3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.

Slides:



Advertisements
Similar presentations
Installing & Testing Regulators
Advertisements

3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
HVAC523 Soldering.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
Identifying Equipment & Procedures Used on Propane Transports
4.1.8 Student Book © 2004 Propane Education & Research CouncilPage Selecting Piping and Tubing After completing the gas customer profile and examining.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
ExSite “ Sharing of Best Practices” The following illustrations of system interconnections are provided only as a guideline. Actual connections are dictated.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
4.1.6 Student Book © 2004 Propane Education & Research CouncilPage Designing Underground ASME Tank Installations A very important decision in designing.
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
NFPA 31 Standard for the installation of Oil- Burning Equipment
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
Student Book © 2004 Propane Education & Research CouncilPage Making Repairs or Replacements on Propane Tubing Persons who repair or replace.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Preparing Foundations for Cylinders & ASME Tanks
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Installing DOT/ICC Exchange or Stationary Cylinders
Designing DOT Exchange and Stationary Cylinder Installations
Information to the Customer
Presentation transcript:

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions and proper selection of valves and fittings. In this module you will learn to identify: 1.NFPA requirements for DOT IM tank valves and fittings 2.Precautions for tank valve and fitting replacement 3.Procedures for replacing DOT IM tank valves and fittings Replacing Valves and Fittings in DOT Intermodal Tanks

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Identifying NFPA Requirements for DOT IM Tank Valves and Fittings NFPA Edition Valve and fitting requirements for DOT IM tanks are found in columns 5 and 6 of Table (a) of NFPA 58, LP-Gas Code. Specific valve and fitting requirements are found in other sections of Chapter 2. Relief valve replacement and dip tube replacement require examination of the tank data plate.

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 & 2 Identifying Precautions for Tank Valve and Fitting Replacement It is imperative that plant personnel who perform this operation apply general safety precautions, including: Never move stationary DOT IM tanks containing propane indoors or into any enclosed space Tank valve or fitting replacement should never be done near ignition sources (no ignition sources within 25 feet), nor should they be done upwind of any open flame Never remove a valve or fitting under propane pressure Wear suitable personal protective equipment

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 & 2 Identifying Precautions for Tank Valve and Fitting Replacement It is imperative that plant personnel who perform this operation apply general safety precautions, including: Verify that the replacement valve or fitting is proper for the tank before removing existing valve(s) or fitting(s). Use suitable tools for valve and fitting removal and installation to avoid damage to them, and to prevent damage to tank connections. Remove a valve or fitting only when the replacement has been properly prepared and is in position for immediate installation. Do not leave tank openings open to the atmosphere except for the brief time needed between removing a valve or fitting, and its replacement with the new valve or fitting.

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 2 & 3 Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Steps in Replacing DOT IM Tank Valves and Fittings Step 1: Wearing personal protective equipment, reduce the vapor pressure in the tank to near atmospheric pressure Step 2: Select and prepare the appropriate replacement valve or fitting by applying an approved pipe thread-sealing compound as illustrated in Figure 1. Figure 1a. Applying Pipe Thread Sealing Compound Figure 1b. Do Not Apply to Leading Threads

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 3 NOTES: Relief valves must be properly sized for the DOT IM tank; be sure that the replacement relief valve capacity in cubic feet per minute is equal to or exceeds the requirements for the tank as given in Table (a), NFPA 58, 2001 edition. (See Figure 4) Fixed liquid level gauges and service valves incorporating fixed liquid level gauges must have dip tube lengths that correspond to the length required for the tank in which they are installed. Use a tape measure or ruler to check the dip tube length and be sure that it matches the D.T. length stamped data plate. Identifying Procedures for Replacing DOT IM Tank Valves and Fittings

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 4 Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Steps in Replacing DOT IM Tank Valves and Fittings Step 3: Check to be sure that the vapor pressure inside the tank is at or only slightly above atmospheric pressure by opening and closing the fixed liquid level gauge. Using suitable valve wrenches or ratchet handle and sockets, remove the defective valve or fitting. Step 4: Without delay, insert and hand-tighten the replacement valve or fitting. Tighten with valve wrench or ratchet handle and socket. DO NOT APPLY EXCESSIVE FORCE OR OVER TIGHTEN. Over tightening may damage the new valve, fitting or tank coupling threads. Figure 2. Valve Tools After a replacement valve or fitting is installed in a tank, the tank must be re-pressurized with propane vapor, and checked for leaks. The check for leakage is done with the tank pressurized by brushing or spraying an approved leak detection solution around the valve or fitting, then watching for bubbles. If no bubbles are observed, the solution should be washed off the tank and then the tank is wiped with a clean towel or dry rag

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 5 Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Selecting Relief Valves for DOT IM Tanks Figure 3. Data Plate for Underground DOT IM Tank

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 6 Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Figure 4. Table from NFPA 58, 1998 Edition

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 6 Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Selecting Relief Valves for DOT IM Tanks Relief valves must be installed to directly communicate with the vapor space of the tank, without bushings, valves or any intermediate fitting installed between the relief valve and the coupling welded into the tank Identifying Procedures for Replacing DOT IM Tank Valves and Fittings

3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 7 Installing Fixed Maximum Liquid Level Gauges and Dip Tubes DOT IM tank maximum filling level is based on 80% of tank volume at a propane liquid temperature of 40° F. After installing a filler valve, relief valve or vapor equalizing return valve, be sure that the appropriate weather cap is installed on the valve to prevent moisture and other material from accumulating in the valve opening. Identifying Procedures for Replacing DOT IM Tank Valves and Fittings Figure 5a. Data Plate—500 Gallon AG Tank (Dip Tube 10.7 Inches) Figure 5b. Data Plate—500 Gallon UG Tank (Dip Tube 7.5 Inches)

3.7.7 Student Book © 2004 Propane Education & Research CouncilPages 8 & 9 Time to See If You Got the Key Points of This Module… Complete the Review on page 8. See if you are ready for the Certification Exam by checking off the performance criteria on page 9.