Bi-Directional RF Data Communication A Robot Control Device.

Slides:



Advertisements
Similar presentations
RS-485 Data Link Tester Team Members:Raymond Weber Lance Spotted Elk Sponsor:LED Effects.
Advertisements

Two Way Remote Control Dr. Abdelhafid Bouhraoua. Outline Context, Motivations and Applications Principle of Operation Components Implementation Problems.
1 Adaptive Thermostat With Bluetooth Technology Trey Lawrence Jennifer Ogunlowo Scott Snyder Mark Youngblood ECE4007L02, Group 7 Georgia Institute of Technology.
Client Status Presentation Team Members: –Tom HamiltonTreasurer –Kevin HarkinsDocument Coordinator –Alan KinnamanTeam Leader –Robert NapperLiaison –Bill.
Telematics: Interactive Display Using Wireless Communication Jimmy Su Team Whitney April 29, 2002.
User Interface (hardware). Overview  Translate user actions into electrical control signal which controls the robot movement  Be able to input and store.
Ping Project Justin Knowles Kurt Lorhammer Brian Smith Andrew Tank ECEN 4610.
Preliminary Design Report GPS Location System. Introduction GPS COMM Group Team Members Adam Preeo Adrian Migacz Andy Merritt Taylor Hughes.
Senior Project Design Review Remote Visual Surveillance Vehicle (RVSV) Manoj Bhambwani Tameka Thomas.
Wireless Data Link for a Hospital Advisor: Prof Yngvesson Team: Shruti Sharma Wen Lo Ike Amazu.
1 CMPT 275 Software Engineering Requirements Analysis Process Janice Regan,
CCTV SYSTEMS WIRELESS BASED CCTV.
P13071 – Non-Invasive Blood Glucose Monitor Team Members Jared Bold Yongjie Cao John Louma Andrew Rosen Dan Sinkiewicz Faculty Advisor Professor George.
CEN Fourth Lecture Introduction to Software Engineering (CEN-4010) Instructor: Masoud Sadjadi Project Organization.
WCBI Team Information Team number: Client: Faculty Advisors: Technical Advisors: Team Members: May02-11 Square D Company (Greg Wiese) Glenn Hillesland.
High-Intensity Focused Ultrasound Therapy Array May1005 Alex Apel Stephen Rashid Justin Robinson.
ESTeem Training Class ESTeem Overview. ESTeem Product Categories Licensed Serial – Long Range Application – Exclusive Use of FCC Frequency – PLC Emulation.
Group Members: John Ziegler Richard Wismer III Ryan Ramdehol Wojciech Gajda.
CS410 - BLUE GROUP Final Presentation communicate2Me.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Bi-Directional RF Data Communication A Robot Control Device Team BDRFC.
EE 491 Project Presentation May07-04 – PDA Based UAS Remote Video Terminal Team Members: Devin Carney Jonathan Farmer Matt Henkes Rene Rios Faculty Advisor:
 Fiber optic network in ring topology  Custom software implementing a Time Division Multiplexing (TDM) scheme  Documentation summarizing conclusions.
Operating Room Instrument Rapid Delivery System sddec11-03 Group Members: Charles Ristau (Group Manager) Yik Sen Tan (Webpage Designer) Tariq Azmy (Secretary)
Multimedia & Communications ATMEL Bluetooth Background information on Bluetooth technology ATMEL implementation of Bluetooth spec.
Wireless Sensor Monitoring Group Members: Steven Shih (ECE) Brian Reilly (ECE) Dan Eke (COMPE) Sponsored by:
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
Course Presentation EEL5881, Fall, 2003 Project: Network Reliability Tests Project: Network Reliability Tests Team: Gladiator Team: Gladiator Shuxin Li.
Abstract Other Resources Financial Resources Project Schedule Personnel Efforts Item DescriptionCost STK300 Microcontrollerdonated (Kanda) GM28 Cellular.
Introduction to the Major Design Project (MDP) University of Western Ontario Faculty of Engineering Science Introduction to Engineering Design, ES 1050.
Autonomous Robot Project Lauren Mitchell Ashley Francis.
2Object-Oriented Analysis and Design with the Unified Process The Requirements Discipline in More Detail  Focus shifts from defining to realizing objectives.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
 Adviser : Dr. Lei Ying  Research Assistant: Ming Ouyang  Team Members:  Prashanth Yanamandra  Wyatt Brenneman  Taylor McKechnie  Client: ECpE.
Content Delivery In Ad-Hoc Wireless Networks. TEAM Adviser : Dr. Lei Ying Research Assistant: Ming Ouyang Team Members:  Prashanth Yanamandra  Wyatt.
Group Members Mike Svendsen – Computer Engineer Steve Towey – Computer Engineer Brian Walker – Architect Richard George – Industrial Technology Client.
Underwater Robotic Fish Phase II: Buoyancy P15029 Project Summary The objective of this project is to create an underwater robot that looks and swims like.
Devin Mullen Advisor: Professor Andrew Kun.  Background  Problem Definition  Proposed Solution  Design Objectives  Implementation and Testing  Budget.
FM CONVERTER. Team Members Dan Harkins Team Leader Beau Blackwell George Henry Shawn Welch Dr. Georgios Lazarou Advisor.
Network Enabled Wearable Sensors The Combined Research Curriculum Development (CRCD) project works with the Virtual Reality Applications Center (VRAC)
Wireless Appliance Controller TeamClientFaculty AdvisorStudent Members sdmay03-20 Senior DesignDr. Arun SomaniDonny PrabowoBenjamin Taylor Todd RoushKheng-Hin.
Team Members: Faculty Advisors: Christian BaldusDavid Roberts Dr. Arun Somani Isi OamenShawn Yockey Dr. Zhao Zhang Chair-Mounted Computer Workstation Iowa.
Preliminary Design Review Your Logo Here Team Leader: Thomas C. Null, III Team Members: Andrew Tomlinson, Matthew Gunter Faculty Advisor: Dr. Roger King.
Abstract Introduction End Product & Deliverables Resources Project Requirements Team Members: Faculty Advisors: Client: Team Members: Faculty Advisors:
LED Intelligent Lighting System Final Presentation November 28, 2007.
Bully Blue Lock Midterm Presentation 2014 Senior Design II.
Remote Control of Home Appliances PROJECT PLAN Team: ◦ Elie Abichar –CE ◦ Chris Tefer –CE ◦ Ananta Upadhyaya.
Mountain Bike Rallying Mid-term Presentation February 27, 2008.
Mountain Bike Rallying Mid-term Presentation February 20, 2008.
Android Multi-Meter (AMM)
Abstract Inexpensive ultrasonic tape measures are available that can only measure perpendicular distances to fairly large, flat surfaces. Complex environments.
Safety Motion Detector Final Presentation Senior Design I December 1, 2011.
Daredevil Robot Direction Module (DRDM) Senior Design II Midterm Presentation.
Powerpoint Templates Page Senior Design II Mid-Semester Presentation.
Introduction ProjectRequirements Project Requirements In a previous senior design project, a wireless front-end was added to Iowa State University’s Teradyne.
Smoke Notification System (SNS) Final Presentation Senior Design II November 19, 2013.
Device Interface Board for Wireless LAN Testing
Short to Medium Range Positional Device With Security (Car Locator) Hong J. Kim Thomas Na Ja Heon Ku Hong J. Kim Thomas Na Ja Heon Ku.
Communication Model for Cooperative Robotics Simulator MSE Presentation 1 Acharaporn Pattaravanichanon.
EE/CS 481 Spring Founder’s Day, 2008 University of Portland School of Engineering Authors Matthew Gridley Nathan Oliver Tim Morris Advisor Dr. Rylander.
Alternating Current Potential Drop Probe Alternating current potential drop (ACPD) testing is a relative newcomer to the area of nondestructive evaluation.
Your Interactive Guide to the Digital World Discovering Computers 2012 Chapter 12 Exploring Information System Development.
Never Wander Band MID-SEMESTER PRESENTATION SENIOR DESIGN II MARCH 3, 2015.
Cellular-Enabled Remote Camera System. Team Members Damion Cuevas Power Systems Sensors Research Josh Lunn Hardware interfacing Web page design Research.
Device Interface Board for Wireless LAN Testing Team May Client ECpE Department Faculty Advisor Dr. Weber Team Members Nathan Gibbs – EE Adnan Kapadia.
Proximity-Triggered Dog Training Collar Status Report 8 Distance detecting behavior correction dog collar 4/11/2012 Team 10: Hamad Aldossary Yagoob Alsarouj.
April 17th, 2007BEAMR1 Bluetooth Enabled Autonomous Mobile Robot (BEAMR) Sid Gaddam Major: Computer Engg. Areas of Interest: - Wireless Communication -
Supporting quality devices
A Secure Wireless Interface between Personal Digital Assistants (PDAs)
NIST TE Challenge Phase II
Presentation transcript:

Bi-Directional RF Data Communication A Robot Control Device

Team Members Matthew Merican – Team Leader Matthew Merican – Team Leader Varun Jain – Assistant Leader Varun Jain – Assistant Leader Andrew Gibbons - Secretary Andrew Gibbons - Secretary Trevor Damyan - Treasurer Trevor Damyan - Treasurer Noel Smith – Document Coordinator Noel Smith – Document Coordinator Matthew Merican

Overview A radio frequency communication device is needed for use with sophomore design projects. Dr. Hatfield has requested that a communication device be built that is capable of being mounted on sophomore robots that can send and receive signals in correspondence with a computer. Matthew Merican

Requirements Must be able to interface with an RS-232 serial DB-9 connector on robot. Must be able to interface with an RS-232 serial DB-9 connector on robot. Must have a range of at least 100 feet. Must have a range of at least 100 feet. Communication rate of at least 2400 bps. Communication rate of at least 2400 bps. Must be able to correctly operate with four other robots in operation using similar devices. Must be able to correctly operate with four other robots in operation using similar devices. All necessary documentation must be provided for sophomore use and future replication. All necessary documentation must be provided for sophomore use and future replication. Varun Jain

Requirements Must be resistant to vibration, shock, etc. Must be resistant to vibration, shock, etc. No licensing. No licensing. Plug-n-play. Plug-n-play. Must be small and light weight. Must be small and light weight. Varun Jain

Constraints Must have low power draw using portable power source. Must have low power draw using portable power source. Cost should be under $200 per unit. Cost should be under $200 per unit. Trevor Damyan

Additional Desires Error checking. Error checking. Water resistant casing. Water resistant casing. Trevor Damyan

Design Plan Research Research Derive requirements Derive requirements Determine design to implement Determine design to implement Top level Design Top level Design Low Level Design Low Level Design Build and test Build and test Demonstrate Demonstrate Noel Smith

Deliverables November 4, 2003 Client Status Report December 1, 2003 Proposal April 26, 2004 Final Product includes prototype, parts list, user’s manual, test procedures, and performance data. Noel Smith

Schedule Phase I Phase I Research Research Derive requirements Derive requirements Phase II Phase II Concept design Concept design Proposal Proposal Phase III Phase III Build and test Build and test Phase IV Phase IV Demonstrate Demonstrate Matthew Merican

Possible Design Solutions Transceiver link Transceiver link 900 MHz, 2.4 GHz 900 MHz, 2.4 GHz Wireless LAN Wireless LAN PCMCIA controller PCMCIA controller Blue Technology Blue Technology Blue Tooth wireless transceivers Blue Tooth wireless transceivers Andrew Gibbons