Doc.: IEEE 802.11-10/0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-11 Abstract:

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0955r3 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-18 Abstract:
Advertisements

Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC Closing Report– January 2012 Date: 19 January 2012 Discussion topics.
Doc.: IEEE r0 SubmissionBruce Kraemer, MarvellSlide 1 Smart Grid SC– January 2012 Date: 18 Janaury 2012 Discussion topics during November.
Doc.: IEEE /1210r1 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Discussions 2010 Date: 2010-October-18 Abstract:
Doc.: IEEE r0 SubmissionSlide 1 Smart Grid SC– March 2012 Date: 15 March 2012 Discussion topics during March Waikoloa Session NameCompanyAddressPhone .
Doc.: IEEE /0984r0 Submission September 2008 John R. Barr, Motorola, Inc.Slide 1 Bluetooth test cases with n 40 MHz Date: Authors:
Doc.: IEEE /0955r4 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-25 Abstract:
Doc.: IEEE /441r0 Submission September 2001 Steve Shellhammer, Symbol Technologies Slide 1 IEEE P Working Group for Wireless Personal Area.
Intro to Network Design
Doc.: IEEE /1542r0 Submission November 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC– November 2011 Date: 08 November 2011 Discussion topics.
Doc.: IEEE /1112r0 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 10 August 2011 Discussions during.
Doc.: IEEE e Submission: NAN Application Description 11 November 2008 RolfeSlide 1 Project: IEEE P Working Group for Wireless.
Doc.: IEEE /1202r1 Submission October 2004 C. Wright, Azimuth SystemsSlide 1 Proposed Metrics for TGT and Call to Action Date: Oct 21, 2004 Author:
Doc.: IEEE /0878r0 Submission July 2012 Timo Koskela, Renesas Mobile CorporationSlide 1 On the Channel Switching in ah Date:
Doc.: IEEE /0955r0 Submission July 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-July-28 Abstract: Discussion.
1 WP2: Communications Links and Networking – update on progress Mihael Mohorčič Jozef Stefan Institute.
Doc.: IEEE /1180r2 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-13 Abstract: Discussion.
Doc.: IEEE /1340r0 Submission September 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid SC–Closing Report- September 2011 Date: 22 September 2011.
Doc.: IEEE 11-04/0319r0 Submission March 2004 W. Steven Conner, Intel Corporation Slide 1 Architectural Considerations and Requirements for ESS.
Doc.: IEEE /0720r1 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Doc.: IEEE /1396r0 Submission November 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Summary input to PAP#2 Report – November 2010 Date: 2010-November-12.
Doc.: IEEE /0092r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /0174r0 Submission January 2010 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /1112r2 Submission August 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – August 2011 Date: 17 August 2011 Discussions during.
Doc.: IEEE /0506r2 Submission Doc.: IEEE /720r0 May 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid ad hoc – May 2011 Date: 09 May 2011.
Doc.: IEEE /0955r5 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-September-01 Abstract:
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
Doc.: IEEE /327 Submission July 2002 Intel Research and Development Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /1180r0 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Closing Report 2010 Date: 2010-September-13 Abstract: Discussion.
Doc.: IEEE g Submission November, 2010 Roberto Aiello, ItronSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /759r0 Submission November 2002 Bruce Kraemer, Intersil TK Tan, PhilipsSlide 1 Proposal to Amend a to address Japanese bands.
Doc.: IEEE /0955r6 Submission September 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-September-08 Abstract:
Doc.: Submission S. Max, G.R. HiertzSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs)
Doc.: IEEE /0506r0 Submission January 2007 Bruce Kraemer, MarvellSlide 1 IMT-Advanced Report Tech Requirements Outline Date: Authors:
Doc.: IEEE /1180r1 Submission October 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Activity Report 2010 Date: 2010-October-06 Abstract: Discussion.
IEEE Smart Grid TAG July 2013 working document
Discussion of n System Requirements
Smart Grid Technology Discussions 2010
13-May-2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Some MAC Requirements for Neighborhood Area.
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SRM related functions in ]
W-SUN Technical Requirements Discussion
March 2003 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: MDMA: The economic RF technology for the Wireless.
November 18 July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Task Group 4e definitions Date.
Smart Grid Technology Discussions 2010
EC actions/agenda items for Friday, July 20, 2007
Wireless Characterization for NIST PAP#2
Smart Grid Summary input to PAP#2 Report – November 2010
Energy STAR ad hoc Closing Report - January 2010
Smart Grid ad hoc Closing Report – May 2011
Smart Grid Technology Discussions 2010
Smart Grid Closing Report – November 2010
Smart Grid Teleconferences – Jan-Mar 2011
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Intended IG Objectives] Date Submitted:
Wireless Characterization for NIST PAP#2
Smart Grid Technology Discussions 2010
Smart Grid Activity Report 2010
<month year> <doc.: IEEE doc> January 2013
Smart Grid SC–Closing Report- September 2011
Smart Grid ad hoc Closing Report - May 2010
Smart Grid ad hoc – July – SGIP 2 - NIST PAP2 3- ITU Liaison
Smart Grid Update – January 2011
Smart Grid Summary input to PAP#2 Report – November 2010
Smart Grid Technology Discussions 2010
Smart Grid ad hoc Closing Report – January 2011
Smart Grid Technology Discussions 2010
Smart Grid Closing Report – November 2010
Smart Grid ad hoc-Closing Report - July 2010
Smart Grid Technology Discussions 2010
Presentation transcript:

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 1 Smart Grid Technology Summer 2010 Plans Date: 2010-August-11 Abstract: Discussion PAP#2 Report NameCompanyAddressPhone Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, Kaberi Banerjee

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 2 Call Agenda Comments on the content of the NIST PAP#2 report, r5. R5 was posted at: sggrid/pub/SmartGrid/PAP02Wireless/NIST_Priority_Actio n_Plan_2_r05.pdfhttp://collaborate.nist.gov/twiki- sggrid/pub/SmartGrid/PAP02Wireless/NIST_Priority_Actio n_Plan_2_r05.pdf Other items?

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 3 NIST Timeline Release of draft 0.6 Release of Version 1 Draft 0.5 July 28, 2010 Call for Input to Section 6 August 4, 2010 End of draft 0.5 review period September 15, 2010 December 3, 2010 November 4, 2010 SGIP face-to-face, Chicago PAP 2 meeting OpenSG meeting, Miami Tentative PAP 2 meeting SGIP face-to-face, St Louis Tentative PAP 2 meeting September 16, 2010 End of draft 0.6 review period September 30, 2010 October 29, 2010

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 4 NIST Expectations Release 0.6 contains mature contents for all sections Minor changes are expected between release 0.6 and 1.0 to allow for NIST internal review process Technical contributions in the form comments to current draft and/or new material shall be posted on the twiki and made publicly available Technical contributions will be processed as they are received up to the end of the review period –Allow time to provide comment resolution and reach consensus prior to the close of the review period.

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 5 Next NIST PAP 2 meetings SGIP meeting in St Louis, September 16, 2010? –Is there a need for a PAP 2 meeting? Co-located with OpenSG meeting, November 4, 2010, Miami FL. SGIP meeting, December 1-3, 2010, Chicago, IL

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 6 Comments received during/following August 4

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 7 Availability - 1 Hello all, I wanted to start a discussion on Link Availability (Section on p. 23) as a continuation of our discussion on the call earlier today. Currently the text mentions that Link Availability is affected by devices being in sleep mode, or by propagation conditions and interference: Sleep mode is generally configurable and optional (can be turned off), so one technology is not going to offer less availability than another due to the presence of sleep mode capabilities because sleep mode can be configured appropriately or be turned off. Perhaps the availability of sleep mode should just be considered an energy efficiency mechanism and discussed in Section ? Propagation conditions and interference affect availability of a link across all wireless technologies. What differs between different wireless technologies is how resilient they are to interference, multipath, etc., which is discussed in Section Though these kinds of techniques can generally be employed across different technologies so it’s hard to say that they are specific to a given technology and can thus be used to compare different technologies. Are there additional dimensions to the Link Availability metric that are part of the intention behind this section but are not captured in the text? I look forward to your comments. Jorjeta

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 8 Availability - 2 Jorjeta and all, Availability can be very focused or a rather expansive topic. I believe that sleep mode and interference are potentially problematic in mixing concepts. When designing an RF segment to be used by an application the duty cycle (sleep mode) and RF link reliability are a couple of the factors that go into the availability of the link as seen by an application. For example, if one were to PING across a link from an NMS application other factors come into play. I am hitting on some of them below. If we are speaking to the RF link alone, availability is dependent upon, but not limited to: - link budget: the received signal level above the thermal noise floor necessary to receive a signal with the appropriate margin (different margins [dB] imply a different reliability [%]). NIST has produced a robust link budget calculator (available on the web) that covers the topic in much greater detail. - SNR margin: additional margin to account for harmful interference which is dependent on the technology in use and the permissible operational rules relating to the spectrum use/users

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 9 Availability - 3 Designed Availability: However, when describing the that the radio link is needed by the application, it implies far more than just the RF layer but also the availability of the connection (end-to-end). In many circles this is aligned more with site availability (the Uptime Institute has an excellent document covering the topic regarding Tier Classifications) and includes: - Hardware element availability (MTBF/MTTR) - System component redundancy - Distribution paths (this aligns well with the wireless topology [mesh, PTM, PTP, etc.) - Power redundancy - Fault tolerance Duty Cycle: this is relative to the percentage of time the link is designed to be available for use and tends to be dependent upon technology or operator settings (such as to conserve battery life or comply with MPE limits). In a single point of failure (no HW, backhaul, power redundancy design), one will find that ~99.5% is a designed system reliability. With redundancy in the systems (HW and/or power and/or distribution paths) is achievable before RF availability is considered. Actual reliability will take into consideration the reliability of RF, the reliability of the system elements, the duty cycle and the operational practices of the system operator (change control, maintenance practices, etc.) Actual system reliability (as one would expect to see measured from a Network Management System report [i.e. an application]) must factor all these element in. Jake Rasweiler

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 10 Peter Ecclesine comments == Preface v0.5 Hughes (ignoring the fact that SG applications requirements evolve, yielding to experience rather than remain locked in 1989 or 1999 or 2009 economics) Para 2 The decision to apply wireless for any given set of applications is a local decision that must be made by the system designers. These decisions must take into account several important elements. Smart Grid applications requirements must be defined with enough specificity to quantitatively define communications traffic and levels of performance. Applications requirements must be combined with as complete a set of management and security requirements for the life-cycle of the equipment. Requirements are then used as a backdrop to assess the candidate wireless technologies. = changed to = Para 2 Smart Grid applications requirements must be defined with enough specificity to quantitatively define communications traffic and levels of performance over the lifetime of the applications. Applications requirements must be combined with as complete a set of management and security requirements for the life-cycle of the equipment. The decisions to apply wireless for any given set of applications can then be based on expected performance and costs over the projected useful lifetimes of the spectrum and equipment. == Prepared definitions Definition of Packet Radio should be removed. Rate adaptation should be replaced by Link adaptation, including changing Modulation, Coding Scheme, smart antennas, hopping patterns, == 2_r04.pdf Definitions to refine or remove: (unused) Generally Accepted Privacy Principles – include Web accessed groups like Truste and Better Business Bureau. (look at AT&T and Verizon Privacy Web pages) (unused) Last Gasp – all are proprietary, none scale Web Portal Section Indoor-indoor radio propagation models There should be a with indoor-indoor noise including basement/garage woodworking tools, sheetmetal shop, garage door opener, washer/dryer, hair-dryer, etc. Let there be man-made noise or our models work in a vacuum.

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 11 Call for Contributions to Section 6 Suggested Outline Factors affecting performance, i.e. reliability, delay, throughput –Channel conditions such as distance, transmitted power, interference, propagation environment –Traffic load –Number of users Seeking volunteers?

doc.: IEEE /0955r2 Submission August 2010 Bruce Kraemer, MarvellSlide 12 Section 6 – Default Suggestions 6. Findings / Results Does wireless technology X meet SG-Network requirements –Performance Metrics –Reliability –Latency –Scalability –meets throughput needs –handles the number of devices needed –range –interference immunity –By actor to actor / Link by link which is the best to use –How does its work in urban, sub-urban, rural –How well does it propagate (e.g. walls, basements, vaults, clutter, hills) –scalability over a quantity of end points –Equipment required to operate –Include processing time between actor to actor