena NINKOVIC Hybrid Boards for PXD6 - by Christian KOFFMANE Source measurements on DEPFET matrices using.
Preliminary results from 3D CMS Pixel Detectors
GTK_EOC_V1 A. Kluge.
Hybrid Pixel R&D and Interconnect Technologies
Beam Test Results for the CMS Forward Pixel Detector
Presentation transcript:

Hybrid Pixel R&D After BTeV As of two years ago: –FNAL-designed readout chip had two minor fatal flaws. –No system demonstration had yet been done. An “extended closeout” R&D program was approved –1 more readout chip submission. –Pixel R&D refocused on ILC. –Two system tests approved: Telescope for the forward direction of PHENIX (at RHIC) Test beam telescope –Both efforts in collaboration with LANL & Columbia U.

Sensor & FPIX2.1 wafers Sensor wafers produced for PHENIX by CiS (LANL has agreed to donate the x4 sensors for use in MTest) FPIX2.1 fabricated on wafer with “TripT” for D0; fatal flaws fixed; 11 wafers purchased by LANL for PHENIX, 11 by FNAL to support R&D - 2 required for MTest telescope.

Sensors & ROCs probed – yield is high Typical FPIX2.1 wafer map Typical sensor IV curve

Hybridization – solder bump bonding done by VTT (Finland) X-ray made at FCC VTT bump-deposition process flow Production orders placed ~10/15/07 Delivery of hybrids is the schedule driver.

Half-plane = three 1x4 modules Station = two half-planes offset by active area of sensor read out by 1 FPGA 2 stations upstream of DUT & 2-4 downstream (precision x & precision y) Test beam telescope

MT6-1A Assets Climate controlled hut. Aluminum table on rails allows entire setup to be removed from beam. Dark box with feed throughs for signals, power, & cooling fluid. Remotely controlled motors determine (x,y) position of both ends of box. Local chiller provides closed loop cooling system CAEN power system can provide LV & sensor bias (“HV”). Plenty of quiet power is available.

Schedule Goal = installation in February 2008 (depends on delivery of bump bonded hybrids). First user = LHCb. Hybrid pixel telescope will measure every beam particle with good timing and moderate precision (5-10  m). Anticipate the addition of one station with very high precision (& probably much less good time resolution), such as MAPS.