RAL/ISS meeting, April 24-28 2006 Marcos Dracos Collection system, horn (work mainly done by Francis Osswald) goals and perspectives suppliers and collaborations.

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

Individul Project: NPD-NET Component 4: Integration and Regional Adaptation of NPD Roadmap Kick-off meeting Region of Central Macedonia – URENIO Research.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Harold G. Kirk Brookhaven National Laboratory Meson Production Efficiencies IDS Target Meeting CERN December 17, 2008.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Development of new power supplies for J-PARC MR upgrade Yoshi Kurimoto (KEK) for J-PARC accelerator group.
RAL/BENE meeting, April Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg.
Beam tolerance to RF faults & consequences on RF specifications Frédéric Bouly MAX 1 st Design Review WP1 - Task 1.2 Bruxelles, Belgium Monday, 12 th November.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
European design study on Neutrinofacilities - Euronu within FP7.
BENE-CARE meeting, November 14, 2006 Collector work in Strasbourg 2 contributions : preparation of horn tests and definition of supplies and infrastructure.
WP2 Superbeam Work Breakdown Structure Version 2 Chris Densham (after Marco Zito version 1 )
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 20 August 2013M. Dracos.
J. Pozimski UKNF WP1 meeting 10 March 2010 UKNF WP1 milestone table status.
Status of X-Band PPM Klystron R&D for JLC KEK Yong Ho Chin ISG9 KEK December 10-13, 2002.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
CERN/BENE meeting, July Marcos Dracos Collection system for future neutrino beams horn and target integration 2 LoI's sent –CERN –Strasbourg Who.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Mass production (Super-K) Setup of jnubeam – 3 horn 250 kA – 30-GeV proton beam of Gaussian distribution (  x,y = cm) – On center, parallel beam.
MICE CM16 Goals Alain Blondel 8 October MICE CM 16 Collaboration meeting 8-11 October 2006 at RAL Goals of the meeting thanks to John Cobb & Marco.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
ESS based neutrino Super Beam for CP Violation discovery Marcos DRACOS IPHC-IN2P3/CNRS Strasbourg 1 10 September 2013M. Dracos.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
Kaons in the SPL Superbeam Antoine Cazes Laboratoire de L’accélérateur Linéaire.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
T2K Status Report. The Accelerator Complex a Beamline Performance 3 First T2K run completed January to June x protons accumulated.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
From the SPL to the 4-target-horn system: Preliminary design of a beam switching yard WP2: Super Beam 4 th EUROν Annual Meeting, Paris, June 13, 2012 E.
Wolfgang Vinzenz FAIR Proton Linac 10 th FAIR MAC November 25 th and 26 th 2013 Proton Linac 1 Status Buncher Design  Rectangular design, longitudinal.
WP2 13/07/2011M. Dracos1 Marcos Dracos IPHC-IN2P3/CNRS, Strasbourg.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
EuCARD WP 7 – High Field Magnets EuCARD WP 7 – High Field Magnets Task 2 – Support studies Status report after M6 EuCARD HFM collaboration meeting – CERN.
Horn and Solenoid options in Neutrino Factory M. Yoshida, Osaka Univ. NuFact08, Valencia June 30th, A brief review of pion capture scheme in NuFact,
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
Marcos DRACOS IPHC-IN2P3/CNRS Université de Strasbourg
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ICE SECTION The coolest place to be! Elias Métral
Challenges and Progress on the SB Horn Design
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Thales Klystrons for Linacs
Horn and Solenoid Options in Neutrino Factory
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Target and Horn status report
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Outline: Why now ? What ? How ?
WP11: electron and proton beam testing
EU Institution Board 1 representative of each participating institute
Gu Qiang For the project team
High Efficiency X-band Klystron Design Study
Collector and the SPL Super-Beam Project
Progress towards Pulsed Multi-MW CERN Proton Drivers
Superbeam Horn-Target Integration
EURO Conclusions from Cracow meeting
Advanced Research Electron Accelerator Laboratory
A High Intensity Neutrino Oscillation Facility in Europe
Presentation transcript:

RAL/ISS meeting, April Marcos Dracos Collection system, horn (work mainly done by Francis Osswald) goals and perspectives suppliers and collaborations the pulsed power supply conclusion and next milestones

RAL/ISS meeting, April Marcos Dracos IReS participation in BENE WP4 collaboration with CERN and technology transfer install a local test setup transferable to CERN in case is necessary for radiation tests develop a pulsed power supply dedicated to this horn perform qualification and endurance tests develop a simulation tool target integration

RAL/ISS meeting, April Marcos Dracos After discussion with CERN Start the collection study for SuperBeam option Taking into account previous tests done at CERN, prepare a setup to pulse the horn at 50 Hz (nominal value) and a current as high as possible Proton beam –2.2 GeV –4 MW –50 Hz rep. rate Horn focusing –First horn 300 kA –Reflector 600 kA Low energy pion beam:  500 MeV –proton energy below kaon threshold –Short decay channel < 100 m Low energy neutrino beam:  250 MeV CERN horn design tests already done at CERN: pulse repetition frequency: 1 Hz Imax: 30, 100 kA C: 1 mF pulse duration: 100  s

RAL/ISS meeting, April Marcos Dracos remaining horn SB issues IssueStatusCompetenceTechno-risk Target integrationTo be doneOutsourcing (BENE/WP4) controlled Thermo mechanical 4 MWTo be doneIReSlow Multi physics simulation > fatigue, endurance, transient mode To be doneIReSlow Reflector integrationTo be doneCERN/IReSintermediate Gradual power test up to 300 kA & 50 HzTo be doneIReS+ISL(financing) Endurance test EM/structural mech. ( pulses) To be doneIReSlow Thermo mechanical test (Joule+beam)To be doneIReS+outsourcinghigh Test with reflectorTo be doneIReS/CERNintermediate Study of PS energy recoveryTo be completedIReS+ISL+ABBlow Radiation hardnessTo be completedIReS+outsourcingintermediate

RAL/ISS meeting, April Marcos Dracos work in progress since last ISS meeting at KEK power supply design : looking for suppliers, collaborations and financing infrastructure and team setup simulation tool evaluation

RAL/ISS meeting, April Marcos Dracos evaluation process selection of the suppliers evaluation of the competitiveness definition of the developments

RAL/ISS meeting, April Marcos Dracos actual status supply charger : Cirtem(Toulouse), Hazemeier(Gauchy), Micronics (Lyon) or Technix (Créteil) capacitors : TPC-AVX (F) or Atesys (F) switching : ABB (CH) collaboration ISL (St Louis) contacts MegaGauss (Berlin) LNCMP (Toulouse)

RAL/ISS meeting, April Marcos Dracos the power supply

RAL/ISS meeting, April Marcos Dracos the power supply control/monitoringcommand/triggering interfaces chargercapacitor bench switchingprotections recovery Z adaptation

RAL/ISS meeting, April Marcos Dracos a modular system enables progressive financing manage the test setup installation preparation and realization of different tests investigations with simulation high current 50 Hz

RAL/ISS meeting, April Marcos Dracos financing R&D phase test phase operation phase ANR ( Agence Nationale de la Recherche), 2007 EU (FP7) Région Alsace CNRS/IN2P3 EU (FPi) CERN

RAL/ISS meeting, April Marcos Dracos preliminary schedule Design of Power Supply: 2006 R&D, tests and simulations: new prototype: 2008