CIM Test Methodology Overview John Simmins 5/3/2011.

Slides:



Advertisements
Similar presentations
Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
Advertisements

02/03/2006EBT and EDI Overview1 Electronic Business Electronic Data Interchange (EDI) & Electronic Business Transactions (EBT) Standards.
May 2010 Slide 1 SG Communications Boot Camp Matt Gillmore 03/07/11.
Home Area Networks …Expect More Mohan Wanchoo Jasmine Systems, Inc.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 5/3/2011.
Verification Planning and Compliance Matrices Brian Selvy Wednesday, August 13, :30 – 5:00 p.m. Phoenix West Conference Room.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP8/14 Webconference December 4, 2012.
Validata Release Coordinator Accelerated application delivery through automated end-to-end release management.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
# 1 Information Exchange Standards Development Collaboration for AMI and HAN For further information, contact: Wayne Longcore
EPRI Smart Grid Demonstration and CIM Standards Development
October 19, 2009OpenSG - AMI-ENTERPRISE1 The Framework, Standards, and Plans AMI-Enterprise Service Definition Team.
SE Document Document Control Software. SE Document SE Document is a Document Management Software System to help you meet all document control requirements.
Kinetiq Canada Savage Data Systems
B usiness T echnology S olutions AMI – Advanced Metering Infrastructure Consumers Energy Mark Ortiz March 9, 2011.
Hot Checkout System for Accelerator Operations at JLab Ken Baggett (Team Leader) Theo Larrieu Ron Lauzé Randy Michaud Ryan Slominski Paul Vasilauskis.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.
Campus Solutions Self Service: Students. The Student Center Enrollment Weekly Schedule Account Inquiry Holds Meningitis Acknowledgement Form Addresses.
Interoperability Tests for IEC Scott Neumann November 12, 2009.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
© Copyright 2013 TONE SOFTWARE CORPORATION. Confidential and Proprietary. All rights reserved. ® Operator Training – Release Alarms Suppression and.
Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2010 SISCO, Inc – 9 Meter Reading and Control.
Project CIM Test Development Process John Simmins Weekly Status and Planning Meeting 2/1/2011.
© 2008 Eventure Events. All rights reserved. Standard interfaces & lower TCO in AMI Klaus Heiman, Wayne Longcore SAP, Consumers Energy.
Common Information Model and EPRI Smart Grid Research
EDISON INTERNATIONAL® SM SCE Project Story CIM User Group 10/12/2010 Jim Horstman Southern California Edison.
Metadata IN Smart Grid Group Name: REQ
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/29/2011.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/21/2011.
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Status Report (Palo Alto, Jan. 09) Joe Zhou.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/19/2011.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
CIM for Weather A joint project of: - Southern California Edison (SCE) - EPRI - Open Grid Systems Pat Brown EPRI Senior Project Manager CIMug - Prague.
INFO 637Lecture #101 Software Engineering Process II Review INFO 637 Glenn Booker.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
AEP's gridSMART sm Project Greg Steinmetz AEP gridSMART sm 11/12/2009 AEP's gridSMART Project - Implementation of CIM within Metering/AMI South Bend pilot.
Service Definition Technical Guide AMI-Enterprise.
CIM Test Methodology Overview John Simmins 5/24/2011.
SG Systems - Service Definition Team Chair: Gerald Gray, Guiding Principle Consulting Co-Chair: Shawn Hu, Xtensible Solutions.
Service Definitions A Framework For Standard Interface Development.
1 TOWER CONSTRUCTION NOTIFICATION SYSTEM ENHANCEMENTS March 30, :00 PM Room 6-B516 of the Portals II Building 445 Twelfth Street, SW Washington,
M ONITOR & C ONTROL Focus is on Integrated Change Control 1.
# 1 Application Integration Architecture A Framework For Standard Interface Development Gerald R. Gray, Consumers EnergyJune 23, 2008.
Project CIM Test Development Process
Benefits of Utilizing an Advance Pay Program ‘Not just a new way of billing, but a new way of living’
# 1 AMI Enterprise Task Force of the Utility AMI Working Group SRS Team Plan Discussion For further information, contact Joe Zhou Team Lead
Erich W. Gunther UtilityAMI Chairman/Facilitator Chairman/CTO – EnerNex Corporation Jerry Melcher Onsite facilitator for this meeting.
Project Management Basics
Overview AMI-Enterprise For further information, contact: Wayne Longcore Chair of AMI-Enterprise Task Force, Board Of Directors.
CIM Test Development Process John Simmins Weekly Status and Planning Meeting 3/15/2011.
AMI -ENT Service Definition Team Step-by-Step Modeling and Artifacts Generation Process.
Timesheet training Version: Introduction Duration: 1.5 hours Purpose: Guide on how to use Timesheet.
© 2010 EnerNex Corporation. All Rights Reserved. CIM Test Development Process EPRI Project January 2011.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
© Siemens Energy, Inc Energy Automation CIM Model Manager Report Kurt Hunter CIM Users Group Meeting 13 Nov 2009.
Project CIM Test Development Process John Simmins Project Overview 1/27/2011.
3 rd Party Registration & Account Management SMT Update To AMWG May 24, 2016.
CIM Test Development Process
CIM Test Methodology Overview
Remember to remind the group to jump in with questions as we go
CIM Test Development Process
Final Design Authorization
Use Case Process with Examples Kay Stefferud
Interoperability Test Message Patterns for IEC
Interoperability Test Message Patterns for IEC
Interoperability Test Message Patterns for IEC
Presentation transcript:

CIM Test Methodology Overview John Simmins 5/3/2011

2 © 2010 Electric Power Research Institute, Inc. All rights reserved. Agenda 1.Progress since last meeting 2.Issues, opportunities and risks arising during the previous week 3.Verify progress against stakeholder expectations 4.General issues discussion 5.Action items for individuals 6.Expected work output during next week

3 © 2010 Electric Power Research Institute, Inc. All rights reserved. Progress Since Last Call 3 Webinars with Vendors –WednesdayMay 4 11:00 AM - 12:00 PM –FridayMay 6 9:00 AM - 10:00 AM –Monday May 9 12:00 PM - 1:00 PM.

4 © 2010 Electric Power Research Institute, Inc. All rights reserved. Verify Progress with Stakeholders Walk though Test Artifacts –Test Cases –Test Procedures –Vendor Package Samples for Remote Disconnect/Reconnect Test

5 © 2010 Electric Power Research Institute, Inc. All rights reserved. System Engineering-based Approach Southern California Edison (SCE) Use Cases Requirements Design and Implement Test Program SCE and AMI Enterprise (AMI-ENT) Requirements All Vendors Reusable Methodology Allows Additional Tests to be added at any Time Requirements derived from use cases map to test procedure steps

6 © 2010 Electric Power Research Institute, Inc. All rights reserved. EPRI CIM Part-9 Interoperability Test Cases 5 Major Test Case Areas Scheduled Meter Read On Demand Meter Read Local Area Outage Detected by Meters Tampering Detection Remote Disconnect/Reconnect

7 © 2010 Electric Power Research Institute, Inc. All rights reserved. Walk through of CIM Test Artifacts For Meter Disconnect/Reconnection Tests –Part 9 Meter Disconnect Reconnect Abstract Test Case –ECITP 2.09 Test Procedure –Vendor Package

8 © 2010 Electric Power Research Institute, Inc. All rights reserved. Abstract Test Case –Test Description Test Description: CIM standard Part-9 meter messages to/from the Meter Data Management System (MDMS) and from/to the Customer Information System (CIS) are verified to be in conformance with the IEC part 9. Unit or Systems Under Test (SUTs/UUTs) are the MDMS and CIS or equivalent systems. A scheduled meter disconnect is initiated with the MeterServiceRequest message and the meter reading data is sent in the MeterReadings message. A scheduled meter reconnect is then initiated with the MeterServiceRequest message and the meter reading data is again sent in the MeterReadings message. As shown in diagram MR , the main test steps are as follows: 1)The MeterServiceRequest messages is sent from the CIS to the MDMS.. 2)The EndDeviceControl message is sent from the MDMS to the AMI Head End or similar system. 3)The meter performs a remote disconnect. 4)The MeterReadings message is sent from the MDMS to request meter usage data for the meter. 5)The CreatedMeterReading is sent from the meter/simulator to the MDMS and onto the CIS. The required IEC part 9 XSD is used to send the CreatedMeterReading message. 6)System error conditions e.g. missing and incomplete data reads are simulated and correct error processing verified.

9 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Case Sequence Diagram

10 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Case Requirements Nominal and Error requirements Use Case B AMI-ENT version REQ Customer representative shall be able to schedule Date and Time for electric service turn On/Off and electric service limiting using AMI back office system(s). See Use Case B2 ver AMI-ENT version REQ The AMI Head End shall periodically send electric service turn off messages to the Meter until the Meter acknowledges that the turn off has been completed successfully Use Case B2 ver AMI-ENT version REQ0027 REQ-B2001-Send scheduled turn off notification Use Case B2 ver AMI-ENT REQ-B2002-Send scheduled turn off command Use Case B2 ver AMI-ENT REQ-B2003-Send scheduled turn off command confirmation Use Case B2 ver AMI-ENT REQ-B2004-Send meter read (final) Use Case B2 ver AMI-ENT REQ-B2007-Send scheduled turn on command Use Case B2 ver AMI-ENT REQ-B2008-Send scheduled turn on command confirmation Use Case B2 ver AMI-ENT REQ-B2009-Send meter read (initial) Off nominal and error requirements Use Case B1 REQ0201 v1.2 - The Meter Data Unification System shall have the ability to automatically identify and immediately log missing or incomplete data from the previous day. Use Case B1 REQ0202 v1.2- The Meter Data Unification System shall have the ability to identify and log Meters that have had missing or incomplete data in the past. Use Case B1 REQ0203 v1.2- The Meter Data Unification System shall identify and log Meters where missing or incomplete meter data for the previous day was successfully recovered through the automated on-demand read request.

11 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Case UML Diagrams Figure MR : EndDeviceControl UML Definition, from Revision / Edition: 1.0 Date: 09/00/09

12 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Procedure X-291 Diagram

13 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Procedure Detailed Test Steps Step #Ref. # Source Component Destination Component Detailed StepCompletedPass/Fail Notes/ Discrepancies 1 Use Case B AMI-ENT version REQ0224 CISMDMS Request a meter disconnect for one meter for a specific date and time. 2 IEC version 10v30, EndDevice- Control XSD MDMSMeter MDMS sends an EndDeviceControl message for a meter disconnect. 3IEC version 10v30, EndDevice- Control XSD MDMSMeterVerify MDMS sends EndDeviceControl message to the meter. Record and save the content of the message. Verify meter performs the disconnect operation. Verify the MDMS records the meter disconnect status in the log. ECITP 2.09 CIS to MDMS Disconnect/Reconnect Interoperability Detailed Test Steps

14 © 2010 Electric Power Research Institute, Inc. All rights reserved. Test Procedure Execution Record Test ECITP 2.09 CIS to MDMS Interoperability Test Record Test date: ___________________________________ Test time ____________________________________ Test witnesses: ________________________________ ______________________________________________ Test PASS/FAIL EndDeviceEvent, IEC version: 10v30, XSD Notes: ____________________________________________________ System Under Test (SUT): ______________________________ SUT version/release identifier: __________________________ SUT IS / IS NOT currently released Test Configuration notes and restrictions: ____________________________________________________

15 © 2010 Electric Power Research Institute, Inc. All rights reserved. Current Demonstration – Vendor Package Based on SCE Use Case D4 - Distribution operator locates outage using AMI data and restores service Single document with all necessary demo material –Use case requirements mapped to individual test steps –OMS, MDMS and AMI Head End test steps –WSDLs and XSDs –Sample meter outage EndDeviceEvent message

16 © 2010 Electric Power Research Institute, Inc. All rights reserved. Expected Work Output During the Next Week Report Format for remaining demonstration packages

17 © 2010 Electric Power Research Institute, Inc. All rights reserved. Questions & Contact Informatation John J. Simmins, Ph.D. Senior Project Manager – Smart Grid Electric Power Research Institute (EPRI) 942 Corridor Park Blvd. Knoxville, TN (Office) (Cell)