ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile.

Slides:



Advertisements
Similar presentations
ECE 477 Final Presentation Team 03 - Spring 2013 Ryan Pawling Spencer Julian Josh Hunsberger Robert Harris.
Advertisements

ECE 477 Design Review Team 6  Spring 2010 Shao-Fu ShihSteve AndersonMike Goldfarb Josh Smith.
ECE 477 Final Presentation Team 6  Spring 2010 Digital Sound Projection.
Humble Hubble Team 18: Evan Foote, Doug Wile, Tim Brown, Derek Pesyna Background:
ECE 477 Final Presentation Team ??  Fall 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 10  Spring 2008 Paul Ng Daniel Bixby Matt Ligocki David Collins Paul Ng Daniel Bixby Matt Ligocki David Collins.
ECE 477 Final Presentation Team 09 − Spring 2013 Jacob Wiles John Wyant Aashish Simha Richard Park.
Electrical and Computer Engineering Personal Head-Up Display Ivan Bercovich Radu-Andrei Ivan Jeff Little Felipe Vilas-Boas Faculty: Dr. Tilman Wolf Midway.
Jordan Wagner Justin Spencer Mark Sears John Jachna.
ECE 477 Final Presentation Team 03  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 FINAL PRESENTATION TEAM 7  SPRING 2013 COST ROBOT ERIC OSBORNE, BRYAN DALLAS, ANDREW LOVELESS, CAROLINE TRIPPEL.
Ryan McLean John-Michael Mulesa Joe Perrin Zach Schoenberger Formal Design Review.
ECE 477 Design Review Team 01  Fall 2013 Paste a photo of team members here, annotated with names of team members.
ECE 477 Design Review Group 14  Spring 2005 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 16 − Spring 2013 Scott Stack Neil Kumar Jon Roose John Hubberts.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
ECE 477 Final Presentation Team 7  Spring 2011 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 20  Spring 2013 Jordan Wagner Justin Spencer Mark Sears John Jachna.
Treasure Chess ECE 477 Team 2 - Spring 2013 Parul Schroff, Brock Caley, Sidharth Malik, Jeremy Stork Final Presentation Final Packaged Design.
ECE 477 Final Presentation Team 12  Spring 2010 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 2  Spring 2006 Prashant Grimella Andy Brezinsky Tim Sendgikoski Clark Malmgren.
ECE 477 Final Presentation Team 14  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 5  Fall 2009 Left to right: Ben, Dennis, Jacqui, Ian.
ECE 477 Final Presentation Team 21 - Spring 2013 Team Members: Duncan Swartz, Jacqueline Greer, Tom Pansino, Mark Tubergen.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
ECE 477 Final Presentation Team 12  Spring 2013 Xirong Ye Zongyang Zhu Chun Ta Huang Libo Dong.
ECE 477 Final Presentation Team 1  Spring 2012 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 14  Spring 2012.
ECE 477 Final Presentation Team 14  Spring 2010.
Team /02/28 1. Chun Ta Huang Xirong Ye 2 Libo Dong Zongyang Zhu.
ECE 477 Final Presentation Team 01  Spring 2014 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Design Review Team 7  Spring 2008 Paste a photo of team members here, annotated with names of team members.
Team 18: Humble Hubble The proposed project is a self-aiming telescope. This telescope will interface with a host device to populate a list of celestial.
ECE 477 Design Review Team 3  Spring Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria.
ECE 477 Final Presentation Team 4  Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 9  Spring 2011 Above (Left to Right): Nick Gentry, Oliver Staton, Vineet Ahuja, and Vinayak Gokhale.
Humble Hubble Team 18 Tim Brown. Abstract The proposed project is a self-aiming telescope. This telescope will obtain its global position and the local.
ECE 477 Design Review Team 4  Spring 2006 Justin Thacker, Matt Kocsis, Ian Snyder, Dustin Poe.
ECE 477 Final Presentation Team 2  Spring 2010 Caleb Ayew-ew Josh Long Katie Schremser The Digi-Brush.
1 © 2008 RoboRubik ECE 477 Final Presentation Team 11 – Spring 2008 Tyler Heck Dave Bukiet Erik Carron Casey Kloiber.
ECE 477 DESIGN REVIEW TEAM 3  SPRING 2015 Garrett Bernichon Bryan Marquet John Skubic Tim Trippel.
ECE 477 Final Presentation Team 3  Fall 2012 Daniel Carolyn Jonathan Mihir Stein McMican Kuntzman Shah.
ECE 477 Final Presentation Team 01  Spring 2010 Mike Wei Jon SchwarzCarlo Mesina Bill Bergquist.
ECE 477 Design Review Group 9  Fall 2005 Paste a photo of team members here, annotated with names of team members. Tim Miller Clif Barnes Drew Heinrich.
 Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration  Questions / discussion.
V i t a l i s Wireless Biometric Sensor ECE 477 Final Presentation Team 13  Spring 2013 Paste a photo of team members with completed project here. Annotate.
ECE 477 Final Presentation Team 2  Fall 2010 Shannon Abrell Ben Laskowski Andrew Phillips Rob Swanson.
ECE 477 Final Presentation Team 4  Spring 2011 Petra M. Alex B. Alex G. Kim S.
Team 18 – Humble Hubble Derek Pesyna. Project Abstract To design and build a self-aiming (go-to) telescope that utilizes various sensors (gps, compass,
ECE 477 Final Presentation Team 4 Spring Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 FINAL PRESENTATION TEAM 6  SPRING OUTLINE  Project overview  Block diagram  Design challenges  Individual contributions  Project demonstration.
ECE 477 Design Review Team 1  Spring 2009 Paste a photo of team members here, annotated with names of team members.
ECE 477 Final Presentation Team 22  Spring 2013 Paste a photo of team members with completed project here. Annotate this photo with names of team members.
ECE 477 Final Presentation Team 01  Fall Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges.
ECE 477 Final Presentation Team 13  Spring 2008 Varun Srichand Anvesh Madhu.
ECE 477 Final Presentation Team 9  Fall 2009 DART.
<Add team picture or relevant project picture here>
ECE 477 Design Review Team 13  Spring 2007
ECE 477 Final Presentation Team 04  Spring 2010
ECE 477 Design Review Team 13  Spring 2007
Humble Hubble Team 18 – Evan Foote Abstract
ECE 477 Team 18 - Timothy Brown
Humble Hubble Team 18 – Derek Pesyna Abstract
ECE 477 Final Presentation Team 4  Fall 2011
ECE 477 Final Presentation Team 2 Spring 2012
ECE 477 Final Presentation Team 10  Spring 2008
ECE 477 Final Presentation Team 1  Spring 2008
ECE 477 Final Presentation Team 15  Spring 2010
ECE 477 Final Presentation Team 13  Spring 2011
Presentation transcript:

ECE 477 Final Presentation Team 18  Spring 2013 Derek Pesyna, Tim Brown, Evan Foote, Doug Wile

Outline Project overviewProject overview Block diagramBlock diagram Design challengesDesign challenges Individual contributionsIndividual contributions Project demonstrationProject demonstration Questions / discussionQuestions / discussion

Project Overview Humble Hubble is a self-aiming telescope. This telescope will obtain its global position and the local time via GPS. It will then automatically orient itself to point at a user selected target (star) using a variety of onboard sensors. Underlying motivation: A desire to combine a knowledge and passion for electrical and computer engineering with an interest in astronomy to create a useful and educational product.

Block Diagram

Block Diagram (Cont)

Design Challenges Digital sensors in small form factorDigital sensors in small form factor Components replaced after PCBComponents replaced after PCB Several components sensitive to EMR (Bluetooth, GPS, compass)Several components sensitive to EMR (Bluetooth, GPS, compass) –Break PCB into three separate boards GPS signal not always availableGPS signal not always available –Include manual mode Sensors prone to error (EMI, device gets bumped during operation, etc)Sensors prone to error (EMI, device gets bumped during operation, etc) –Include calibration mode to offset the error

Individual Contributions Team Leader – Doug WileTeam Leader – Doug Wile Team Member 2 – Tim BrownTeam Member 2 – Tim Brown Team Member 3 – Derek PesynaTeam Member 3 – Derek Pesyna Team Member 4 – Evan FooteTeam Member 4 – Evan Foote

Team Leader – Doug Wile PCB LayoutPCB Layout Celestial Coordinates vs Horizon Coordinates researchCelestial Coordinates vs Horizon Coordinates research Star data consolidationStar data consolidation Microcontroller softwareMicrocontroller software

Member 2 – Tim Brown Microcontroller SelectionMicrocontroller Selection Pin assignmentPin assignment PCB FootprintsPCB Footprints Microcontroller softwareMicrocontroller software

Member 3 – Derek Pesyna 2 Major Contributions: Packaging and Design – CAD Model and built mountPackaging and Design – CAD Model and built mount Android ‘Humble Hubble’ Application – Programmed and Debugged Bluetooth communication applicationAndroid ‘Humble Hubble’ Application – Programmed and Debugged Bluetooth communication application

Member 4 – Evan Foote Researched Major ComponentsResearched Major Components Helped Design Circuit, Board LayoutHelped Design Circuit, Board Layout Soldered PCBsSoldered PCBs

Project Demonstration 1.An ability to establish a coordinate system based on the telescope's absolute global position via a GPS chipset, and relative orientation based on an accelerometer and electronic compass. 2.An ability to compensate for combined variations in the Earth's gravitational and magnetic field, and variations in telescope geometry and mounting configurations via electronic user calibration: centering the optics on a desired target from a list of one or more prominent celestial bodies (i.e. the Moon, Polaris, Venus or other predetermined bright objects).

Project Demonstration (Cont) 3.An ability to retrieve celestial coordinates and targets via Bluetooth from an external host. 4.An ability to automatically move and point the telescope at the designated target using feedback loops from integrated motor encoders. 5.An ability to allow the user to manually override the telescope's target coordinate using an onboard electronic control interface, and to display information regarding headings on an onboard LCD. Video Link: Video Link: PSSC Demo VideoPSSC Demo Video

Questions / Discussion