11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.

Slides:



Advertisements
Similar presentations
First pass study 3 scenarios of possible locations of PSA storage cabinets in the CUORE hut Prepared for
Advertisements

Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Manual Flo-tap Installation Instructions
C T A Camera Mechanics Rich Northrop University of Chicago 1 Design Review Argonne May 9, 2014 Final.
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
BSC Cable Trays … again: Evaluation of an LLO Proposal for an Alternative Design G v31.
"AIR COOLER" Heat Exchanger
ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Cryo Capture Cavity II Progress Mike McGee April 13, 2005.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
CERN, November 25, 2003 – Technical Board Support chariot for ITS & FMD services on the RB24 side Foreward –This presentation reports the current ideas.
Compressor status AWAKE Technical Board meeting 19 May 2015.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
O Ring Groove (1) Bolt holes for fastening strongback to TPC wheel (26) SHV feedthroughs to feed HV wires to ABDB on side ports, all connectors are vacuum.
PLANOMETRIC VIEW OF A KITCHEN.
PREPARED BY: NOR HELYA IMAN KAMALUDIN
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
MC Type-B fit up review1 Review of MC Type B assembly clearances reviewing A-to-B and B-to-C interfaces 3/1/07 Summary: Wing interfaces look okay between.
CUORE Clean Room Robin Lafever LBNL LNGS 9/18/2015Robin Lafever LBNL, LNGS1.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
Malte HildebrandtDC Status Report, Dear MEG Committee,PSI, April 14 th 2009 this is the first report concerning the drift chamber status as.
U N C L A S S I F I E D Progress Report on the Dual-Use Cryostat John C. Ramsey Los Alamos National Laboratory.
Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
After considerable pushing and shoving, this configuration show some promise. I have taken some liberties with the geometry and turned mounts inside-out.
Comparing 2D and 3D Structural Analysis Workshop 4.2.
HV-SQUID Compatibility Test Study the SQUID performance in a HV environment. Study the HV breakdown –in superfluid under pressure. –using different materials.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
Refurbished Booster RF John Reid October 24, 2012.
Cold Magnetic Shield Update
GlueX Two Magnet Tagger G. Yang University of Glasgow Part 1, 3 D Tosca analysis. Part 2, Preliminary Drawings. Part 3, Proposed Assembly Procedures (i)
Long Bo for LAPD Hans Jostlein10/20/2011 December 15, 2015 Long Bo for LAPD 1.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
A 128 fiber Slit-Plate assembly, Kinematic mount
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Comparing 2D and 3D Structural Analysis Winter Semester
PSA Layout studies-2 6/12/2016Robin Lafever LBNL1 In mid April 2008, a series of studies was conducted to attempt to accommodate the desire to place the.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
HQ02a Magnet Interfaces at FNAL D.W. Cheng 3/6/2013.
Recent Changes to the FD TPC Design Bo Yu Oct. 20, 2015.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
ProtoDUNE – DSS Installation, Alignment and QA
Design of the Injection Can
Update on He3 Services design since the ORNL meeting
NP04 CPA/FC/HV Interfaces
TPC Support and Constraint TPC Support
Test box for ProtoDUNE SP – Integration Test
OCP Mezz 3.0 Mechanical Recommendations
LCLS-II SPQA Magnet Leads Soldering
Hall C Down Stream Beam Pipe And Dump Interface Design
NIC v3.0 Mechanical Discussion
Mechanical Discussion
Errecting TMS-580 Control room CT /-PT Platform.
Informal meeting of cryogenic payload
Cryomodule Assembly Plan
Bunker Wall Design Wall ESS
Presentation transcript:

11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications

11/30/20152Robin Lafever 300 K Flange with cryostat As is currently appears in our CAD model

11/30/20153Robin Lafever 300 K Flange with cryostat As is currently appears in our CAD model Here are my interpretations of the Suspension rods.

11/30/20154Robin Lafever 300 K Flange, MODIFIED Note: 6 suspension rods are shown in accordance with yesterdays phone conversation. The rods are clocked 30 degrees to avoid interference with other hardware on the Flange The radius is arbitrary, at the moment, but we need enough radial space to accommodate Hangers, Adapter flanges, and Lift-cable feed-throughs.

11/30/20155Robin Lafever 300 K Flange, MODIFIED An adapter Flange is added to allow installation of the Radon Barrier The adapter could be mounted on the Top or Bottom, both work.

11/30/20156Robin Lafever 300 K Flange, MODIFIED The Radon barrier is installed. In addition to a radon barrier, this also provides vibration isolation. The outer edge mates to the Clean Room Radon barrier. This needs to be on the plane shown to allow installation of the Farraday cage connection to the Lead Shield, below.

11/30/20157Robin Lafever 300 K Flange, MODIFIED In addition, feed-through assemblies are required for the Lifting assembly. The radial position and feed-through details are not known at the moment, but this treatment shows Radon Seals and cables inside the adapter flange.

11/30/20158Robin Lafever 300 K Flange, MODIFIED Bottom view Note that the Suspension assemblies Are potential Radon leaks and need seals. The details are not known to me, however, I Show an assembly that could incorporate O-ring packing glands.

11/30/20159Robin Lafever Top section view showing Suspension hardware, Cable feed-throughs, and the adapter Flange with Radon Barrier/vibration isolator Note that the feed-through will need some radial space, TBD.

11/30/201510Robin Lafever Bottom section Again, note that the suspension Hardware needs a Radon seal Again, this is a potential Radon leak And will need some kind of seal. I do not know what the actual details are.