Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Hydro Peaking Capacity Analysis & Northwest Regional Forecast Comparison Resource Adequacy Technical Committee July 28, 2010.
Power Supply Adequacy Assessment Model/Methodology Review Steering Subcommittee Meeting January 29, 2010.
1 Generation Adequacy Task Force Report to TAC April 7, 2005.
Genesys Model Enhancements October 4, 2011 NW Resource Adequacy Steering Committee Meeting Gwendolyn S Shearer.
Reliability Risks and Lessons Learned In The Wake Of The Polar Vortex OPSI Annual Meeting October 14, 2014.
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
A Resource Adequacy Standard for the Pacific Northwest Resource Adequacy Technical Committee January 17, 2008 Portland Airport.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Developing an Adequacy Metric Resource Adequacy Forum Technical Subcommittee Meeting October 16, 2009.
Power System Research, Inc. Review of the PNW Adequacy Standard Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Adequacy Assessment for the 2017 Pacific Northwest Power Supply Steering Committee Meeting October 26, 2012 Portland, Oregon 1.
Revising the Pacific Northwest Resource Adequacy Standard Resource Adequacy Technical Committee June 23, 2011.
Wind ELCC Calculation Comparisons and ERCOT’s NERC LTRA Capacity Forecasts GATF Meeting, June 24, 2014.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
Illustrative FCRPS Examples Comparing Capacity Adequacy Calculations for Federal Hydro- Dominated System Mary Johannis PNW Resource Adequacy Technical.
Northwest Power and Conservation Council Action Plan Summary.
Comparison of LOLP Practices Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23, 2009.
Powered by the Loads and Resource Information System (LaRIS) Pacific Northwest Loads and Resources Operational Peaking Adjustment Council Briefing.
RELIABILITYFIRST CORPORATION Long Term Resource Assessment 2010 – 2019 Board of Directors Meeting September 30, 2010 Presented by Jeff Mitchell.
Proposed Contract to Perform Regional Sustained Hydro Peaking Capability Study Mary Johannis PNW Resource Adequacy Steering Committee January 29, 2008.
May 31, Resource Adequacy Capacity Standard Resource Adequacy Forum Technical Committee May 31, 2006 Background Image: Bennett, Christian Science.
June 27, Pacific Northwest Resource Adequacy Assessment for 2010 and 2012 Resource Adequacy Forum Steering Committee Meeting Northwest Power Pool.
Resource Adequacy Technical Committee Meeting April 6, 2011.
Evaluating Hydro Capacity for Capacity Adequacy Standard: Selection of Hydro Events Mary Johannis PNW Resource Adequacy Technical Committee Mtg November.
Rocky Mountain Area Transmission Study Steering Committee Meeting January 13, 2003 RAWG proposed Alternatives.
January 29, 2010Resource Adequacy Steering Committee 1 Sustained Peaking Capacity Analysis Initiated by the Adequacy Forum Input Information from Utilities.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
EFFECTIVE LOAD CARRYING CAPABILITY FOR WIND-POWER.
2009 Pacific Northwest Resource Adequacy Assessment Resource Adequacy Technical Committee October 16, 2009.
2010 Work Plan Steering Committee January 29, 2010.
Moving toward a Final Resource Adequacy Standard Resource Adequacy Forum Steering Committee Meeting September 27, 2007.
Providing Resource Planning Guidance to Individual Utilities PNW Resource Adequacy Steering Committee Meeting April 13, 2007.
Work Plan Resource Adequacy Forum Technical Committee July 29, 2009.
Capacity Metric & Hydro Capacity Assessment Decisions Mary Johannis PNW Resource Adequacy Technical Committee Meeting June 20, 2007.
Northwest Resource Adequacy Implementation – Update ---- DRAFT ---- NW Adequacy Forum Technical Committee May 31, 2006.
Resource Adequacy Assessment for 2015 Resource Adequacy Forum Technical Committee Meeting October 1, 2010.
Pacific Northwest Resource Adequacy Assessment for 2011 and 2013 Resource Adequacy Forum Steering Committee Meeting July 21, 2008.
Economic Adequacy Target Resource Adequacy Forum Steering Committee September 27, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Sustained Hydro Peaking Capacity Contract with Don Long Finalizing Phase II SOW Mary Johannis PNW Resource Adequacy Technical Committee Mtg January 23,
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
Probabilistic Approach to Resource Adequacy Resource Adequacy Forum Technical Committee Meeting Portland, OR January 23, 2009.
RFPEG2013 PRE-BID MEETING RFPEG2013 – Pre-Bid meeting January 9, 2014 Presentation by Derek Davis – Public Utilities Commission.
Defining LOLP Resource Adequacy Forum Technical Subcommittee Meeting November 14, 2008.
Steering Committee Meeting March 9, Why talk about assumptions? Garbage in, garbage out! “Let’s go dumpster diving!” Results sensitive to key.
2010 Northwest Regional Forecast Resource Adequacy Technical Committee April 22, 2010.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Power Supply Adequacy for the 2021 Operating Year Resource Adequacy Advisory Committee Steering Committee Webinar June 8, 2016.
Demand Response in the 7th Power Plan
Draft Chapter 12: Bonneville Obligations
Steering Committee Webinar March 25, 2016
Resource Adequacy Assessment for 2015 Interim Results Resource Adequacy Forum Technical Committee Meeting July 28, 2010.
Economic Adequacy Standard
Pacific Northwest Resource Adequacy Assessment
Technical Committee Meeting January 27, 2012
Draft Chapter 12: Bonneville Obligations
Steering Committee Webinar March 25, 2016
Capacity Analysis in the Sixth Plan
Technical Committee Meeting March 18, 2016
Progress on Resource Adequacy Assessment for 2017
Status of the Resource Adequacy Forum
Resource Adequacy Steering Committee Meeting October 4, 2011
Resource Adequacy Technical Committee Meeting April 22, 2010
Presentation transcript:

Guidance for Utility Adequacy Assessments Steering Committee Meeting January 29, 2010

Resource Adequacy Steering Committee Meeting 2 Outline Arguments For Utility Guidance Arguments Against Utility Guidance Current Regional Adequacy Standard Potential methodology to provide guidance

January 29, 2010Resource Adequacy Steering Committee Meeting 3 Arguments For Utility Guidance Could help make utility planning more consistent throughout the region Would make utility planning consistent with the Council’s power plan Would help utilities with smaller long-term resource planning budgets

January 29, 2010Resource Adequacy Steering Committee Meeting 4 Arguments Against Utility Guidance Could be perceived as infringing on the jurisdiction of individual utilities Would be very difficult to develop a precise tool Could be misused as a surrogate for a long- term planning process

January 29, 2010Resource Adequacy Steering Committee Meeting 5 Current Regional Adequacy Standard Measures Energy: Annual average generating capability must equal annual average load –Includes an amount of non-firm resources derived from an LOLP analysis Capacity: Sustained-peak generating capability must equal sustained-peak load plus a reserve margin –Sustained-peak generation includes some non-firm resources –Reserve margin is derived from an LOLP analysis that includes some non-firm resources

January 29, 2010Resource Adequacy Steering Committee Meeting 6 Possible Approach for Utility Energy Measure Annual generating capability = annual load Amount of non-firm generation to include is a function of total non-firm available to the utility plus other factors This function has not yet been defined

January 29, 2010Resource Adequacy Steering Committee Meeting 7 Possible Approach for Utility Capacity Measure Sustained-peak generating capability = sustained- peak load plus a reserve margin Sustained-peak generation includes some non-firm generation, which is a function of total non-firm available to the utility plus other factors The reserve margin is a function of the total non- firm available to the utility plus other factors This function has not yet been defined