L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan.

Slides:



Advertisements
Similar presentations
Actions and Retrofit of Post Earthquake-Damaged Bridges
Advertisements

SUB-STRUCTURE foundations.
Prepared for: Mr. Michael Bolch Shaw Group. Project Scope and Client Goals Florida Institute of Technology Design and construction of a 12,600 s.f. commercial.
An-Najah National University
OSHA’s Fall Protection Requirements
Chp12- Footings.
Reinforced Concrete Design-8
Structural System Overview
Commercial Framing C D Prints Unit 13.
Subpart R Steel Erection
The Hyatt Regency walkway collapse
SRT251- Construction and Structures 2 Timber Portal Frame Glenn Murcutt Daniel McLean
Mechanics of materials ** progressive collapse **  The term progressive collapse is defined as the collapse of all or a.
Subpart R Steel Erection. Workers of the past were sometimes referred to as “Dare Devils.”
OSHA Subpart Q Concrete and Masonry Construction.
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Reinforced Concrete Design II
Floor Systems and Foundation Support
Foundation Engineering CE 483
Chapter 2b Foundations Shallow & Deep Foundations.
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
Service Delivery 2 Collapsed Structures. Aim To provide information that will assist students to deal with incidents involving collapsed structures safely.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Preparatory Seminar for STL Examination By Dr. James Lau, BBS JP.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Ethical Disasters Group 8 By Dominique Amos, Josh Seuss, Alex Finkelstein, Mike Hite, Kevin Hao.
TOPICS COVERED Building Configuration Response of Concrete Buildings
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
FRAMED STRUCTURE By Sarah Grao Andrea Perez Maria Rojas
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
The Odyssey Condominium Aaron Snyder Arlington, Virginia
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Gateway Plaza Wilmington, DE Elizabeth Hostutler Structural Option.
Building Fun You will have 30 minutes to build the strongest structures you can with only the materials you are provided with. Explain to the class the.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Whiteland Village Mary Longenecker Structural Option Senior Thesis August 7, 2007.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Fundamentals of Structural Detailing
FOUNDATION Engineering Design of shallow foundation
Hartford Civic Arena Roof Collapse
L'Ambiance Plaza Collapse Bridgeport, Connecticut April 23, 1987
+ 9/11: A Terrible Event on American Soil (Source: worldpittsburgh.wordpress.com)
The Royal Plaza Hotel Collapse. Background on Collapse  Collapsed Friday 13 th August 1993 at 10:10 a.m.  The collapse took less than 10 seconds! 
The New Steel Erection Rule Developed by S teel E rection N egotiated R ulemaking A dvisory C ommittee (SENRAC) in 2001 Occupational Safety and Health.
Session 9 – 10 MAT FOUNDATION
The four basic types of structures are :
Group 15 Simon Phelan Phillip Barry Simon White Fabien Raoux.
Flange Plates to be Welded to Beam Flanges.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
Claudia Pérez Laura Rendeiro
Subpart Q - Concrete & Masonry Construction ( ) Reinforcing steel - Guarding Masonry walls - Bracing Masonry construction - Limited access.
Hartford Arena Roof Collapse.  January 18th  Snowstorm.  Roof plummeted 83 feet to the arena floor.  What caused the 300-x 360ft. roof to collapse?
Structural Steel Construction
Royal Plaza Hotel Collapse Thailand Group 24. Summary on Collapse Collapsed on Fri 13th August 1993 in less than 10 seconds 379 people in the Hotel were.
CONDOMINIUM TOWER & PARKING
Introduction Used for covering spaces in the form of roof or floor
Concrete and Masonry Construction 29 CFR 1926, Subpart Q
Wood Structures Topic 8 Quality Workmanship
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
STRUCTURAL FAILURES-CAUSES AND REMEDIES:
Fire Resistance of Steel Structures
Project: 250 West Street, Columbus, Ohio
Masonry Bearing Walls.
Presentation transcript:

L’Ambiance Collapse Group 15 David Lawlor Emma Quinn Daniel O’Sullivan Cian O’Sullivan

Introduction Bridgeport, Connecticut Bridgeport, Connecticut April 23, 1987 April 23, 1987 Sixteen-story building, Thirteen apartment levels, topping three parking levels Sixteen-story building, Thirteen apartment levels, topping three parking levels Consisted of two offset rectangular towers Consisted of two offset rectangular towers Elevator

Design Seven inch thick posttensioned, concrete slabs Seven inch thick posttensioned, concrete slabs Steel columns comprised its Structural Frame Steel columns comprised its Structural Frame Lift-Slab method of construction Lift-Slab method of construction Hydraulic lifting apparatus used to put slabs into position Hydraulic lifting apparatus used to put slabs into position Two shear walls in each tower – Lateral Resistance (except top two floors) Two shear walls in each tower – Lateral Resistance (except top two floors)

Collapse Building little more than halfway completed Building little more than halfway completed First the West Tower, then the East First the West Tower, then the East Took five seconds for entire building to collapse Took five seconds for entire building to collapse 28 construction workers died in collapse 28 construction workers died in collapse Unusually prompt legal settlement ended all investigations Unusually prompt legal settlement ended all investigations Consequently – the exact cause of the collapse has never been established Consequently – the exact cause of the collapse has never been established Number of deficiencies – which was the trigger? Number of deficiencies – which was the trigger?

Theory 1 National Bureau of Standards (NBS) “An overloaded steel angle welded to a shearhead arm channel deformed, causing the jack rod and lifting nut to slip out and the collapse to begin” National Bureau of Standards (NBS) “An overloaded steel angle welded to a shearhead arm channel deformed, causing the jack rod and lifting nut to slip out and the collapse to begin”

Theory 2 Thornton-Tomasetti Engineers “The instability of the wedges holding the twelfth floor and roof package caused the collapse” Thornton-Tomasetti Engineers “The instability of the wedges holding the twelfth floor and roof package caused the collapse” Theory 3 Schupack Suarez Engineers Inc “The improper design of the posttensioning tendons caused the collapse” General Layout of Posttensioning

Theory 4 Occupational Safety and Health Administration (OSHA) “Questionable weld details and substandard welds could have caused the collapse” Occupational Safety and Health Administration (OSHA) “Questionable weld details and substandard welds could have caused the collapse” Theory 5 Failure Analysis Associates (FaAA) “The sensitivity of L’ambiance Plaza to lateral displacement caused its collapse” Wedged Slab-to-Column Connection

Other factors contributing to disaster Gross negligence on part on management Gross negligence on part on management Variations in control of lifting operations Variations in control of lifting operations Cutting corners to save money (use of broken rock fill under certain footing- instead of direct bearing on rock) Cutting corners to save money (use of broken rock fill under certain footing- instead of direct bearing on rock) Building regulations not adhered to for innovative “lift-slab” method Building regulations not adhered to for innovative “lift-slab” method

Conclusions Insure lateral stability and safety during construction when using lift-slab method Insure lateral stability and safety during construction when using lift-slab method Responsibility for each aspect of design should be clearly allocated Responsibility for each aspect of design should be clearly allocated Ensure a high standard of structural safety during construction by constant monitoring by engineer Ensure a high standard of structural safety during construction by constant monitoring by engineer Independent Engineers from building authorities to check progress Independent Engineers from building authorities to check progress